Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAccepted-AOC 73 MANNATHAN VEETHI VELLIYAMPALAYAM ANDHIYUR TALUK ERODE DISTRICT | ERODE | TAMIL NADU | 638001 | ₹4.6 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹4.6 LRejected-Finance | ₹4.6 L | L2 | Rejected-Finance Rejected |
Tender Value
₹5.5 L
EMD Value
₹11,000
Closing Date
23 Jun 2025, 3:00 pmClosed
EXECUTIVE OFFICER
112/2, ERODE ROAD, PERUNDURAI TOWN PANCHAYAT, PERUNDURAI - 638052, ERODE DISTRICT
Providing BT road patch work from Raja street Kottaimuniyappan Kovil to Kunnathur Road Govt Girls School in Perundurai Town Panchayat
2025_DTP_571390_1
109/2022
Open Tender
Civil Works
90 days
PERUNDURAI
III Class Contractor and Single Cover system
2 documents required · 2 mandatory
₹0
₹11,000
31 Jul 2025
20 Jun 2025
23 Jun 2025
20 Jun 2025
23 Jun 2025
20 Jun 2025
20 Jun 2025 - 23 Jun 2025
Amount
Earth work excavation for foundation in all soils and sub soils with an initial lead of 10m and lift of 2m and clearing and leveling the site etc. complete complying with standard specification.
Providing and laying WMM (Wet Mix Mecadam) of 150 mm compacted thickness in two layers of 125 mm thick or else as specified on the prepared sub base with graded stone aggregate and granular material of quality size and grading pasting in layor with motor grader and compaction with vibrating rollers of 80-100 KN static weight and fine dressing for required grade and cross slope as shown on the drawing equipments equipments safety measures testing and incidents necessary to complete the work as per MORTH 406
Providing and laying Prime Coat over WBM/ WMM Surface using 7Kg of Emulsion Bitumen (SSI) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5
Providing and laying Tack Coat over WBM/ WMM Surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying 50mm Consolidated thick Dense Bituminous Mecadam using 0.24 cum of 26.50 – 13.20 mm Graded metal and 0.25 cum of 13.20 – 2.36 mm Grade metal and 0.23 cum of 2.36 mm & below with 53.20 kgs of 60/70 Grade Bulk bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 505 of MORTH Rev-5
Providing and laying Bituminous Concrete to 30mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50-2.36mm and 0.26cum of 2.36 and below with 50.30 kgs of VG30( 60/70) bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30t on capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory/Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher/9mpaver finisher, Vibratory/Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
SS PACHAIAMMAN CONSTRUCTION (BID ID -1376619)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_682596.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid