| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 CrAdmitted-Finance | ₹2.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.9 Cr+₹29.0 L (11.3%)Admitted-Finance | ₹2.9 Cr+₹29.0 L (11.3%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Form-A uploaded in support of the value of B as indicated in the Bid Capacity Dated 23.07.2026 was found incorrect , so not qualify with the eligibility criteria |
| 4 | Rejected-Technical | - | - | Rejected-Technical Sufficient experience in similar works was not found, so not qualify with the eligibility criteria |
| 5 | Rejected-Technical | - | - | Rejected-Technical Sufficient experience in similar works was not found, so not qualify with the eligibility criteria |
| Sl No | Description | Qty | Unit | M/S Vinay Construction L2 | M/S RAGHVENDRA PRATAP SINGH L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantaling of R.C.C.Slab including cost of labour and T&P etc. as per direction and fully satisfaction by site incharge. | 7.88 | M³ | 750 ₹5,910 | 525 ₹4,137 Lowest |
| 2.00 | Dismantaling of old Brick work & R.B.Slab including cost of labour and T&P etc. as per direction and fully satisfaction by site incharge. | 57.81 | M³ | 400 ₹23,124 | 328 ₹18,961.68 Lowest |
| 3.00 | Earth work in Parwa soil for excavation foundation i/c all cost of labour and T&P etc. as per direction and fully satisfaction by site incharge. | 4,387.59 | M³ | 70 ₹3,07,131.3 | 69 ₹3,02,743.71 Lowest |
| 4.00 | C.C. 1 : 3: 6 with Stone Grit (20-40 mm) size i/c all cost of labour, materials and T&P etc. as per direction and fully satisfaction by site incharge. | 328.34 | M³ | 4,800 ₹15,76,032 | 4,500 ₹14,77,530 Lowest |
| 5.00 | C.C. 1 : 2 : 4 with Stone Grit(10-20 mm) size i/c all cost of labour, materials and T&P etc. as per direction and fully satisfaction by site incharge. | 376.49 | M³ | 5,200 ₹19,57,748 | 5,127 ₹19,30,264.23 Lowest |
| 6.00 | Brick work in 1:4 cement, mortar including all cost of material, labour and T&P etc. as per direction and fully satisfaction by site incharge. | 730.08 | M³ | 5,000 ₹36,50,400 | 4,536 ₹33,11,642.88 Lowest |
| 7.00 | Centering & Shuttering for R.C.C. work i/c all cost of labour, materials and T&P etc. as per direction and fully satisfaction by site incharge. | 409.44 | M2 | 300 ₹1,22,832 Lowest | 371 ₹1,51,902.24 |
| 8.00 | Reinforcement for R.C.C work in slab binding placing in position with G.I wire i/c all cost of labour, materials and T&P etc. as per direction and fully satisfaction by site incharge. | 4.29 | M.T. | 75,000 ₹3,21,375 | 6,210 ₹26,609.85 Lowest |
| 9.00 | R.C.C. 1 : 1.5 : 3 with Stone Grit (10-20 mm) size i/c all cost of labour, materials and T&P etc. as per direction and fully satisfaction by site incharge. | 47.98 | M³ | 6,500 ₹3,11,870 | 6,240 ₹2,99,395.2 Lowest |
| 10.00 | Deep struck Pointing 1:2 Cement, Mortar including cost of material, labour and T&P etc. as per direction and fully satisfaction by site incharge. | 2,088.65 | M2 | 80 ₹1,67,092 Lowest | 87 ₹1,81,712.55 |
Tender Value
₹3.7 Cr
EMD Value
₹7.4 L
Closing Date
4 Aug 2026, 3:00 pmClosed
Superintending Engineer, IVth Circle Irrigation Wo
Office of the Superintending Engineer, IVth Circle Irrigation Works, Jhansi
Lot 7, Restoration and Canal Land Demarcation Work of Harsinghpur Distributary from Km 0.000 to Km 18.649 in District Jalaun.
2026_UPIDC_1171841_7
04/SE-IV/2026-27
Open Tender
Civil Works
Item Rate
450 days
Jalaun
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,380
₹7.4 L
31 Aug 2026
25 Jul 2026
4 Aug 2026
25 Jul 2026
4 Aug 2026
25 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantaling of R.C.C.Slab including cost of labour and T&P etc. as per direction and fully satisfaction by site incharge. | 7.88 | M³ | 750.7 | ₹5,915.52 |
| 2 | Dismantaling of old Brick work & R.B.Slab including cost of labour and T&P etc. as per direction and fully satisfaction by site incharge. | 57.81 | M³ | 469.2 | ₹27,124.45 |
| 3 | Earth work in Parwa soil for excavation foundation i/c all cost of labour and T&P etc. as per direction and fully satisfaction by site incharge. | 4,387.59 | M³ | 102 | ₹4,47,534.18 |
| 4 | C.C. 1 : 3: 6 with Stone Grit (20-40 mm) size i/c all cost of labour, materials and T&P etc. as per direction and fully satisfaction by site incharge. | 328.34 | M³ | 6,001.8 | ₹19,70,631.01 |
| 5 | C.C. 1 : 2 : 4 with Stone Grit(10-20 mm) size i/c all cost of labour, materials and T&P etc. as per direction and fully satisfaction by site incharge. | 376.49 | M³ | 6,837.24 | ₹25,74,152.49 |
| 6 | Brick work in 1:4 cement, mortar including all cost of material, labour and T&P etc. as per direction and fully satisfaction by site incharge. | 730.08 | M³ | 6,049.3 | ₹44,16,472.94 |
| 7 | Centering & Shuttering for R.C.C. work i/c all cost of labour, materials and T&P etc. as per direction and fully satisfaction by site incharge. | 409.44 | M2 | 572.5 | ₹2,34,404.4 |
| 8 | Reinforcement for R.C.C work in slab binding placing in position with G.I wire i/c all cost of labour, materials and T&P etc. as per direction and fully satisfaction by site incharge. | - | M.T. | 86,263.8 | - |
| 9 | R.C.C. 1 : 1.5 : 3 with Stone Grit (10-20 mm) size i/c all cost of labour, materials and T&P etc. as per direction and fully satisfaction by site incharge. | 47.98 | M³ | 8,110.19 | ₹3,89,126.92 |
| 10 | Deep struck Pointing 1:2 Cement, Mortar including cost of material, labour and T&P etc. as per direction and fully satisfaction by site incharge. | 2,088.65 | M2 | 122.11 | ₹2,55,045.05 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.70 MB
04SEIVNIT2026-27.pdf
Tender Documents • 2.89 MB
BOQ_2200659.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .