Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.9 LAdmitted-Finance | -20.01% | ₹7.9 L | L1 | Admitted-Finance |
| 2 | L2₹8.3 L+₹39,915.75 (5.03%)Admitted-Finance | -15.99% | ₹8.3 L+₹39,915.75 (5.03%) | L2 | Admitted-Finance |
| 3 | L3₹9.2 L+₹1.3 L (15.9%)Admitted-Finance | -7.32% | ₹9.2 L+₹1.3 L (15.9%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹9.9 L
EMD Value
₹19,860
Closing Date
25 Jun 2026, 6:00 pmClosed
ADPC SMSA BARMER
DRDA FIRST FLOOR ADPC SMSA BARMER
CONSTRUCTION OF 1 ACR GUPS CHIDIYARA
2026_RCSCE_568188_1
NIT-03/CIVIL/SMSA/BARMER
Open Tender
Civil Works
Percentage
180 days
CONSTRUCTION OF 1 ACR GUPS CHIDIYARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
ADPC SMSA BARMER
₹19,860
Yes
1 Jul 2026
16 Jun 2026
29 Jun 2026
16 Jun 2026
25 Jun 2026
16 Jun 2026
16 Jun 2026 - 25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | 44.76 | cum | 178 | ₹7,967.28 |
| 2 | P.C.C. IN FOUNDATION Providing and laying in position cement concrete including curing compaction etc. of specified grade excluding the cost of centering and shuttering =All up to plinth leve 1:4:8 IS 456-2000 (1Cement :4 Course Sand :8 Graded stone aggregate 40 mm nominal size | 13.26 | cum | 3,302 | ₹43,784.52 |
| 3 | Random Rubble stone masonary for foundation and plinth in Cement Sand Mortar above 30 Cm. thick wall IS-1597 (Part-I) 1992 in : Cement Mortar 1:6 (1-Cement:6-Sand). | 35.47 | cum | 2,838 | ₹1,00,663.86 |
| 4 | DPC:Providing and laying in position specified grade of reinforced cement concrete including curing compaction finishing with rendering in cement sand mortar 1:3 (1-Cement:3-coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. All work up to plinth level : 1:1.5:3 (1-Cement:1.5 coarse sand:3-graded stone aggregate 20 mm nominal size) | 2.17 | cum | 4,934 | ₹10,706.78 |
| 5 | Supply & stacking good earth at site complete including loading , unloading and transportation etc &Filling available excavated earth (excluding rock) in trenches plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead upto 50 Mtr. and lift upto 1.5 Mtr. | 48.48 | cum | 450 | ₹21,816 |
| 6 | STONE MASONRY IN SUPER STRUCTURE-Random Rubble stone masonary for superstructure above plinth level one storey height above 30 Cm. thick walls in : Cement Mortar 1:6 (1-Cement:6-Sand). Wall up to 30 Cm. and less thickness. | 44.86 | cum | 3,479 | ₹1,56,067.94 |
| 7 | Supplying and fixing stone lintels/bed plates of approved quarry rough dressed in CM 1:4 upto 15 cm thick | 0.46 | Cum | 5,112 | ₹2,351.52 |
| 8 | Pillar Masonary:- Random Rubble stone masonary for superstructure above plinth level one storey height above 30 Cm. thick walls in : Cement Mortar 1:4 (1-Cement:4-Sand). Wall curved in plan to mean radius not exceeding 6 Mtr. Pillar masonry including bed plates as per specifications. Bed plate to be paid separately. | 1.64 | cum | 3,990 | ₹6,543.6 |
| 9 | Stone Kharanja: Random rubble dry stone kharanja under floor | 11.52 | cum | 932 | ₹10,736.64 |
| 10 | Lintel Beams:-Reinforced cement concrete work in beams, suspended floors, roofs, girders having slopes up to 150 , landings, balconies, shelves, chajjas, lintels, bands, plain windows sills, staircases and spiral staircases, up to floor three level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1-Cement:3-coarse sand) and making good and joints excluding the cost of centering, shuttering and reinforcement:1:1.5:3 (1-Cement:1.5 coarse sand:3-graded stone aggregate 20 mm nominal size). | 4.17 | cum | 5,185 | ₹21,621.45 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 9.45 MB
BOQ_1010784.xls
BOQ • 0.27 MB
CHIDIYARA.pdf
Tender Documents • 0.83 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .