Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.4 LAccepted-AOC | ₹11.4 L | L1 | Accepted-AOC L1 BIDDER |
| 2 | L2₹11.5 L+₹17,628.37 (1.55%)Rejected-Finance | ₹11.5 L+₹17,628.37 (1.55%) | L2 | Rejected-Finance 2 ND LOWEST BID |
| 3 | L3₹11.6 L+₹20,471.66 (1.80%)Rejected-Finance | ₹11.6 L+₹20,471.66 (1.80%) | L3 | Rejected-Finance 3 RD LOWEST BID |
Tender Value
₹11.4 L
EMD Value
₹22,746
Closing Date
2 Mar 2026, 11:00 amClosed
EE_COOCHBEHAR_IRRIGATION_DIVISION
EE_COOCHBEHAR_IRRIGATION_DIVISON_DEBIBARI_COOCH_BEHAR
MR to Bochagari BP work along the right bank of river Dharala at Bochagari village area within GP- Jorepatki, Block- Mathabhanga-I, Dist- Coochbehar.
2026_IWD_998921_5
WBIW/EE/COB/e-NIT-18/2025-26
Open Tender
CIVIL WORKS
Percentage
90 days
Mathabhanga I
Please refer Tender documents.
8 documents required · 8 mandatory
₹22,746
Yes
30 Mar 2026
7 Feb 2026
2 Mar 2026
7 Feb 2026
2 Mar 2026
7 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in the canals/drainage channels/borrowpits/Riverbed/slope of bank as noted below as per designed section & throwing the spoils in layers of 25cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods,rough dressing etc.complete as per direction of the Engineer-in-charge. (a)Ordinary soil/ local soil/ soil mixed with moorum or kankar/ silt, dry or moist/ slushy silt / sticky soil. | 283 | Cum | 129.91 | ₹36,764.53 |
| 2 | Quarrying, Carrying, Supplying stone boulders/shingles from the Engineer-in-charge selected quarrying site to the site of work including cost of material, loading, unloading and carriage including all incidental charges like Royalty and Labour charges for laying boulder in apron as per direction of the Engineer-in-charge. (Quarry be belongs to Forest Deptt Govt of W.B)
N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arrive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (a) For Forest area Royalty including entry fee and TP fee : Rs. 178.33 per Cum (b) For Non-Forest area Royalty : Rs. 106.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works .
Boulder above 30 kgs each 70%, above 20 kgs each 20% and above 10 kgs each 10% | 0.8 | Cum | 2,051.84 | ₹1,641.47 |
| 3 | Quarrying, Carrying, Supplying stone boulders/shingles from the Engineer-in-charge selected quarrying site to the site of work including cost of material, loading, unloading and carriage including all incidental charges like Royalty and labour charges for boulder pitching on top and slope by placing required boulders (Boulder above 20kg each within lead of 100 metres and all lifts) including filling the interstices with fragments as required, preparing sub- grade by cutting or filling the earth on slope up to 7.5cm. depth, watering and ramming where necessary complete but excluding the cost of shingle of filling materials as per direction of the Engineer-in-charge. (Quarry bed belongs to Forest Deptt Govt of W.B)
N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arrive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (a) For Forest area Royalty including entry fee and TP fee : Rs. 178.33 per Cum (b) For Non-Forest area Royalty : Rs. 106.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works .
c) Boulder above 20kg each | 0.2 | Cum | 2,289.84 | ₹455.68 |
| 4 | Quarrying, Carrying, Supplying stone boulders/shingles from the Engineer-in-charge selected quarrying site to the site of work including cost of material, loading, unloading, stacking and carriage and including all incidental charges like Royalty and labour charges for providing filter with well graded 40m.m.down stone metal/ shingle sand laying uniformly below pitching on bed, side slopes including preparing bed with earth work up to 30 cm depth, where necessary and compacting as per direction of the Engineer-in-Charge and including all leads and lifts complete.(Quarry bed belongs to L. & L. R Deptt. Govt of W.B)
N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arrive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (a) For Forest area Royalty including entry fee and TP fee : Rs. 178.33 per Cum (b) For Non-Forest area Royalty : Rs. 106.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works .
e) Shingles for Slope | - | Cum | 1,614.05 | - |
| 5 | Quarrying, Carrying, Supplying stone boulders/shingles from the Engineer-in-charge selected quarrying site to the site of work including cost of material, loading, unloading, stacking and carriage and including all incidental charges like Royalty. (Quarry bed belongs to L. & L. R Deptt. Govt of W.B)
N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arrive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (a) For Forest area Royalty including entry fee and TP fee : Rs. 178.33 per Cum (b) For Non-Forest area Royalty : Rs. 106.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works .
e) Shingles for interstices | 24.73 | Cum | 1,185 | ₹29,305.05 |
| 6 | Making rectangular /circular sausage cage with 10 SWG galvanized iron wire of 150mm.x150mm. mesh wirenetting with proper lapping of minimum 150mm including sewing the joints with 12 SWG GI wire and supply of all materials and equipments including placing the sausage cage in position, filling the same with boulder or lump aggregates complete as per direction of the Engineer-in-charge but excluding the cost of boulder /lump aggregates and its carriage upto site.(Cost is excluding the cost of end pieces) | 130 | Meter | 1,003.5 | ₹1,30,455 |
| 7 | Supplying, fitting, fixing end pieces for rectangular/ square/ circular sausages at the ends, with10SWG/ 8SWG GI wire net of different mesh sizes tying & sewing the same maintaning a lap langth of 150 mm all around with 12 SWG GI wire complete, including the cost of supply of wirenetting, fittingetc, complete as per direction of the Engineer-in-charge. | 135 | Sqm | 110.84 | ₹14,963.4 |
| 8 | Quarrying, Carrying, Supplying stone boulders/shingles from the Engineer-in-charge selected quarrying site to the site of work including cost of material, loading, unloading and carriage including all incidental charges like Royalty but exclusive labour charges for laying boulders in apron as per direction of the Engineer-in-charge. (Quarry be belongs to Forest Deptt Govt of W.B) N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (a) For Forest area Royalty including entry fee and TP fee : Rs. 178.33 per Cum (b) For Non-Forest area Royalty : Rs. 106.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works .
a) Boulder above 30kg each | 0.4 | Cum | 1,753.53 | ₹701.41 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.26 MB
2911_agreement.pdf
Tender Documents • 2.94 MB
BOQ_2446383.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .