Loading…
Loading…
Tender Value
₹6.7 L
EMD Value
₹13,440
Closing Date
9 Jul 2026, 6:00 pmDue tomorrow
Sr.RM RIICO Jhunjhunu
RIICO Office Jhunjhunu
Regular operation and maintenance of LED street light and High Mast Light at Industrial area and residential colony Jhunjhunu Phase-I
2026_RIICO_571582_1
09/2026-27/816/2
Open Tender
Electrical and Maintenance Works
730 days
I/A Jhunjhunu
Please refer Tender documents.
4 documents required · 4 mandatory
₹590
RIICO Jhunjhunu
₹13,440
27 Jun 2026
27 Jun 2026
10 Jul 2026
29 Jun 2026
9 Jul 2026
29 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item Rate | |||||
| 1.01 | Regular Operation and Maintenance of Street Light Fixtures LED 80-90 Watt in industrial area and residential colony jhunjhunu phase-I including supply and replacing the required material and labour etc. complete as per the following terms and conditions:- i.) At any moment a minimum of 90 percent of total fixture must be in order. The defective fixture must be repaired within 3 days, falling Which deduction for number of light which are not functioning in the industrial area shall be made at one time of the rate (accordingly deduction for lights which are not functioning becomes two times of the rates from total payment due for total number of lights whose operation and maintenance was awarded to the contractor ).ii.) Contractor shall arrange at his cost for put on off the street light fixture at appropriate time regularly as per instructions of Engineer-In charge. A register shall be maintained at RIICO, association office and complaint lodged must be attended by contractor within 24 hours. The person deputed by contractor shall attend the RIICO, Association office daily and comply the instructions and attend complaints regularly.iii.) Contractor will have to employ trained and qualified electricians for the work.iv.) Corporation shall not be responsible for any kind of accident during execution of work.v.) Contractor will be responsible for safety and security of fixtures and all concerned materials.vi.) Contractor will be responsible for arrangement of all Tn P required for the work.vii.) Cost of all labour and material like LED lamp and wire will be born by contractor. All material required for the work shall not be below the category-II of concerned BSR item. Contractor has to repair and maintenance LED fixture with material in all cases like short circuit, phase to phase of AVVNL line etc.viii.) No extra payment will be made for fixing removal of extra, existing fixture in the industrial area.ix.) Contractor will be responsible for timely collection and deposition of electric bills of areas in each month. In case of delay in payment and AVVNL impose surcharge for delay payment the same will be recovered from the running bill for the contractor. Payment of electricity bill will be made by RIICO.x.) Contractor will be responsible for rebate of Timer provided by AVVNL. Hence contractor will maintain the On Off system by timer properly. In case no rebate is provided by AVVNL due to failure of timer then rebate will be deducted from contractor payment.xi.) Contractor will be responsible for any theft of electricity through poles and he will make necessary arrangements for this. In case of any theft is found suitable penalty will be imposed on the contractor. xii.) Contractor will maintain cubical panel board and accessories fitted in it. In case of any fault repair, replace of material will be done by the contractor at his own cost. No extra payment will be made on behalf of material.xiii.) Contractor has to keep ready total fixtures. In case of fault of fixture a penalty of Rs.100 per fixture per day will be imposed on the contractor.Xiv.) The period of maintenance of street light will be 2 years and extension of work order for further 1 year may be allow if contractor performance found satisfactory. | 7,200 | per light per month | - | - |
| 1.02 | Regular Operation and Maintenance of High mast light (having 12 LED fixtures 200 watt as a complete set) in at residential colony jhunjhunu phase-I including supply and replacing the required material and labour etc. complete as per the following terms and conditions- i At any moment a minimum of 90 percent of total fixture must be in order. The defective fixture must be repaired within 3 days, falling Which deduction for number of light which are not functioning in the industrial area shall be made at one time of the rate (accordingly deduction for lights which are not functioning becomes two times of the rates from total payment due for total number of lights whose operation and maintenance was awarded to the contractor ).ii Contractor shall arrange at his cost for put on off the street light fixture at appropriate time regularly as per instructions of Engineer-In charge. A register shall be maintained at RIICO, association office and complaint lodged must be attended by contractor within 24 hours. The person deputed by contractor shall attend the RIICO, Association office daily and comply the instructions and attend complaints regularly.iii Contractor will have to employ trained and qualified electricians for the work.iv Corporation shall not be responsible for any kind of accident during execution of work.v Contractor will be responsible for safety and security of fixtures and all concerned materials.vi Contractor will be responsible for arrangement of all Tn P required for the workvii Cost of all labour and material like LED lamp and wire will be born by contractor. All material required for the work shall not be below the category-II of concerned BSR item. Contractor has to repair and maintenance LED fixture with material in all cases like short circuit, phase to phase of AVVNL line etc.viiiNo extra payment will be made for fixing removal of extra,existing fixture in the industrial area.ixContractor will be responsible for timely collection and deposition of electric bills of areas in each month. In case of delay in payment and AVVNL impose surcharge for delay payment the same will be recovered from the running bill fo the contractor. Payment of electricity bill will be made by RIICO.x Contractor will be responsible for rebate of Timer provided by AVVNL. Hence contractor will maintain the On Off system by timer properly. In case no rebate is provided by AVVNL due to failure of timer then rebate will be deducted from contractor payment.xi Contractor will be responsible for any theft of electricity through poles and he will make necessary arrangements for this. In case of any theft is found suitable penalty will be imposed on the contractor.xiiContractor will maintain cubical panel board and assessories fitted in it. In case of any fault repair, replace of material will be done by the contractor at his own cost. No extra payment will be made on behalf of material.xiiiContractor has to keep ready total fixtures. In case of fault of fixture a penalty of Rs.100 per fixture per day will be imposed on the contractor.Xiv The period of maintenance of street light will be 2 years and extension of work order for further 1 year may be allow if contractor performance found satisfactory | 24 | per high mast per month | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
tdlight.pdf
Tender Documents • 2.60 MB
StreetConditions.pdf
Other Document • 0.99 MB
BOQ_1017047.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid