Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.5 LAdmitted-Finance | ₹45.5 L | L1 | Admitted-Finance |
| 2 | L2₹46.3 L+₹81,481.81 (1.79%)Admitted-Finance KRISHNA NAGAR ZERO MILE ARA BHOJPUR BIHAR 802302 | ARA | BHOJPUR | BIHAR | 802302 | ₹46.3 L+₹81,481.81 (1.79%) | L2 | Admitted-Finance |
| 3 | L3₹46.5 L+₹99,274.91 (2.18%)Admitted-Finance | ₹46.5 L+₹99,274.91 (2.18%) | L3 | Admitted-Finance |
| 4 | L4₹47.9 L+₹2.4 L (5.20%)Admitted-Finance | ₹47.9 L+₹2.4 L (5.20%) | L4 | Admitted-Finance |
| 5 | L5₹48.2 L+₹2.7 L (5.83%)Admitted-Finance C O GUPTA EMPORIUM AR BAZAR HAPPY VALLEY SHILLONG 793 004 | EAST KHASI HILLS | MEGHALAYA | 793004 | ₹48.2 L+₹2.7 L (5.83%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Bharara construction L4 | M/S MANOJ KUMAR BAL L7 | M/S UTTAM SAHA L5 | M/S U.K ENTERPRISE L8 | Shekhar Trading Co. L1 | M/s SK Dey L3 | M/S SAMAL CONSTRUCTION L9 | JANGLI BABA ENTERPRISES L2 | M/s Chandan Kumar Thakur L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of cement concrete( unreinforced) in ground floors n. exc 15 cm thick below or above ground level complete all as specified and directed. | 20.31 | Cum | 1,465 ₹29,754.15 | 1,480 ₹30,058.8 | 1,392 ₹28,271.52 | 1,460 ₹29,652.6 | 450 ₹9,139.5 Lowest | 1,320 ₹26,809.2 | 1,500 ₹30,465 | 1,380 ₹28,027.8 | 1,390 ₹28,230.9 |
| 2.00 | Demolition of precast cement concrete block built in cement mortar or cement lime mortar complete all as specified and directed. | 32.37 | Cum | 1,265 ₹40,948.05 | 1,250 ₹40,462.5 | 1,305 ₹42,242.85 | 1,280 ₹41,433.6 | 450 ₹14,566.5 Lowest | 1,250 ₹40,462.5 | 1,300 ₹42,081 | 694 ₹22,464.78 | 1,190 ₹38,520.3 |
| 3.00 | Dismantling of timber scantling 40sqcm and over in section in any position (framed) complete all as specified and directed. | 2.09 | Cum | 960 ₹2,006.4 | 980 ₹2,048.2 | 965 ₹2,016.85 | 1,050 ₹2,194.5 | 500 ₹1,045 Lowest | 940 ₹1,964.6 | 970 ₹2,027.3 | 640 ₹1,337.6 | 947 ₹1,979.23 |
| 4.00 | Dismantling of timber fillets, nails post rafters purlins etc. under 40 sqcm in section in framed work complete all as specified and directed. | 425 | per Rm | 55 ₹23,375 | 45 ₹19,125 | 50 ₹21,250 | 42 ₹17,850 | 25 ₹10,625 | 40 ₹17,000 | 47 ₹19,975 | 20 ₹8,500 Lowest | 49 ₹20,825 |
| 5.00 | Dismantling of posts or struts ( wood, steel, RCC) embeded in concrete any section including taking out of embeded portion and making good disturbed ground complete all as specified and directed. | 10 | per Rm | 63 ₹630 | 70 ₹700 | 72 ₹720 | 65 ₹650 | 25 ₹250 Lowest | 60 ₹600 | 65 ₹650 | 41 ₹410 | 75 ₹750 |
| 6.00 | Dismantling of plain/corrugated steel sheeting any gauge, thickness in roof covering complete all as specified and directed. | 157.62 | Sqm | 144 ₹22,697.28 | 145 ₹22,854.9 | 155 ₹24,431.1 | 150 ₹23,643 | 25 ₹3,940.5 Lowest | 140 ₹22,066.8 | 142 ₹22,382.04 | 28 ₹4,413.36 | 152 ₹23,958.24 |
| 7.00 | Demoltion of read lathing single, double, inluding bottom and plaster or checken wire lathing complete all as specified and directed. | 101.88 | Sqm | 78 ₹7,946.64 | 78 ₹7,946.64 | 92 ₹9,372.96 | 82 ₹8,354.16 | 20 ₹2,037.6 Lowest | 75 ₹7,641 | 77 ₹7,844.76 | 30 ₹3,056.4 | 74 ₹7,539.12 |
| 8.00 | Taking down shutters of any description exc 1sqm and n. exc. 2 sqm each complete all as specified and directed. | 2 | per leaf | 86 ₹172 | 85 ₹170 | 86 ₹172 | 75 ₹150 Lowest | 250 ₹500 | 80 ₹160 | 83 ₹166 | 78 ₹156 | 83 ₹166 |
| 9.00 | Taking down shutters of any description n. exc 1 sqm each complete all as specified and directed. | 6 | per leaf | 72 ₹432 | 75 ₹450 | 95 ₹570 | 85 ₹510 | 250 ₹1,500 | 70 ₹420 Lowest | 71 ₹426 | 78 ₹468 | 72 ₹432 |
| 10.00 | Taking down chowkhats with shutters (without taking of shutter for frames) n exc 1.5sqm complete all as specified and directed. | 2 | Each | 232 ₹464 | 220 ₹440 | 255 ₹510 | 235 ₹470 | 50 ₹100 Lowest | 220 ₹440 | 220 ₹440 | 357 ₹714 | 250 ₹500 |
Tender Value
₹46.6 L
EMD Value
₹93,240
Closing Date
13 Jun 2026, 6:00 pmClosed
GE SHILLONG
GE SHILLONG SHILLONG PIN 793002
PROVN OF NEW CLASS ROOM ALONGWITH ALL TOILET IN RHINO ARMY PRE PRIMARY SCHOOL (RAPPS) HAPPY VALLEY UNDER GE SHILLONG
2026_MES_765887_1
GE/SHL/TOKEN-36 OF 2026-27
Open Tender
Civil Works
Item Rate
180 days
GE SHILLONG
ALL AS PER TENDER DOCUMENT
7 documents required · 7 mandatory
₹500
GE SHILLONG
₹93,240
Yes
3 Jul 2026
16 May 2026
15 Jun 2026
16 May 2026
13 Jun 2026
30 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of cement concrete( unreinforced) in ground floors n. exc 15 cm thick below or above ground level complete all as specified and directed. | 20.31 | Cum | - | - |
| 2 | Demolition of precast cement concrete block built in cement mortar or cement lime mortar complete all as specified and directed. | 32.37 | Cum | - | - |
| 3 | Dismantling of timber scantling 40sqcm and over in section in any position (framed) complete all as specified and directed. | 2.09 | Cum | - | - |
| 4 | Dismantling of timber fillets, nails post rafters purlins etc. under 40 sqcm in section in framed work complete all as specified and directed. | 425 | per Rm | - | - |
| 5 | Dismantling of posts or struts ( wood, steel, RCC) embeded in concrete any section including taking out of embeded portion and making good disturbed ground complete all as specified and directed. | 10 | per Rm | - | - |
| 6 | Dismantling of plain/corrugated steel sheeting any gauge, thickness in roof covering complete all as specified and directed. | 157.62 | Sqm | - | - |
| 7 | Demoltion of read lathing single, double, inluding bottom and plaster or checken wire lathing complete all as specified and directed. | 101.88 | Sqm | - | - |
| 8 | Taking down shutters of any description exc 1sqm and n. exc. 2 sqm each complete all as specified and directed. | 2 | per leaf | - | - |
| 9 | Taking down shutters of any description n. exc 1 sqm each complete all as specified and directed. | 6 | per leaf | - | - |
| 10 | Taking down chowkhats with shutters (without taking of shutter for frames) n exc 1.5sqm complete all as specified and directed. | 2 | Each | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_857763.xls
BOQ • 0.38 MB
TENDERDOCU36.pdf
Tender Documents • 1.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .