| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-AOC | ₹3.2 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹3.2 LRejected-Finance | ₹3.2 L | L2 | Rejected-Finance High Amount Quoted |
| Sl No | Description | Qty | Unit | N KANDHASAMY L2 | B SUNDAR L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per SS 20 B TNDSS NO: 23 & 24 VI (S2) VI,VII 9,10 with standard specifications. | 30 | m3 | 200 ₹6,000 | 197 ₹5,910 |
| 2.00 | Plain Cement Concrete 1:4:8 Mix (one part cement, four part sand and Eight part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc., complete as per TNDSS NO : 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. | 16 | m3 | 5,425 ₹86,800 | 5,399 ₹86,384 |
| 3.00 | Plain Cement Concrete 1:1.5:3 (One part of Cement, one and half part of Crushed Sand (M- Sand), three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification CC Road | 11 | m3 | 7,250 ₹79,750 | 7,230 ₹79,530 |
| 4.00 | Supplying and erecting centering to sides and soffits including supports and strutting with necessary cross bracing for plain surface such as RCC slabs rectangular beams all beams lintels etc., centering for soffits upto 3 meter height using mild steel sheet of size 90 cm x 60 cm x 10 mm gauge with MS angles of size 25mm x 25mm x 3mm laid over silver oak (CW) joists of size 10cm x 6cm spaced upto 90cm c/c and casurina props or 10 cm to 13 cm dia spaced at 0.750 cm c/c complying with standard specifications as per TNDSS NO : 30 & 86. | 84 | m2 | 495 ₹41,580 | 489 ₹41,076 |
| 5.00 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 12 | m3 | 6,800 ₹81,600 | 6,772 ₹81,264 |
| 6.00 | Finishing the top of flooring with granothatic flooring with cement concrete 1:2:4 (one cement, two sand and four aggrigate) using 10 to 12mm stone chips – 25mm tk etc., Complete. | 14 | m2 | 165 ₹2,310 | 162 ₹2,268 |
| 7.00 | Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils as directed by Departmental officers Pipe Line | 20.25 | m3 | 335 ₹6,783.75 | 329 ₹6,662.25 |
| 8.00 | Supply and delivery of HDPE Pipes PE 100 PN 6 of standard length conforming to IS 4984/1995 and as amended from time to time The cost of pipes should include loading, freight, transit insurance, incidental charges, packing, taxes and transp 9033 HDPE Pipe | 50 | Rm | 255 ₹12,750 | 250 ₹12,500 |
| 9.00 | Lowering HDPE pipes and specials to trench and laying to proper grade and alignment and as directed by the TWAD Officers (For depth upto 2m ) 90mm to 110mm dia (OD) HDPE pipe 90333 HDPE Pipe | 50 | RM | 23 ₹1,150 | 20 ₹1,000 |
| 10.00 | Refilling with excavated soil ( other than sand) complying with the standard specification in layers of 15 cm watered well rammed and consolidated after the pipes and specials are laid, jointed and tested etc., and removing and 90mm PVC Pipe | 20.25 | m3 | 48 ₹972 | 45.5 ₹921.38 |
Tender Value
₹4 L
EMD Value
₹4,000
Closing Date
5 Feb 2026, 3:00 pmClosed
Executive officer
Chettipalayam Town Panchayat,Coimbatore-641201
Additional work to Drain at MRK Nagar and railway Bridge CC Pavement in Chettipalayam Town Panchayat
2026_DTP_651012_1
Roc.No.06/2025, Date.20.01.2026 General Fund 2025-2026
Open Tender
Civil Works
180 days
Chettipalayam Town Panchayat
as for norms
2 documents required · 2 mandatory
₹0
₹4,000
3 Mar 2026
4 Feb 2026
5 Feb 2026
4 Feb 2026
5 Feb 2026
4 Feb 2026
4 Feb 2026 - 5 Feb 2026
Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per SS 20 B TNDSS NO: 23 & 24 VI (S2) VI,VII 9,10 with standard specifications.
Plain Cement Concrete 1:4:8 Mix (one part cement, four part sand and Eight part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc., complete as per TNDSS NO : 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge.
Plain Cement Concrete 1:1.5:3 (One part of Cement, one and half part of Crushed Sand (M- Sand), three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification CC Road
Supplying and erecting centering to sides and soffits including supports and strutting with necessary cross bracing for plain surface such as RCC slabs rectangular beams all beams lintels etc., centering for soffits upto 3 meter height using mild steel sheet of size 90 cm x 60 cm x 10 mm gauge with MS angles of size 25mm x 25mm x 3mm laid over silver oak (CW) joists of size 10cm x 6cm spaced upto 90cm c/c and casurina props or 10 cm to 13 cm dia spaced at 0.750 cm c/c complying with standard specifications as per TNDSS NO : 30 & 86.
Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Finishing the top of flooring with granothatic flooring with cement concrete 1:2:4 (one cement, two sand and four aggrigate) using 10 to 12mm stone chips – 25mm tk etc., Complete.
Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils as directed by Departmental officers Pipe Line
Supply and delivery of HDPE Pipes PE 100 PN 6 of standard length conforming to IS 4984/1995 and as amended from time to time The cost of pipes should include loading, freight, transit insurance, incidental charges, packing, taxes and transp 9033 HDPE Pipe
Lowering HDPE pipes and specials to trench and laying to proper grade and alignment and as directed by the TWAD Officers (For depth upto 2m ) 90mm to 110mm dia (OD) HDPE pipe 90333 HDPE Pipe
Refilling with excavated soil ( other than sand) complying with the standard specification in layers of 15 cm watered well rammed and consolidated after the pipes and specials are laid, jointed and tested etc., and removing and 90mm PVC Pipe
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_780616.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.07 MB
NIT.pdf
Tender Documents • 0.05 MB
BOQ_780616.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid