| 2 | Admitted-Finance NO 81 58 BAJANAI KOIL STREET KARADIKUPPAM VILLAGE SHOLINGHUR TALUK RANIPET DISTRICT 632 505 | SHOLINGHUR | RANIPET | TAMIL NADU | 632505 | Admitted-Finance |
Tender Value
₹62.9 L
EMD Value
₹65,000
Closing Date
30 May 2022, 3:00 pmClosed
The Project Director
The Project Director DRDA Ranipet
Ranipet District Strengthening of road from Vedanthangal to Pudupattu Via Pudupattu H.C km 0-0 - 2-200 R161 H/O Karnavoor Panchayat in TNRRIS 2021-22 CGF 80 percentage Priority in Kaveripakkam Block
2022_RDTN_232378_1
A10-02601-2021
Open Tender
Civil Works
Item Rate
180 days
The Project Director
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹65,000
2 Jun 2022
16 May 2022
30 May 2022
16 May 2022
30 May 2022
16 May 2022
Amount
Kaveripakkam Block
1. Strengthening of the Road from Vedanthagal To pudupattu (via) pudupattu HC Road km 0/0 -2/200 ( R161)
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp
Picking the existing wornout BT surface to 5-10 cm thick including all labour charges etc complete
Carted earth filling for side berms and labour charges for filling etc complete
Providing & Laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges rentals for machinery, fuel and all other incidental charges etc, completed as per clause of MORTH Rev-5.
Applying Prime coat over WMM surface using 7 kgs of bitumen emulsion (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges as per Clause 502 of MORTH Rev-5.
Applying tack coat over WBM surface using 2.50 kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the issue rate as per the special conditions appended herewith including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags, etc., complete as per standard specification No 503 of MOST
Providing and laying the premix carpet with seal coat type a for 20mm thickness using 0.18 Cum of 13.2 mm IRC HBG metal and 0.09 Cum of 11.2 mm IRC HBG metal with 14.60 Kg of bitumen for pre mixing 10 Sqm of premix carpet ,for seal coat using 0.09 Cum of 6.70 mm chips with 9.80 Kgs of bitumen per 10 Sqm including cost and conveyance of materials to the work site and stacking them to the Dept metric gauge for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in Central hot mix plant for premix carpet using Paver only rolling by 80-100 KN, power roller for premix carpet and seal coat separately including labour charges for spreading the mix for the pre mix carpet application of bitumen for the seal coat over pre mix carpet , hire charges and fuel charges for mini hot mix plant bitumen boiler power roller and all other tools and plants employed etc., complete as per clause 509 of most specifications
Construction of 1.5 m RCC Slab Culvert @Ch 0/800
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Plain Cement Concrete 1:2:4 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc Complete,
RCC 1:1.5:3 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc,
Supply and fabrication of steel for RCC items including cost and conveyance of binding wire, etc., complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Slab Centring
Deck slab
Provision of Weep Holes
Provision for bitumen pad
Construction of 1.5 m RCC Slab Culvert @Ch 1/0
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Plain Cement Concrete 1:2:4 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc Complete,
RCC 1:1.5:3 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc,
Supply and fabrication of steel for RCC items including cost and conveyance of binding wire, etc., complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Slab Centring
Deck slab
Provision of Weep Holes
Provision for bitumen pad
Provision for HM stone
Provision for KM stone
Provision for Sign Board
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
venkatesan
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .