Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹5.9 L
EMD Value
₹6,000
Closing Date
10 Mar 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BLock Development Officer (VP) Annavasal
Block Development Officer (VP) Panchayat Union, Annavasal
Construction of Girls Toilet at Poongudy PUM school
2023_RDTN_290691_1
617/2022/T4 Dt.21.02.2023
Open Tender
Civil Works
Item Rate
180 days
Annavasal
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹6,000
Yes
10 Mar 2023
24 Feb 2023
10 Mar 2023
24 Feb 2023
10 Mar 2023
24 Feb 2023
24 Feb 2023 - 10 Mar 2023
Amount
Construction of (Girls)Toilet @ Poongudy PUM school in Poongudy Panchayat
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS20 B for narrow foundation.
Filling in Basement with excavated earth in layers of not more than 15cm,thick well rammed,watered and consolidated complying with standard specifications etc.,complete.
Sand filling with M- sand including cost and conveyance of all meterials to site and all labour charges etec.complete
Cement concrete 1:4:8 mix using 40mm ISS metal including including cost and conveyance and all labour charges etc,
Brick Masonry IN CM 1:5 mix using courntry bricks of size 83/4x41/4x23/4 incluidng cost and conveyance and all labour charges etc., complete -
Centering charges for all RCC works incluidng cost and conveyance and all labour charges etc., complete -
Supply and fabrication of RTS Steel bars incluidng cost and conveyance and all labour charges etc., complete -
RCC 1:1.5:3 mix using 20mm ISS size of HBG metal incluidng cost and conveyance and all labour charges etc., complete -
Paving the flooring with special type of flooring Tiles including cost and conveyance of all materials to site and all labour charges etc., complete.
Dadooring walls with glazed Tiles including cost and conveyance of all materials to site and all labour charges etc., complete.
Supplying and fixing of Indian type water closet including all labour charges etc.,complete
Supplying and fixing of Indian Europian water closet including all labour charges etc.,complete
Finishing the exposed surface of RCC items of work such as slabs,beams,sunshade,facia,conopy slab,staircase waist slab,landing slab etc.,with cm 1:3,10mm thick including raking the surface.
PLASTERING WITH CEMENT MORTER 1:5 MIX 12MM THICKNESS including cost of conveyance of all materials to work site and all labour charges etc. complete
Toilet Door (1.00 x 1.80
Entrance Door 0.75 x 1.80
Distembering 2 coats of best approved quality of colour paint including cost and conveyance of all materials to site and all labour charges etc.,complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting two coats of approved paint including costand conveyance of all materials to site and all labour charges etc.,complete
Wiring with 2x1.5sqm PVC insulatedmSCmunsheathed Cu.conductor of 1100v grade in suitable PVC ridig pipe on wall and ceiling Light point
Wiring with 2x1.5sqm PVC insulatedmSCmunsheathed Cu.conductor of 1100v grade in suitable PVC ridig pipe on wall and ceiling plug point
Towards cost and fixing of11wCFL blub fittings
Name Board
Supply and delivery and fixing of HDPE tank with ISI marking
Provision for RCC Rings 0.9m dia
Provision for leachpit cover slab
Provision for handrail for ramp
Provision for handrail for DA toilet
Provision for Fibre roofing
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M. GANESAN
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .