Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹16.0 L
Closing Date
25 Nov 2026, 4:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
15 conditions · 2 needing a document upload
Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Technical Eligibility Criteria: (a)The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b) (1)In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii)One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b)(2)In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows:
Defination of Similar Work :- Supply and /or installation and commissioning of fire detection and alarm system by OEM or authorized representative of OEM to any government organization and/ or PSUs. OR Any work involving indoor signaling work where "Fire detection and Alarm system" is a part of the work.
The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway. In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract, with prior approval of Chief Engineer in writing. Note for Item 10.1: Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.[Ref:- GCC April 2022 Para 10.1 of Tender Form (Second Sheet) of Annexure I of ITT. Further 'Explanation for Para 10 of the Tender Form (Second Sheet) including Para 10.1 to 10.5 - Eligibility Criteria' shall be as per GCC April 2022].
49 conditions · 1 needing a document upload
The bidder has to submit the Annexures attached with tender:- I/A,I/B,II, III,IV/A,IV/B , tender first Sheet duly fill-up and signed (As applicable).
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Mode of Payment from Railway through a "Letter of Credit(LC)" arrangement. If yes, attach beneficiary Bank details. Details available in Special condition.
The Balance Sheet and all other Financial documents attested/certified by the Chartered Accountant (CA) to substantiate fulfilment of Financial Eligibility Criteria should be with UDIN failing which the offer shall be considered as incomplete and will be summarily rejected without any further reference.
(Special Condition of Contract for mandatory updating of Labour data on Railway's shramikkalyan portal by Contractor (Ref:- Railway Board letter no.-2018/CE-I/CT/4, Dated 17.10.2018.)
A. Contractor is to abide by the provisions of Payment of Wages act &Minimum Wages act in terms ofclause 54 and 55 of Indian Railway GeneralCondition of Contract. In order to ensure the same, anapplication has beendeveloped and hosted on websitewww.shramikkalyan.indianraihwars.gov.in'.Contractor shall register his firm/company etc. and uploadrequisite details oflabour and their payment in this portal. These details shall be available inpublicdomain. The Registration' updation of Portal shall be done as under:(a) Contractor shall apply for onetime registration of his company/firm etc. inthe Shramikkalyan portal with requisite details subsequent toissue of Letter ofacceptance. Engineer shall approve the contractor's registration within 7 daysof receiptof such request. (b)Contractor once approved by any Engineer, cancreate password with login ID (PANNo.) for subsequent use of portal for allLOAs issued in his favour. (c) The contractor once registered onthe portal,shall provide details of his Letter of Acceptances (LOA)/Contract Agreementson shranikkalyanportal within 15 days of issue of any LOA For approval ofconcerned engineer. Engineer shall update (ifrequired) and approve thedetails of LOA filled by contractor within 7 days of receipt of such request.(d)After approval of LOA by Engineer, contractor shall fill the salient details ofcontract laboures engagedin the contract and ensure updating of each wagepayment to them on shramikkalyan portal on monthlybasis. (e) It shall bemandatory upon the contractor to ensure correct and promt uploading of allsalientdetails of engaged contractual labour & payment made thereof aftereach wage period. B. Whileprocessing payment of any 'ON account bill' or'Final bill' or relese of 'Advance ' or 'PerformanceGuarantee/Security deposit' contractor shall submit a certificate to the Engineer orEngineer'srepresentative that " I have uploaded the correct details of contract laboursengaged inconnection with this contract and payment made to them during the wage period in Railway'sShramikkalan portal at www.shramikkalyan.indianrailways.gov.in till _____, month,______ Year.".
Special Conditions for inclusion of 'Letter of Credit' as Mode of Payment in works Tender or Service tender. (Authority: - Railway Bd. letter no.2018/CE-I/CT/9, dated: 04.06.2018).
For all the tenders having advertised cost of Rs.10 lakh or above, the contractor shall have the option to take payment from Railways through a letter of credit (LC) arrangement.
This option of taking payment through LC arrangement has to be exercised in IREPS (Indian Railway Electronic Procurement System - the e-application on which tenders are called by Railways) by the tenderer at the time of bidding itself, and the tenderer shall affirm having read over and agreed to the terms and conditions of the LC option.
The option so exercised, shall be an integral part of the bidder's offer.
The above option of taking payment through LC arrangement, once exercised by tenderer at the time of bidding, shall be final and no change shall be permitted, thereafter, during execution of contract.
In case tenderer opts for payment through LC, following shall be the procedure to deal release of payment through LC:
The LC shall be a sight LC.
The contractor shall select his Advising/Negotiating bank for LC. The incidental cost towards issue of LC and its operation thereof shall be borne by the contractor.
SBI, New Delhi, Main Branch will be the nodal branch for issue of LCs based on online requests received from Railway Accounts Units for tenders opened in financial year 2018-19. SBI branches where the respective Railway Accounts Office has its Account (local SBI branch) will be the issuance/reimbursing branch for LC issued under this arrangement. The Bank shall remain same for this tender till completion of contract. The incidental cost @ 0.15% per annum of LC value, towards issue of LC and operation thereof shall be borne by the contractor and shall be recovered from his bills.
The LC shall be opened initially for duration of 180 to 365 days in consultation with contractor. The LC shall be extended time to time as per the progress of the contract, on the request of the contractor. The value of LC to be opened initially as well as extended thereafter shall be finalised by the engineer in consultation with the contractor on the basis of expected progress of work.
The LC terms and conditions shall inter-alia indemnify and save harmless the Railway from and against all losses, claims and demands of every nature and description brought or recovered against the Railways by reason of any act or omission of the contractor, his agents or employees, in relation to the Letter of Credit (LC). All sums payable/borne by Railways on this account shall be considered as reasonable compensation and paid by contractor.
The LC terms and conditions shall inter-alia provide that Railways will issue a Document of Authorisation (format enclosed as Annexure 2) after passing the bill for completed work, to enable contractor to claim the authorized amount from their bank.
The acceptable, agreed upon document for payments to be released under the LC shall be the Document of Authorisation.
The Document of Authorisation shall be issued by Railway Accounts Office against each bill passed by Railways.
On issuance of Document of Authorisation, a copy of Document of Authorisation shall be posted on IREPS for download by the contractor. A digitally signed copy of Document of Authorisation shall also be sent by Railway Accounts Office to Railway's bank (Local SBI Branch).
The contractor shall take print out of the Document of Authorisation available on IREPS and present his claim to his bank (advising Bank) for necessary payments as per LC terms and conditions. The claim shall comprise of copy of Document of Authorisation, Bill of Exchange and Bill.
3.5.11 The payment against LC shall be subject to verification from Railway's Bank (Local SBI Branch).
The contractor's bank (advising bank) shall submit the documents to the Railway's Bank (Local SBI Branch).
The Railway's bank (issuing bank) shall, after verifying the claim so received w.r.t. the digitally 3.5.13 signed Document of Authorisation received from Railway Accounts Office, release the payment to contractor's bank (advising bank) for crediting the same to contractor's account.
Any number of bills can be dealt within one L.C, provided the sum total of payments to contractor is within the amount for which LC has been opened.
The LC shall be closed after the release of final payment including PVC amount, if any, to the contractor.
The release of performance guarantee or security deposit shall be dealt directly by railway with 3.5.16 the contractor i.e., not through LC.
Payment Terms:
For Purely Supply Items:-90% of the value of each Supply Item of Schedule of Works will be Paid after supply of Items and on production of the following documents: - (i) Receipt of Material at Consignee's depot. (ii) Original inspection certificate / waiver of inspection issued by Inspecting Officer.(iii)Manufacturers' inspection certificate that the materials are in accordance with the specifications of the contract. Invoice in duplicate. A certificate that the materials supplied are as per the contract and the amount claimed in the invoice is correct as per terms of the contract. (vi) (a) Store receipt certificate issued by Railway official/Representative as per format as Annexure - R of existing Tender document(Copy enclosed). 5% percent payment for purely Supply Items against tender schedule of works will be made after successful commissioning of the Station. (b) The balance 5% percent payment for purely Supply Items against tender schedule of works will be made after Completion of Work, with Final Bill of the Contract.
For Purely Execution/Installation items: - 90% of the value of each Purely Installation Item of Schedule of Works will be paid after Installation & Testing of the Item. (a)5% percent payment for Purely Execution /Installation items against tender schedule of works will be made after successful commissioning of the station. (b)The balance 5% percent payment for purely Execution /Installation Items against tender schedule of works will be made after successful commissioning of the Station. Note: In case commissioning of station is delayed by more than 06 months on Railway Account and the physical work has been completed by the contractor in totality then 5% payment on account of commissioning of the station shall be released to the contractor.
For Supply & Installation items: - 90% percent payment for Supply &installation Items against tender schedule of works will be made after successful installation & testing and on production of the documents mentioned above in Para 1. on account bill shall be paid only on production of certificate by the site Engineer that relevant portion of installation has been completed. (a) 5% percent payment for Supply &Installation Items against tender schedule of works will be made after successful commissioning of the Station. (b)The balance 5%percent payment for supply & installation items against tender schedule of works will be made after completion of work with final bill of the contract.
All payments shall be made on the certificate of the Engineer within a reasonable time of the submission of the necessary bills by the contractor. Payment shall be made through cheques/NEFT/RTGS/LC payment in the name of the Contractor.
Scope of Work: (i) Provision of Aspiration type automatic fire detection and alarm system (AFDAS) for the section of DSTE/SPJ, ASTE/SHC & ASTE/DBG in Samastipur Division.(ii) Proposed Site/Location for Execution of Work: List attached. The work shall be executed in different sections/stations of the Samastipur (SPJ) Division, under the jurisdiction of DSTE/SPJ, ASTE/SHC & ASTE/DBG and as per Railway requirements. Note: Railway reserves the right to change, alter, add, or delete any site/location based on operational requirements, feasibility, availability of site, site conditions, or any other reason deemed necessary. Releasing of Existing Fire Alarm System: The existing Fire Alarm Systems shall be dismantled, released, and returned to the Railway store by the contractor without any extra payment. However, depending upon site requirements, certain existing Fire Alarm Systems may be retained. At such locations, as directed by the Railway Site Engineer, the existing Fire Alarm System shall not be dismantled and shall continue to remain in service in addition to the newly provided Fire Alarm System. No additional payment shall be admissible on this account.(iii) The latest specifications and amendments thereto shall apply to all drawings and specifications.(iv) Technical Specifications, Inspection, Terms and Conditions: The detailed technical specifications, inspection requirements, term, and conditions for execution and supply shall be as per the tender document and applicable technical specifications (whereas applicable). Inspection for each item are specified in the schedule. However, for any safety item requiring Third-Party Inspection (TPI) by RDSO/RITES, shall be supplied with such TPI inspection, irrespective of the inspection agency mentioned in the schedule.(Inspection-Consignee, subject to total item value <05 Lakh, Non safety critical items). TPI (RITES) inspection charge to be borne by contractor. Note: All the materials (schedule items) shall be supplied as per railway requirement. There should be no any compatibility/suitability issues for supplied materials to the existing/New equipment. OEM support, liaisoning, etc., shall be arranged by the contractor for the successful commissioning of the AFDAS, complete in all respects.(v) The work shall be executed and materials supplied as per the instructions of the railway and site engineer.
(vi) The quantities/items indicated in the schedule may vary according to Railway or site requirements. Railway reserves the right to change, alter, add, or delete any item or quantity at any stage of the contract. Railway does not guarantee execution of work under every item or the quantities specified in the schedule. It may further be noted that the scheduled items shall be supplied as per requirements, for which proper assessment shall be carried out by the contractor before supplying the items. Any items or quantities not executed, if any, shall be governed by the relevant variation clause of the GCC.(vii)The rates quoted by the tenderer shall include the cost of materials and all incidental charges, including transportation, loading, unloading, handling, and any other associated expenses. The quoted rates shall also include all applicable taxes (including GST), duties, royalties, levies, octroi, and other statutory charges (as applicable).(viii) Recovery of taxes from bills shall be made as per the extant rules in force. (ix) The contractor shall be responsible for the carriage, safe transportation, loading, unloading, storage, protection, and safe handling of all materials required for the execution of the work.(x) All relevant standard guidelines and instructions issued by Railway Board, HQ/East Central Railway regarding contract management, technical aspects/requirements, execution of work, and prevailing Railway practices, E. C. railway practice inforce etc. shall be apply in this contract (as applicable).
Transportation of Materials:-
All materials specifically supplied by contractor to be supplied to the SSE/Signal or Tele/Store/SPJ or as specified by competent authority.
Contractor will carry all the materials (contractor supplied) from SSE/Signal or Tele/Store/SPJ or as specified by Competent authority to the site of work at his own cost and arrangement.
Execution of AMC:- Not applicable.
Provision of Aspiration type automatic fire detection and alarm system (AFDAS) for the section of DSTE/SPJ, ASTE/SHC & ASTE/DBG in Samastipur Division.
SPJ-SnT-S-15-2026~ECR
SPJ-SnT-S-15-2026
Open
Works - General
6 Months
Samastipur, Bihar
₹0
₹16.0 L
3 Nov 2026
3 Nov 2026
11 Nov 2026
29 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 8,01,71,115 | ||
| — | 65.00 | — | — | ||
| Supply, Installation, Testing & Commissioning of Networkable Single loop addressable Fire alarm Control panel expandable upto 2 loops & interface with GSM/LTE module working as per RDSO/SPN/217/2025 ver-3.1or latest. The control panel shall be networkable t o Zonal /Divisional Headquarters preferably o v e r T C P lP/OFC media converter and shall have clock synchronization facility. This schedule includes supply of TCP IP converter/Networking card/OFC media converter. The control panel shall have provision of Graphical software to enable remote monitoring of entire fire detection and alarm system of a station from Head Quarters. The control panel shall be designed to work on power supply of 110V/230V AC as well as on DC battery backup of adequate capacity to work upto 24 hrs. Backup. The Power supplies like batteries and chargers shall be supplied by the contractor. The Control Panel shall have means for the user to visualize and interact with the complete Automatic Fire Detection and Alarm System layout through a user- friendly software executable on a standard Windows based Personal Computer. It shall be possible to download data and extend alarms from Control Panel through suitable ports like RS485/RS232/USB/TCP/IP into a PC/Laptop available with SSE at the installation and remote location (Divisional Control room) operating on Windows platform. The software for downloading a n d analysing fault data shall be provided & shall b e compatible with t h e latest windows operating system. Detection, actuation, and control system shall have provision for automatic as well as manual operation. The control panel should have provision to connect a GSM/LTE module duly providing compatible S I M w ith S M S facility o n minimum o f 5 numbers (users).Note: Spare cost is also included& to be supplied as per RDSO para Nos. 4.15 or latest.(Insp.-RDSO). | — | — | — | 89,73,770 | |
| — | 65.00 | — | — | ||
| Supply, Installation, testing and commissioning of laser or high power LED based Aspiration detection unit for AC room with programmable 4 stage alarm generation and with 4 addressable modules. It should have auto cleaning facility in optical chamber, electronic discrimination of particle size or other listed methods or combination thereof. The aspiration system shall also include external power supply unit with battery backup as per OEM. The aspiration type smoke detector should be UL/LPCB/Vds/FM listed/approved and shall comply to specification Nos. RDSO/SPN/217/2025ver- 3.1 or latest. Note: Spare cost is also included & to be supplied as per RDSO para Nos. 4.15 or latest. (Insp.-RDSO). | — | — | — | 2,13,50,485 | |
| — | 1150.00 | — | — | ||
| Supply, installation testing & commissioning of Heat and smoke multi sensor with inbuilt fault isolator (open/short circuit in loop) as per specification Nos. RDSO/SPN/217/2025 ver- 3.1 or latest and required t o b e provided a t suitable locations inside the diesel generator room, battery room, ASM room, power equipment room, B96 non air conditioned RR, CCTV control & equipment rooms, way side OFC room and other S&T service rooms as directed by the Railway site Engineer. The location of fixing is to be meticulously decided so that full advantage of the system is achieved. Note: Spare cost is also included & to be supplied as per RDSO para Nos. 4.15 or latest. (Insp.-RDSO). | — | — | — | 46,27,600 | |
| — | 65.00 | — | — | ||
| Supply, Installation, Testing & commissioning of Audio Visual alarm (Hooter and strobe) controlled through addressable control model. I t shall b e preferably flashing type Red/White colour. I t shall b e preferably with Piezoelectric type sounder. T h e sound level shall b e preferably adjustable type u p t o 9 0 d B a t a distance of 1Mtr as per specification No. RDSO/SPN/217/2025 ver- 3.1 or latest. Note: Spares cost are also included & to be supplied as per RDSO para Nos. 4.15 or latest. (Insp.-RDSO). | — | — | — | 5,45,870 | |
| — | 65.00 | — | — | ||
| Supply, Installation and Testing, commissioning o f Addressable and resettable Manual call point with inbuilt fault isolator (open/short circuit in loop) status LED for alarming & standby mode as per specification Nos. RDSO/SPN/217/2025 ver- 3.1 or latest.Note: Spare cost is also included & to be supplied as per RDSO para Nos. 4.15 or latest. (Insp.-RDSO). | — | — | — | 3,34,425 | |
| — | 65.00 | — | — | ||
| Supply, Installation, Testing and Commissioning o f UL/FM/Vds/LPCB approved/listed resettable UV/IR Type flame detector for diesel oil storage room with required module to communicate on main fire alarm panel.Note: Spare cost is also included & to be supplied as per RDSO para Nos. 4.15 or latest. (Insp.-RDSO). | — | — | — | 39,87,880 | |
| — | 65.00 | — | — | ||
| Supply, Installation, Testing and Commissioning of resettable Probe type bimetallic Heat and all other accessories for diesel generator encloser as per RDSO Specification Nos. RDSO/SPN/217/2025 ver- 3.1 or latest. Note: Spare cost is also included & to be supplied as per RDSO para Nos. 4.15 or latest. (Insp.-RDSO). | — | — | — | 4,33,680 | |
| — | 65.00 | — | — | ||
| Supply, installation, testing & communication of Linear Heat Sensing (LHS)/Linear Heat Detection (LHD) Interface module with all accessories for integration with main line fire alarm control panel as per RDSO specification Nos. RDSO/SPN/217/2025ver- 3 . 1 o r latest. I t should b e UL/FM/Vds/LPCB approved/listed.Note: Spare cost is also included & to be supplied as per RDSO para Nos. 4.15 or latest. (Insp.-RDSO). | — | — | — | 60,37,330 | |
| — | 4200.00 | — | — | ||
| Supply, Installation Testing and commissioning o f Analogue type Linear Heat Sensing cable/Linear Heat Detector hollow metallic pneumatic tube type with required module t o b e integrated o n main Fire Alarm Panel a s per specification Nos. RDSO/SPN/217/2025ver- 3.1 or latest. It shall be laid in all cables tray located in power equipment room, relay room & telecom room and should be UL/FM/Vds/LPCB approved/listed. Note: Spare cost is also included & to be supplied as per RDSO para Nos. 4.15 or latest. (Insp.-RDSO). | — | — | — | 22,38,600 | |
| — | 65.00 | — | — | ||
| Supply, Installation, Testing, Commissioning o f Auto Telephone Dialler (GSM) Module to send the prerecorded message, fire and fault massage, to multiple mobile numbers, programmed earlier, complying to the RDSO/SPN/217/2025ver- 3.1or latest.Note: Spare cost is also included & to be supplied as per RDSO para Nos. 4.15 or latest.(Insp.-RDSO). | — | — | — | 6,85,620 | |
| — | 65.00 | — | — | ||
| Supply of Power supply System 24 V/2 Amp or other rating as perOEM with built in Charger with battery backup as per specification Nos. RDSO/SPN/217/2025ver- 3.1or latest.Note: Spare cost is also included & to be supplied as per RDSO para Nos. 4.15 or latest. (Insp.-RDSO). | — | — | — | 22,41,200 | |
| — | 6250.00 | — | — | ||
| Supply, Installation Testing and commissioning of FRLS/Fire Survival Circuit Integrity Cables of size 2C X1.5 Sq. mm with all accessories certified by UL/FM/Vdc/LPCB/BRE global or any recognised Lab by GOI for connection of Fire Alarm devices specification Nos. RDSO/SPN/217/2025ver- 3.1or latest.Note: Spare cost is also included & to be supplied as per RDSO para Nos. 4.15 or latest.(Insp.-RDSO). | — | — | — | 10,56,250 | |
| — | 3200.00 | — | — | ||
| Supply, Installation, Testing & Commissioning of UL/LPCB/Vdc listed/approved Pipe made of CPVC with suitable diameter & pipe accessories (couplings, unions, elbows, tees, end caps, capillary tubes, sampling ports, mounting brackets etc.) as per requirement for the Aspiration detection shall comply to RDSO/SPN/217/2025ver 3.1or latest.Note: Spare cost is also included & to be supplied as per RDSO para Nos. 4.15 or latest.(Insp.-RDSO). | — | — | — | 32,57,600 | |
| — | 65.00 | — | — | ||
| Supply, installation, configuring, testing and commissioning of remote monitoring software (GUI) along with license f o r Min. 2 0 addressing control panels a s per RDSO/SPN/217/2025ver- 3.1or latest. This includes necessary gateway card and network interface card for the system fully functional as desired by railways .Note: Spare cost is also included & to be supplied as per RDSO para Nos. 4.15 or latest.(Insp.-RDSO). | — | — | — | 2,44,00,805 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TenderNotice.pdf
ATTACHMENT
Tender1stsheet.pdf
ATTACHMENT
GCCwithACSupto12th.pdf
ATTACHMENT
GCCACS11.pdf
ATTACHMENT
Annexures.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .