Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-AOC | L1 | Accepted-AOC AWARD OF WORK TO L1 BIDDER AND REJECT L2, L3 AND L4 BIDDER DUE TO NOT L1 BIDDER | |
| 2 | Rejected-Technical MORWA SHUKLA MODE WARD NO 2 P O SINGRAULI DISTT SINGRAULI M P PIN 486889 | SINGRAULI | SINGRAULI | MADHYA PRADESH | 486889 | - | Rejected-Technical NOT L1 BIDDER | |
| 3 | Rejected-Technical KOHRAUL PO YOGICHIOURA DISTT SONEBHADRA UP | - | Rejected-Technical NOT L1 BIDDER | |
| 4 | Rejected-Technical 56 HARSHNAGAR VEER ENGINEERING WORKS ROBERTSGANJ RAILWAY STATION ROAD SONBHADRA UTTAR PRADESH 231216 | SONBHADRA | UTTAR PRADESH | 231216 | - | Rejected-Technical NOT L1 BIDDER |
| Sl No | Description | Qty | Unit | SHASHI ENGINEERING WORKS L3 | UMESH ENTERPRISES L1 | Veer Engineering Works L4 | KOHLI & SONS L2 |
|---|---|---|---|---|---|---|---|
| 1.00Scope of Work/Technical Specifications etc: 1. Cleaning of the working area including removal of grease/ cardium/Oil sludge etc. from around the rails. 2. Jacking of revolving frame and providing support for ensuring adequate clearance for the removal and fitment of the rail set and Roller circle. 3. Removal of old/damaged upper and lower Roller Rail Segments and Live Ring Assembly. 4. Fitment of new roller and cage assembly pertaining to the live ring assembly. 5. Proper alignment of the rails and live ring assembly. 6. Fixing the rails at their properly aligned position by the means of stoppers and subsequent tightening of bolts and fasteners. 7. Resetting the revolving frames to its Original Position by removing the support (provided for clearance) and jacking down the revolving frame. 8. Testing of the swing operation and correction of any abnormality. 9. Commissioning of the machine. 10. Clearing of the working area of any scrap, spare etc. | |||||||
| 2.10 | Labour Charges for cleaning of the working areas (parallel activity) including contractor's profit. . Note : It includes 06 Nos. Un-Skilled manpower in 02 Shifts per day for 11 days. | 1 | Job | 50,000 ₹50,000 | 46,200 ₹46,200 Lowest | 79,000 ₹79,000 | 60,000 ₹60,000 |
| 2.20 | Labour Charges for removal of old upper and lower rail segment (24 nos.) and Live Ring assembly including contractor's profit. . Note : It includes a group of 01 No. Highly Skilled Supervisor, 04 Nos. Skilled Fitter, 02 Nos. Skilled Welder & 08 Nos. Semi-Skilled manpower in 02 Shifts per day for 06 days. | 1 | Job | 1,50,000 ₹1,50,000 | 95,000 ₹95,000 Lowest | 1,45,000 ₹1,45,000 | 1,02,000 ₹1,02,000 |
| 2.30 | Labour Charges for fitment of new Rail segment (24 nos.) and Live Ring assembly, alignment and testing including contractor's profit. . Note : It includes a group of 01 No. Highly Skilled Supervisor, 04 Nos. Skilled Fitter, 02 Nos. Skilled Welder & 08 Nos. Semi-Skilled manpower in 02 Shifts per day for 13 days. | 1 | Job | 1,54,890 ₹1,54,890 Lowest | 1,90,000 ₹1,90,000 | 2,60,000 ₹2,60,000 | 2,35,000 ₹2,35,000 |
| 3.00Hiring Charges | |||||||
| 3.10 | Hiring Charges for Welding Machine with accessories for 19days. Note: 02 Nos. Welding Machine per day. | 38 | Nos. | 220 ₹8,360 | 150 ₹5,700 | 100 ₹3,800 Lowest | 100 ₹3,800 Lowest |
| 3.20 | Hiring Charges for Gas Cutting set with accessories for 19days. Note: 02 Nos. Gas Cutting set with accessories per day. | 38 | Nos. | 100 ₹3,800 Lowest | 150 ₹5,700 | 100 ₹3,800 Lowest | 100 ₹3,800 Lowest |
| 3.30 | Hiring Charges for Grinder for 19days. Note: 02 Nos. Grinder per day. | 38 | Nos. | 150 ₹5,700 | 150 ₹5,700 | 50 ₹1,900 Lowest | 100 ₹3,800 |
| 3.40 | Hiring Charges for Handlamp for 19days. Note: 05 Nos. Handlamp per day. | 95 | Nos. | 50 ₹4,750 | 80 ₹7,600 | 25 ₹2,375 Lowest | 40 ₹3,800 |
| 3.50 | Hiring Charges for Exhaust Fan for 19days. Note: 05 Nos. Exhaust Fan per day. | 95 | Nos. | 100 ₹9,500 | 70 ₹6,650 | 25 ₹2,375 Lowest | 40 ₹3,800 |
Tender Value
₹7.1 L
EMD Value
₹9,000
Closing Date
31 Jul 2025, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GENERAL MANAGER EXCAVATION, NCL KHADIA PROJECT
NCL KHADIA PROJECT, SHAKTINAGAR, SONEBHADRA, UP, 231222
Removal of old / damaged Rail sets and Live Ring assembly and fitment of new Rail sets and Live Ring assembly in 33/72 Somnath Dragline of Khadia Project
2025_NCL_339854_1
KHD/G.M. (Excv)/E-Tender/25-26/450
Open Tender
Excavation Department Work
Item Rate
19 days
NCL KHADIA PROJECT, SHAKTINAGAR
Please refer Tender documents.
6 documents required · 6 mandatory
₹9,000
20 Dec 2025
18 Jul 2025
1 Aug 2025
18 Jul 2025
31 Jul 2025
19 Jul 2025
18 Jul 2025 - 26 Jul 2025
Amount
Scope of Work/Technical Specifications etc: 1. Cleaning of the working area including removal of grease/ cardium/Oil sludge etc. from around the rails. 2. Jacking of revolving frame and providing support for ensuring adequate clearance for the removal and fitment of the rail set and Roller circle. 3. Removal of old/damaged upper and lower Roller Rail Segments and Live Ring Assembly. 4. Fitment of new roller and cage assembly pertaining to the live ring assembly. 5. Proper alignment of the rails and live ring assembly. 6. Fixing the rails at their properly aligned position by the means of stoppers and subsequent tightening of bolts and fasteners. 7. Resetting the revolving frames to its Original Position by removing the support (provided for clearance) and jacking down the revolving frame. 8. Testing of the swing operation and correction of any abnormality. 9. Commissioning of the machine. 10. Clearing of the working area of any scrap, spare etc.
Labour Charges for cleaning of the working areas (parallel activity) including contractor's profit. . Note : It includes 06 Nos. Un-Skilled manpower in 02 Shifts per day for 11 days.
Labour Charges for removal of old upper and lower rail segment (24 nos.) and Live Ring assembly including contractor's profit. . Note : It includes a group of 01 No. Highly Skilled Supervisor, 04 Nos. Skilled Fitter, 02 Nos. Skilled Welder & 08 Nos. Semi-Skilled manpower in 02 Shifts per day for 06 days.
Labour Charges for fitment of new Rail segment (24 nos.) and Live Ring assembly, alignment and testing including contractor's profit. . Note : It includes a group of 01 No. Highly Skilled Supervisor, 04 Nos. Skilled Fitter, 02 Nos. Skilled Welder & 08 Nos. Semi-Skilled manpower in 02 Shifts per day for 13 days.
Hiring Charges
Hiring Charges for Welding Machine with accessories for 19days. Note: 02 Nos. Welding Machine per day.
Hiring Charges for Gas Cutting set with accessories for 19days. Note: 02 Nos. Gas Cutting set with accessories per day.
Hiring Charges for Grinder for 19days. Note: 02 Nos. Grinder per day.
Hiring Charges for Handlamp for 19days. Note: 05 Nos. Handlamp per day.
Hiring Charges for Exhaust Fan for 19days. Note: 05 Nos. Exhaust Fan per day.
Hiring Charges for 250T Hydraulic Jack for 19days. Note: 04 Nos. 250T Hydraulic Jack per day.
Charges for Transportation of Manpower.
Charges for Spl. Alignment Tools (Trammel).
Charges for Misc. Tools & tackles like Chipping Hammer, Tie Rod, Wegdes, Crowbars, Hammers etc..
Total impact of GST for the purpose of CTC
KOHLI & SONS (BID ID -1170775)
SHASHI ENGINEERING WORKS (BID ID -1171514)
Veer Engineering Works (BID ID -1171813)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_352313.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .