Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC | ₹3.1 L | L1 | Accepted-AOC Responsive |
| 2 | L2₹3.2 L+₹6,368 (2.02%)Rejected-Finance | ₹3.2 L+₹6,368 (2.02%) | L2 | Rejected-Finance quoted in higher amount |
Tender Value
Refer Docs
EMD Value
₹6,050
Closing Date
22 Sept 2020, 11:00 amClosed
Executive Engineer (Civil)
Office of the Deputychief Endinner,ALHW,Kavaratti Island Lakshadweep,
Maintenance of Navigational aids like channel marker bouy,twin point bouy, mooring bouy etc
2020_ALHW_579126_1
DCE/KVT/DB/T-21/2020-21
Open Tender
Marine Works
Item Rate
180 days
Minicoy Island
Please refer NIT document
2 documents required · 2 mandatory
₹0
₹6,050
Yes
26 Nov 2020
25 Aug 2020
23 Sept 2020
25 Aug 2020
22 Sept 2020
25 Aug 2020
Amount
Disconnecting and removing the navigational buoys with light from the anchor from Anchorage of different position in different channel of Minicoy lagoon and marking the position of anchor with GPS using floats tied with anchor then towing the buoy to shore safely beaching and stacking the buoy safely in stack yard and the removed parts inside LHW store excluding cost of materials like towing rope, float and rope, ‘D’ Shackle etc., which will be supplied by the department at departmental store as per actual site requirements, but including hire charges of boat, cost of all labour charges minor T&P etc., complete.
Collection of rubberized buoys, shifting from stack yard to sea shore, towing to different entrance and channels of Minicoy about 3 to 4 KM through lagoon and connecting to anchor already laid at different locations in channels and entrance and then fixing light stand and light over the buoys properly and locking etc, (Barge will be supplied free of hire charges as per actual requirement) including cost of all labour charges, hire charges of boat for towing & placing in position, all minor tools etc but excluding cost of ‘D’ shackle, M S Chain buoys etc which will be issued free of cost at departmental store/stacking yard at Minicoy etc as per actual site requirement
Painting two coats on RCC entrance tower surface above water level including cost of Paint, hire charges of boat, all labour charges for scrapping the outer area, cleaning, scaffolding, brushes, minor tools etc., complete.
Scrapping cleaning and painting the external surface of DWT 5000 ship mooring buoy and Twin point Mooring buoy with one coat of primer followed by two coats of approved /anticorrosive /epoxy black paint and white paint providing strips on top as triangular and sides of equal length and width with paint as directed by the Engineer-in-charge including cost of all labour charges, hire charges of boat, cost of paint, painting brush minor tools like scrapers wire brush chipping hammer and transportation charge of materials to work site etc. complete
DWT 5000 Ship mooring Buoy(Average-35 Sqm)
Twin point Mooring Buoy(Average-10 Sqm)
Ath Trades & Services
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .