| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.8 LAdmitted-Finance HARIBHANPUR KALIKABARA VARANASI | BASTI | UTTAR PRADESH | 271305 | ₹21.8 L | L1 | Admitted-Finance |
| 2 | L2₹21.9 LAdmitted-Finance | ₹21.9 L | L2 | Admitted-Finance |
| 3 | L3₹21.9 LAdmitted-Finance | ₹21.9 L | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical MOHALLA AHIRPADA HARDUAGANJ ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | - | - | Not Admitted-Fee/PreQual/Technical Others-not submit tender fee |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-tender fee not submit |
Tender Value
₹22.1 L
EMD Value
₹45,000
Closing Date
14 Feb 2026, 12:00 pmClosed
VC ADA
ramghat road aligarh
Construction work of park and Side patri swarn jyanti Nagar Vistar Yojna Sector C Aligarh
2026_ALIDA_1111736_4
5773
Open Tender
Civil Works
aligarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
Yes
VC ADA
₹45,000
Yes
18 Feb 2026
3 Feb 2026
14 Feb 2026
3 Feb 2026
14 Feb 2026
3 Feb 2026
Excavation in foundation in ordinary Soil (Loan clay or sand) including lift upto 1.5m lead upto 30.0 m & including filling watering and ramming of excavated earth into the space between the building & sides of foundation trenches or into the plinth and removal & disposal surplus earth as directed by the engineer I/C within a lead of 30m. from foundation trenches.SI no 265 SOR-2022
Construction of sub grade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table no, 300-2 Carted earth 8 km. As per morth specification on 305/SI no 3.18
Providing and laying Cement concrete 1:4:8 (1cement :4 coarse sand :8 graded stone ballast 40 mm. nominal size) including supply of all materials, labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation.SI no 275(a) SOR-2022
Brick work with common burnt clay F.P.S (non modular) bricks of class designation -100 class brickwork 1:4 Cement and Coarse sand for foundation and Plinth UPPWD SOR 2022 SI no 6.1.1 page 30
Providing and laying of 25mm thick DPC. SI no 361(a) SOR-2022
Brick work with common burnt clay F.P.S (non modular) bricks of class designation -100 class brickwork 1:4 Cement and Coarse sand for Super Structure.
12mm thick cement plaster on brick work with cement mortar of mix 1:4 (1cement:4Coarse sand) SI no 584 SOR-2022
15cm thick plaster with cement and course sand of 1.25 fineness modulus in 1:4 over brick work minimum thickness not be less than 1 cm including supply of all material ,labour tools and plants etc required for proper completion of work.
M.S Iron Work For Heavy Size and Section SI no 16new SOR-2022
Finishing wall (Two Coat ) with exterior paint (Apex) of approved brand and manufacture and of required shade on undercoated wall surface to give even shade including one coat of primer applied curing cost of all material labour T&P etc.SI no 21New SOR-2022
Painting two coat or including preparing the surface by thoroughly clearing the surface of all dirt dust and scrapping and papering Including cost of all material labour T&P etc required for proper completion of work.SI no (2New+3New) SOR-2022Page 61
Supply and Fixing of Rest Chair Bench
Laying and Jointing PVC Pipe. Heading
Earth work in excavation in foundation trenches in ordinary soil(Loam, Clay or Sand) including laft upto 1.50 M and lead up to 30m and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the side of the foundation trenches ot into the plinth and rewmoval and disposal of surplus Earth as directed by the engineer-in-charge up to a distance of 30m from the foundation trenches.SI No.251 SOR 2022-23 Page 25
Cement concrete with 4cm gauge stone Aggregate, Coarse sand & cement in propotion of 1:6:12 in foundation & under floors including supply of all materials , labour, tools & plants etc. Required for proper completion of the work SI No.273(a) SOR 2022-23 Page 27
M-100 Brick work in 1:4 ( one cement& four coarse sand) mortar in foundation & plinth including supply of all materials, labour, Tools & plants etc. Required for proper completion of the workDSR No.6.1.2 SOR 2022-23 Page 30
Concrete with 2 cm. Gauge approved stone ballast, coarse sand and cement in foundation and under floors in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. Required for proper completion of the work. SI No 279 SOR 2022-23 Page 28
Construction of sub grade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table no, 300-2 Carted earth 8 km. As per MORTH Specification 305/SI No 3.18
Providing,laying ,spreading and compacting graded aggregate to Granular Sub Base with close graded specification including primixing the material with water at OMC in mechanical mix plant carriage of mix material by tipper to site laying in uniform on well prepared surface and compecting with vibratory rollar to achive the desired density.complete as per close 401 DSR 16.78.1
Laying of I Shaped Precast interlocking tiles 80 mm thick (Compressive Strength not less than 30 mpa and weight 4.50 kg) including 25 mm thick local sand base levelling and dressing of surface to required level and slope, filling joints with local sand all complete work.DSR No.16.68 SOR 2022-23 Page 71
Supply of Sweeper (Full time) SI No 26(a) SOR 2022
Please Enable Macros to View BoQ information
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
DOC_RFP.pdf
Tender Documents • 9.37 MB
BOQ_2055210.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid