| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹88.2 LAccepted-AOC VILLAGE SAMLEU PO KHAIRI DISTT CHAMBA HP 176325 | CHAMBA | HIMACHAL PRADESH | 176325 | ₹88.2 L Quoted ₹92.6 L | L-1 | Accepted-AOC L-1 Bidder |
| 2 | L-2₹96.0 LRejected-Finance E 159 AJAY KUMAR VISHWAS PARK UTTAM NAGAR WEST DELHI DELHI 110059 UDYAM DL 10 0042709 | WEST DELHI | DELHI | 110059 | ₹96.0 L | L-2 | Rejected-Finance Not L-1 Bidder |
| 3 | L-3₹98.8 LRejected-Finance VILLAGE POST SURANGANI TEHSIL SALOONI DISTT CHAMBA HIMACHAL PRADESH 176317 | CHAMBA | HIMACHAL PRADESH | 176317 | ₹98.8 L | L-3 | Rejected-Finance Not L-1 Bidder |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically Not Qualified |
| Sl No | Description | Qty | Unit | Sahab Singh Thakur L3 | ajay kumar L2 | DUNERIA CONSTRUCTIONS PRIVATE LIMITED L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means Hydraulic excavator/manual means overareas (exceeding 30 cm in depth, 1.5 m inwidth as well as 10 sqm on plan) including getting out and disposal of excavated earthlead upto 50 m and lift upto 1.5 m, as directedby Engineer-in-charge. Ordinary rock. | 240.24 | Cum | 87,927.84 ₹1.0 L | 62,462.4 ₹73,705.63 | 50,448 ₹59,528.64 |
| 2.00 | Centering and shuttering including strutting, propping Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. and removal of form workfor Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 585.12 | Sqm | 1,73,195.52 ₹2.0 L | 2,34,048 ₹2.8 L | 2,14,739.04 ₹2.5 L |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up toplinth level :1:2:4 (1 Cement : 2 coarse sand) :4 graded stone aggregate 40 mm nominal size). | 1,271.4 | Cum | 76,28,400 ₹90.0 L | 71,85,952.8 ₹84.8 L | 71,03,311.8 ₹83.8 L |
| 4.00 | Providing and fixing U-PVC pipes (working pressure 4 kg / cm²) Single socketed pipe 110mm dia for weep holes. | 549.45 | Meter | 1,68,131.7 ₹2.0 L | 1,20,879 ₹1.4 L | 65,203.23 ₹76,939.81 |
| 5.00 | Providing and filling of Stone boulder behind R/wall. | 382.2 | Cum | 3,14,932.8 ₹3.7 L | 5,35,080 ₹6.3 L | 4,15,451.4 ₹4.9 L |
Updated dates
Tender Value
₹88.2 L
EMD Value
₹1.8 L
Closing Date
1 Dec 2025, 5:00 pmClosed
Dy General Manager (PnC)
Procurement and Contract Wing, CPS-I Khairi Distt. Chamba (HP) 176325.
Sewa River protection work near power house, CPS-1.
2025_NHPC_885018_1
NH/CPS-1/PnC/W-1563/2025-26/ 328 Dated 11/11/2025
Open Tender
Civil Works
90 days
Chamera Power Station-1
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
NHPC LIMITED
₹1.8 L
Yes
23 Jan 2026
11 Nov 2025
3 Dec 2025
11 Nov 2025
1 Dec 2025
11 Nov 2025
Earth work in excavation by mechanical means Hydraulic excavator/manual means overareas (exceeding 30 cm in depth, 1.5 m inwidth as well as 10 sqm on plan) including getting out and disposal of excavated earthlead upto 50 m and lift upto 1.5 m, as directedby Engineer-in-charge. Ordinary rock.
Centering and shuttering including strutting, propping Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. and removal of form workfor Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up toplinth level :1:2:4 (1 Cement : 2 coarse sand) :4 graded stone aggregate 40 mm nominal size).
Providing and fixing U-PVC pipes (working pressure 4 kg / cm²) Single socketed pipe 110mm dia for weep holes.
Providing and filling of Stone boulder behind R/wall.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
Ten.pdf
Tender Documents • 3.57 MB
BOQ_930239.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid