Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.2 LAdmitted-Finance OFF EASTERN EXPRESS HIGHWAY 6TH FLOOR 6 603 FLOWER VALLEY NITIN CADBURY FLYOVER KHOPAT THANE 400601 | THANE | THANE | MAHARASHTRA | 400601 | ₹40.2 L | L1 | Admitted-Finance |
| 2 | L2₹40.3 LAdmitted-Finance 502 FLOWER VALLEY COMPLEX EASTERN EXPRESS HIGHWAY NEAR BANTA COMPOUND KHOPAT THANE WEST 400601 | THANE | THANE | MAHARASHTRA | 400601 | ₹40.3 L | L2 | Admitted-Finance |
| 3 | L3₹40.8 LAdmitted-Finance | ₹40.8 L | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Work Experience certificate is not uploades as per NIT. |
| 5 | Rejected-Technical FLAT NO 105 2A SURVEY NO 30 2 MORAYA HEIGHTS DHANKAWADI PUNE 411043 | PUNE | PUNE | MAHARASHTRA | 411043 | - | - | Rejected-Technical Work Experience certificate is not uploades as per NIT. |
| Sl No | Description | Qty | Unit | VEER INFRATECH L1 | ADITI CONSTRUCTION L2 | S KUMAR CONSTURCTION L3 |
|---|---|---|---|---|---|---|
| 0.00M&R to Water Supply Scheme for Nagothane Indl. Area .… Regradation of top layer of Filter beds, Rehabilitation and Structural strengthening of Filter Beds. | ||||||
| 1.00 | Removing of Filter Media Sand and Gravel; including lifting, stacking and same within 50m lead from filter house. | 105 | Cubic Meter | 515 ₹54,075 Lowest | 515 ₹54,075 Lowest | 530 ₹55,650 |
| 2.00 | Supply of filter media fine quality sand from any source having effective size 0.45 to 0.70 and uniformity coefficient within the limit of 1.3 to 1.7 within premises as per IS 8419 Part-I of 1977 including transportation, loading, unloading, stacking and for all leads. | 68 | Cubic Meter | 16,935 ₹11,51,580 | 16,932 ₹11,51,376 Lowest | 17,000 ₹11,56,000 |
| 3.00 | Conveying of filter media sand from godown / store to filter box & laying | 173 | Cubic Meter | 150 ₹25,950 Lowest | 155 ₹26,815 | 180 ₹31,140 |
| 4.00 | Filling the old and new gravels and fine sand in the filter beds properly in grades and layers as required including all labour and tools and plants etc complete. | 173 | Cubic Meter | 343 ₹59,339 Lowest | 345 ₹59,685 | 380 ₹65,740 |
| 5.00 | Removing the existing cement plaster of any thickness without causing dust nuisance and stacking the debris upto a distance of 50 metres or spreading in the compound and cleaning the site etc. complete. (Rates excluding GST) | 645 | Square Meter | 52 ₹33,540 Lowest | 52 ₹33,540 Lowest | 52 ₹33,540 Lowest |
| 6.00 | "Providing repairing damaged portion of RCC structure with ready mixed plaster for deep damaged parts with RP-100 as per detailed specification, including material, labour, curing etc. complete. (Rates excluding GST) " | 390 | Square Meter | 2,600 ₹10,14,000 Lowest | 2,600 ₹10,14,000 Lowest | 2,650 ₹10,33,500 |
| 7.00 | Providing & applying flexible coating of CW- 100 to provide a flexible water proof barrier and to withstand anti carbonation, base coat to fill capillaries and fill the pores as per detailed specification including material, labours etc complete.(Rates excluding GST) | 645 | Square Meter | 1,360 ₹8,77,200 Lowest | 1,367 ₹8,81,715 | 1,380 ₹8,90,100 |
| 8.00 | Providing and applying epoxy slurry mortar (GSM), which is a three component of Resin, hardener and thickened water to stop leakages rising dampness, seepage of water from internal or external RCC slabs, tanks masonary walls including all costs of labour and material, as per direction of engineer in charge etc. complete(Rates excluding GST) | 645 | Square Meter | 1,250 ₹8,06,250 Lowest | 1,250 ₹8,06,250 Lowest | 1,270 ₹8,19,150 |
Tender Value
₹40.3 L
EMD Value
₹40,400
Closing Date
1 Jul 2026, 5:00 pmClosed
Executive Engineer, MIDC Alibag Division, Alibag
Office of EE, MIDC Alibag Division, Alibag
M and R to Water Supply Scheme for Nagothane Indl. Area ... Regradation of top layer of Filter beds, Rehabilitation and Structural strengthening of Filter Beds.
2026_MIDC_1309153_1
ETN No.19/12 for 2026-2027
Open Tender
Civil Works
Item Rate
180 days
Nagothane
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,030
₹40,400
9 Jul 2026
17 Jun 2026
3 Jul 2026
17 Jun 2026
1 Jul 2026
25 Jun 2026
17 Jun 2026 - 22 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | M&R to Water Supply Scheme for Nagothane Indl. Area .… Regradation of top layer of Filter beds, Rehabilitation and Structural strengthening of Filter Beds. | - | - | - | - |
| 1 | Removing of Filter Media Sand and Gravel; including lifting, stacking and same within 50m lead from filter house. | 105 | Cubic Meter | - | - |
| 2 | Supply of filter media fine quality sand from any source having effective size 0.45 to 0.70 and uniformity coefficient within the limit of 1.3 to 1.7 within premises as per IS 8419 Part-I of 1977 including transportation, loading, unloading, stacking and for all leads. | 68 | Cubic Meter | - | - |
| 3 | Conveying of filter media sand from godown / store to filter box & laying | 173 | Cubic Meter | - | - |
| 4 | Filling the old and new gravels and fine sand in the filter beds properly in grades and layers as required including all labour and tools and plants etc complete. | 173 | Cubic Meter | - | - |
| 5 | Removing the existing cement plaster of any thickness without causing dust nuisance and stacking the debris upto a distance of 50 metres or spreading in the compound and cleaning the site etc. complete. (Rates excluding GST) | 645 | Square Meter | - | - |
| 6 | "Providing repairing damaged portion of RCC structure with ready mixed plaster for deep damaged parts with RP-100 as per detailed specification, including material, labour, curing etc. complete. (Rates excluding GST) " | 390 | Square Meter | - | - |
| 7 | Providing & applying flexible coating of CW- 100 to provide a flexible water proof barrier and to withstand anti carbonation, base coat to fill capillaries and fill the pores as per detailed specification including material, labours etc complete.(Rates excluding GST) | 645 | Square Meter | - | - |
| 8 | Providing and applying epoxy slurry mortar (GSM), which is a three component of Resin, hardener and thickened water to stop leakages rising dampness, seepage of water from internal or external RCC slabs, tanks masonary walls including all costs of labour and material, as per direction of engineer in charge etc. complete(Rates excluding GST) | 645 | Square Meter | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.32 MB
TenderDocument.pdf
Tender Documents • 0.28 MB
ItemSpecification.pdf
Additional Documents • 0.02 MB
BOQ_2246044.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].