Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹6.0 LAWARDED | ₹6.0 L | AWARDED |
Tender Value
₹6.4 L
EMD Value
₹19,000
Closing Date
16 Jan 2026, 9:30 pmClosed
Karnataka Forest Department
Construction of LLC/Check Dam for Chippala Halla in Moolehole Range During 2025-26 Location - Chippala Halla.
255939
KFD/2025-26/BR/WORK_INDENT29736
Open
Bridges/Culverts
KFD ACF Bandipur Sub Division Bandipur Tiger Reserve
₹500
₹19,000
8 Jan 2026
8 Jan 2026
17 Jan 2026
9 Jan 2026
Construction of LLC/Check Dam for Chippala Halla in Moolehole Range During 2025-26 Location - Chippala Halla
Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing Coursed rubble masonry (second sort) with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand)
Providing Size Stone masonry with hard stone in foundation & plinth with
Cement mortar 1:6 (1 cement : 6 coarse sand)
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. - Boulder Laid ...
Providing Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour and usage charges of machinery complete as per the direction of engineer incharge of work.
Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coars...
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
Providing Flush/ Ruled pointing: Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) after raking joints to depth nicely lin- ing, including cost of materials, labour, curing as...
Download all tender documents and submit your bid