Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹7.3 L+₹61,400 (9.25%)Accepted-Finance 224 KAILASH NAGAR SHOBHAPUR COLONY DISTRICT BETUL MADHYA PRADESH PIN 460449 | BETUL | MADHYA PRADESH | 460449 | L2 | Accepted-Finance L2 | |
| 3 | Rejected-Technical 0 CHINHAT LUCKNOW UTTAR PRADESH 227105 | 227105 | - | Rejected-Technical Disqualified |
Tender Value
₹12.8 L
EMD Value
₹12,810
Closing Date
17 Nov 2020, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SR REGIONAL MANAGER
SR REGIONAL MANAGER RIICO LTD JAIPUR NORTH VKIA JAIPUR
Preparation and distribution of water bills of different Industrial Areas under jurisdiction of Unit Jaipur North VKIA Jaipur Rs. 12.81 lacs
2020_RIICO_205202_1
22/2020-21(b)
Open Tender
Civil Works
Percentage
365 days
Different Industrial Area Under Jaipur North Unit
The tenderer should be registered in appropriate class according to this tender
5 documents required · 5 mandatory
₹1,180
RIICO LTD
₹12,810
27 Nov 2020
5 Nov 2020
19 Nov 2020
5 Nov 2020
17 Nov 2020
5 Nov 2020
70 days
Amount
Preparation and distribution of bi monthly water bills as per detailed scope of work as under The scope of work includes the work of taking monthly water meter reading every month preparation and distribution of bi monthly water consumption bills with Water Billing Module of RIICO ERP Software in prescribed format updation and preparation of monthly ledger posting of issued bills and recovery of deposited bills preparation of outstanding dues list Defective Stopped meter list and preparation of duplicate water bills on ERP WBM Module and ManuallyThe work of updation of all types of permission applications received for Reconnections Replacement of Water Meter and Change of Consumers Name Connection Size etc and other allied works related to WBMManually preparation of New Binders and Ledgers for each financial year preparation of water dues balance sheet and reconciliation of water dues recovery with financial ledger Only new binders ledgers for each financial year shall be provided by the CorporationThe scope also includes providing services with requisite manpower and all leviable Central State taxes transportation etc complete as per the directions of Engineer In Charge
Labour charges of releasing new water connections from distribution system of different sizes 1 2 and above including digging for pipeline, making hole in pipeline fixing clamp on pipeline and fixing of ferrule with G I Pipe for release of a new water connection and making good the surface after back filling of earth in trench including all T and P transportation lead and lift etc complete as per the directions of engineer in charge
Labour charges of making water connection D C or RC from distribution system of different sizes half inch and onwards including digging for pipeline making hole plugging hole in pipeline removal or fixing of ferrule with GI Pipe for RC or DC water connection and making good the surface after back filling of earth in trench including all T and P transportation lead and lift etc complete as per the directions of engineer in charge
Labour charges for Removing Refixing Replacement of water meter for repairing, including all T and P transportation lead and lift etc complete as per the directions of engineer in charge
Labour charges for crossing the water connection pipe under the road crust by manual mechanical means, including all T and P transportation lead and lift etc complete as per the directions of engineer in charge
Labour charges for dismantling of cement concrete RCC Platform for making new connection DC RC at site including all T and P transportation lead and lift etc complete as per the directions of engineer in charge
Labour charges of checking water connections at connection point from distribution system of different sizes half inch and above including digging at connection point for pipeline checking ferrule point, checking clamp on pipeline and aligning of ferrule with GI Pipe for proper flow of water to pipe line and making good the surface after back filling of earth in trench including all T and P transportation lead and lift etc complete as per the directions of engineer in charge
Labour charges of checking disconnected water connections at connection point and nearby from distribution system of different sizes half inch and above including digging at connection point for pipeline checking ferrule point checking clamp on pipeline and alignment of ferrule with GI Pipe if any found at site and making good the surface after back filling of earth in trench including all T and P transportation lead and lift etc complete as per the directions of engineer in charge
M/s Tirupati Construction Company
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .