Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
15 Oct 2026, 6:00 pm6d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Commissioner M.C. Rajsamand
Muncipal Council Rajsamand
Nagar Parishad Kshetra me culvert nirman karya (Nagar Parishad Rajsamand)
2026_DLB_603205_1
ENIT 16/2026-27 Date 01.10.2026
Open Tender
Civil Works
Percentage
365 days
Rajsamand
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
Commissioner M.C. Rajsamand and MDRISL Jaipur
₹20,000
Yes
5 Oct 2026
5 Oct 2026
16 Oct 2026
6 Oct 2026
15 Oct 2026
6 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing at site, lowering & laying in trenches, aligning & jointing of RCC pipes NP4 class (with s/s ends) IS: 458 - 1988 (amended up to date) marked and pipes from 300 mm upto 2000 mm manufactured through vertical casting process all levels with Rubber gaskets (EPDM/SBR) for sewer lines as per IS: 5382 (including cost of Rubber gaskets lubricants) as per drawing, sectional hydro testing of the sewer pipe line (including cost and conveyance of water to site for testing) etc., complete as directed by Engineer.300 mm internal diameter | 1 | Mtr | 1,187 | ₹1,187 |
| - | Providing at site, lowering & laying in trenches, aligning & jointing of RCC pipes NP4 class (with s/s ends) IS: 458 - 1988 (amended up to date) marked and pipes from 300 mm upto 2000 mm manufactured through vertical casting process all levels with Rubber gaskets (EPDM/SBR) for sewer lines as per IS: 5382 (including cost of Rubber gaskets lubricants) as per drawing, sectional hydro testing of the sewer pipe line (including cost and conveyance of water to site for testing) etc., complete as directed by Engineer.450 mm internal diameter | 1 | Mtr | 2,135 | ₹2,135 |
| - | Providing at site, lowering & laying in trenches, aligning & jointing of RCC pipes NP4 class (with s/s ends) IS: 458 - 1988 (amended up to date) marked and pipes from 300 mm upto 2000 mm manufactured through vertical casting process all levels with Rubber gaskets (EPDM/SBR) for sewer lines as per IS: 5382 (including cost of Rubber gaskets lubricants) as per drawing, sectional hydro testing of the sewer pipe line (including cost and conveyance of water to site for testing) etc., complete as directed by Engineer.600 mm internal diameter | 1 | Mtr | 3,535 | ₹3,535 |
| - | Providing at site, lowering & laying in trenches, aligning & jointing of RCC pipes NP3 class (with s/s ends) IS: 458 - 1988 (amended up to date) marked and pipes from 300 mm upto 2000 mm manufactured through vertical casting process all levels with Rubber gaskets (EPDM/SBR) for sewer lines as per IS: 5382 (including cost of Rubber gaskets lubricants) as per drawing, sectional hydro testing of the sewer pipe line (including cost and conveyance of water to site for testing) etc., complete as directed by Engineer.1000 mm internal diameter | 1 | Mtr | 8,550 | ₹8,550 |
| - | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. | 1 | Cum | 235.5 | ₹235.5 |
| - | Carriage of Materials by mechanical transport including loading, unloading and stacking ::Earth 2 km | 1 | Cum | 185.54 | ₹185.54 |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:4:8 (1 cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size) | 1 | Cum | 4,575 | ₹4,575 |
| - | Random rubble masonry with hard stone in foundation and plinth :Cement mortar 1:6 (1 cement : 6 coarse sand) | 1 | Cum | 4,860 | ₹4,860 |
| - | Reinforcement for R.C.C. work at all levels including straightening,cutting, bending, placing in position and binding all complete.Thermo-Mechanically Treated bars. | 1 | Cum | 83.3 | ₹83.3 |
| - | Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete. | 1 | Cum | 236.5 | ₹236.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.79 MB
BOQ_1069405.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .