Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹82.1 LAccepted-AOC 28 29 GALI NO 05 MAHABIR PARK 124507 | BAHADURGARH | JHAJJAR | HARYANA | 124507 | ₹82.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹83.1 LRejected-AOC | ₹83.1 L | L2 | Rejected-AOC L2 |
| 3 | L3₹83.4 LRejected-AOC HOUSE NO 3000 SECTOR 15 HOUSING BOARD COLONY SONIPAT 131001 | SONIPAT | SONIPAT | HARYANA | 131001 | ₹83.4 L | L3 | Rejected-AOC L3 |
| 4 | L4₹87.2 LRejected-AOC 1804 SECTOR 2 ROHTAK 124001 | ROHTAK | HARYANA | 124001 | ₹87.2 L | L4 | Rejected-AOC L4 |
| 5 | L5₹88.6 LRejected-AOC HOUSE NO 1531 I BLOCK A SECTOR 15 NEAR GREENWOOD CITY GURUGRAM 122001 | GURUGRAM | GURUGRAM | HARYANA | 122001 | ₹88.6 L | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | Jaiveer Singh Contractor L1 | Kulwant Singh L4 | Narender Singh Contractor L1 | Ranjan Kumar Contractor L5 | M/s Quality Constructions L2 | Suresh Kumar L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Repair of damaged household water connection existing line | 520 | Each | 880 ₹4.6 L | 1,300 ₹6.8 L | 700 ₹3.6 L | 500 ₹2.6 L | 990 ₹5.1 L | 1 ₹520 |
| 2.00 | Repair of damaged household Sewer connection existing line | 520 | Each | 880 ₹4.6 L | 1,300 ₹6.8 L | 900 ₹4.7 L | 500 ₹2.6 L | 990 ₹5.1 L | 1 ₹520 |
| 3.00 | Making water connection with existing main line complete in all respect | 5 | Each | 25,000 ₹1.3 L | 1,200 ₹6,000 | 5,000 ₹25,000 | 5,000 ₹25,000 | 990 ₹4,950 | 10,000 ₹50,000 |
| 4.00 | making household new connection of
water supply | 660 | Each | 2,200 ₹14.5 L | 1,300 ₹8.6 L | 1,000 ₹6.6 L | 500 ₹3.3 L | 990 ₹6.5 L | 1 ₹660 |
| 5.00 | Providing and laying of 100mm dia K-7 pipe line (rate taken as per The Director General supplies and Disposal Haryana | 4,400 | Metre | 1,020 ₹44.9 L | 1,700 ₹74.8 L | 1,325 ₹58.3 L | 1,300 ₹57.2 L | 1,290 ₹56.8 L | 1,500 ₹66 L |
| 6.00 | Providing and laying of 150mm dia K-9 pipe line (rate taken as per The Director General supplies and Disposal Haryana | 350 | Metre | 1,550 ₹5.4 L | 2,600 ₹9.1 L | 1,600 ₹5.6 L | 2,200 ₹7.7 L | 1,800 ₹6.3 L | 1,874 ₹6.6 L |
Tender Value
₹92.3 L
EMD Value
₹1.8 L
Closing Date
30 Jan 2026, 12:00 pmClosed
PARVEEN KUMAR
Municipal Corporation Gurugram
Providing and laying of D.I water supply pipe line for Sector 22B, Ward no. 3, MCG. Re-call
2026_HRY_498106_1
20264F707E4C C598 484D B1E7 4A23A518993C285ULB
Open Tender
Civil Works
180 days
Gurugram
2 documents required · 2 mandatory
₹5,000
₹1.8 L
Yes
1 Apr 2026
20 Jan 2026
30 Jan 2026
20 Jan 2026
30 Jan 2026
20 Jan 2026
Repair of damaged household water connection existing line
Repair of damaged household Sewer connection existing line
Making water connection with existing main line complete in all respect
making household new connection of water supply
Providing and laying of 100mm dia K-7 pipe line (rate taken as per The Director General supplies and Disposal Haryana
Providing and laying of 150mm dia K-9 pipe line (rate taken as per The Director General supplies and Disposal Haryana
Percentage BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Providing and laying of D.I water supply pipe line for Sector 22B, Ward no. 3, MCG
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
BOQ_576664.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid