Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance GANGYAL JAMMU | Admitted-Finance |
| 2 | Admitted-Finance HOUSING COLONY UDHAMPUR | UDHAMPUR | JAMMU AND KASHMIR | 182101 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance INDUSTRIAL ESTATE DIGIANA JAMMU | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
22 Mar 2021, 4:00 pmClosed
Executive Engineer
Executive Engineer PHE Division Akhnoor
Annual Rate contract for repair of HC pumps, Booster and submersible motors, submersible pumps and submersible pump (V-6) installed at various pumping stations in Jal Shakti (PHE) Division Akhnoor.
2021_PHE_120660_5
ENIT 136
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
10 days
Akhnoor
as per ENIT
6 documents required · 6 mandatory
₹1,000
Yes
Executive Engineer PHE Division Akhnoor
₹25,000
Yes
27 Mar 2021
17 Mar 2021
23 Mar 2021
17 Mar 2021
22 Mar 2021
17 Mar 2021
Amount
RKB make HC Pump
Repairing of pump shaft by jointing welding & turning to bearing size (upto to 5 stage)
Repairing of pump shaft by jointing welding & turning to bearing size (6 stage to 10 satge))
Repairing of pump shaft by jointing welding & turning to bearing size (Beyond 10 stage)
Providing, Fabrication & fitting of new pump shaft as per size and specification. (3 Stage Pump)
Providing, Fabrication & fitting of new pump shaft as per size and specification. (4 Stage Pump)
Providing, Fabrication & fitting of new pump shaft as per size and specification. (5 Stage Pump)
Providing, Fabrication & fitting of new pump shaft as per size and specification. (6 Stage Pump)
Providing, Fabrication & fitting of new pump shaft as per size and specification. (7 Stage Pump)
Providing, Fabrication & fitting of new pump shaft as per size and specification. (8 Stage Pump)
Providing, Fabrication & fitting of new pump shaft as per size and specification. (9 Stage Pump)
Providing, Fabrication & fitting of new pump shaft as per size and specification. (10 Stage Pump)
Providing, Fabrication & fitting of new pump shaft as per size and specification. (12 Stage Pump)
Providing, Fabrication & fitting of new pump shaft as per size and specification. (14 Stage Pump)
Providing and fitting of Brass Impeller as per sample.
Providing and fitting of C.I Impeller as per sample.
Repairing of brass Impeller
Repairing of C.I Impeller
Fabrication & fitting of neck ring.
Fabrication & fitting of diffuser bush
Fabrication of Stainless steel gland bush
Fabrication of chuck nut
Providing & Fitting of pump bowl
Repair to bearing housing by sleeve fitting & boring for bearing size
Providing of bearing housing along with side cover plate
Providing and fitting of Delivery Body
Providing and fitting of Suction Body
Providing of diffuser
Providing & Fitting of Oil seal
Replacement of ball thrust bearing-7307
Replacement of ball thrust bearing-7308
Replacement of ball thrust bearing-7309
Replacement of Roller bearing-N-307
Replacement of Roller bearing-N-308
Replacement of Roller bearing-N-309
Providing & Fitting Coupling bolts nuts & rubber bushes.
Dismantling & fitting of Pump ( 3 stage to 5 stage)
Dismantling & fitting of Pump ( 6 stage to 10 stage)
Dismantling & fitting of Pump ( Beyond 10 stage)
Providing & Fitting of heavy duty Coupling pulley set (5 inch dia)
Providing & Fitting of heavy duty Coupling pulley set (6 inch dia)
Providing & Fitting of heavy duty Coupling pulley set (7 inch dia)
Providing & Fitting of heavy duty Coupling pulley set (8 inch dia)
FNC Make
Repairing of pump shaft by jointing welding & turning to bearing size (upto to 5 stage)
Repairing of pump shaft by jointing welding & turning to bearing size (6 stage to 10 stage)
Repairing of pump shaft by jointing welding & turning to bearing size (beyond 10 stage)
Fabrication & fitting of new pump shaft as per size and specification (3 Stage)
Fabrication & fitting of new pump shaft as per size and specification (4 Stage)
Fabrication & fitting of new pump shaft as per size and specification (5 Stage)
Fabrication & fitting of new pump shaft as per size and specification (6 Stage)
Fabrication & fitting of new pump shaft as per size and specification (7 Stage)
Fabrication & fitting of new pump shaft as per size and specification (8 Stage)
Fabrication & fitting of new pump shaft as per size and specification (9 Stage)
Fabrication & fitting of new pump shaft as per size and specification (10 Stage)
Fabrication & fitting of new pump shaft as per size and specification (12 Stage)
Fabrication & fitting of new pump shaft as per size and specification (14 Stage)
Providing and fitting of Brass Impeller as per sample.
Providing and fitting of C.I Impeller as per sample.
Repairing of brass Impeller.
Repairing of C.I Impeller.
Fabrication & fitting of neck ring.
Fabrication & fitting of body bushes.
Fabrication of Stainless steel gland bushes
Fabrication of chuck nut
Providing & Fitting of pump bowl
Repair to bearing housing by sleeve fitting & boring for bearing size
Fabrication of bearing housing along with side cover plates
Providing and fitting of Delivery Body
Providing and fitting of Suction Body
Replacement of Roller bearing-N-204
Replacement of Roller bearing-N-205
Providing and fitting of diffuser.
Providing and fitting of thrust plate.
Providing & Fitting of Oil seal
Fabrication & fitting of thrust plate
Providing & Fitting Coupling bolts nuts & rubber bushes.
Dismantling & fitting of Pump (3 stage to 5 stage)
Dismantling & fitting of Pump (6 stage to 10 stage)
Dismantling & fitting of Pump (Beyond 10 stage)
Providing & Fitting of heavy duty Coupling pulley set (5 inch dia)
Providing & Fitting of heavy duty Coupling pulley set (6 inch dia)
Providing & Fitting of heavy duty Coupling pulley set (7 inch dia)
Providing & Fitting of heavy duty Coupling pulley set (8 inch dia)
KSB Make
Repairing of pump shaft by jointing welding & turning to bearing size (upto to 5 stage)
Repairing of pump shaft by jointing welding & turning to bearing size (6 stage to 10 stage)
Repairing of pump shaft by jointing welding & turning to bearing size (beyond 10 stage)
Fabrication & fitting of new pump shaft as per size and specification. ( 3 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 4 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 5 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 6 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 7 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 8 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 9 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 10 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 12 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 14 stage pump)
Providing and fitting of Brass Impeller as per sample
Providing and fitting of C.I Impeller as per sample
Repairing of brass Impeller.
Repairing of C.I Impeller.
Fabrication & fitting of neck ring.
Fabrication & fitting of spacer bushes.
Fabrication of Stainless steel gland bushes
Fabrication of chuck nut
Providing & Fitting of pump bowl
Repair to bearing housing by sleeve fitting & boring for bearing size
Providing of bearing housing along with side cover plates
Providing and fitting of Delivery Body
Providing and fitting of Suction Body
Replacement of bearing 208K with sleeve.
Replacement of bearing 307 with sleeve.
Replacement of ball thrust bearing-7309
Providing and fitting of diffuser.
Fabrication & fitting of thrust plate
Providing & Fitting of Oil seal
Providing & Fitting Coupling bolts nuts & rubber bushes.
Dismantling & fitting of Pump (3 stage to 5 stage)
Dismantling & fitting of Pump (6 stage to 10 stage)
Dismantling & fitting of Pump (Beyond 10 stage)
Providing & Fitting of heavy duty Coupling pulley set (5 inch dia)
Providing & Fitting of heavy duty Coupling pulley set (6 inch dia)
Providing & Fitting of heavy duty Coupling pulley set (7 inch dia)
Providing & Fitting of heavy duty Coupling pulley set (8 inch dia)
Mather Platt make
Repairing of pump shaft by jointing welding & turning to bearing size (upto to 5 stage)
Repairing of pump shaft by jointing welding & turning to bearing size (6 stage to 10 stage)
Repairing of pump shaft by jointing welding & turning to bearing size (beyond 10 stage)
Fabrication & fitting of new pump shaft as per size and specification. ( 3 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 4 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 5 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 6 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 7 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 8 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 9 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 10 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 11 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 12 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 14 stage pump)
Providing and fitting of Brass Impeller as per sample
Providing and fitting of C.I Impeller as per sample
Repairing of brass Impeller.
Repairing of C.I Impeller.
Fabrication & fitting of neck ring.
Fabrication & fitting of spacer bushes.
Fabrication of Stainless steel gland bushes
Fabrication of chuck nut
Providing & Fitting of pump bowl
Repair to bearing housing by sleeve fitting & boring for bearing size
Providing of bearing housing along with side cover plates
Providing of oil cooled brass bush
Providing and fitting of Delivery Body
Providing and fitting of Suction Body
Replacement of bearing-306 Nu
Replacement of bearing-307 Nu
Providing and fitting of diffuser.
Fabrication & fitting of thrust plate
Providing & Fitting of Oil seal
Providing & Fitting Coupling bolts nuts & rubber bushes.
Dismantling & fitting of Pump (3 stage to 5 stage)
Dismantling & fitting of Pump (6 stage to 10 stage)
Dismantling & fitting of Pump (Beyond 10 stage)
Providing & Fitting of heavy duty Coupling pulley set (5 inch dia)
Providing & Fitting of heavy duty Coupling pulley set (6 inch dia)
Providing & Fitting of heavy duty Coupling pulley set (7 inch dia)
Providing & Fitting of heavy duty Coupling pulley set (8 inch dia)
Booster and Submersible Motors
Repairs to V-6 submersible motor by rotor shaft turning & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of Stud with nuts in place of damaged studs as per requirement, Circlip lock-2nos, Fitting of motor &coupled with pump & testing in the test pit.
Repairs to V-6 submersible motor by rotor shaft turning & polishing, Fabrication & fitting of bushes in bush housing-2set. Repairs to thrust pad 01 set. P/F of Stud with nuts in place of damaged studs as per requirement, Circlip lock-2nos, Fitting of motor &coupled with pump & testing in the test pit.
Repairs to V-8 submersible motor by rotor shaft turning & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of Stud with nuts in place of damaged studs as per requirement, Circlip lock-2nos, Fitting of motor &coupled with pump & testing in the test pit.
Repairs to submersible motor (V-8) by rotor shaft turning & polishing, Fabrication & fitting of bushes in bush housing-2set. Repairs to thrust pad 01 set. P/F of Stud with nuts in place of damaged studs as per requirement, Circlip lock-2nos, Fitting of motor &coupled with pump & testing in the test pit.
Repair to submersible Motor (V-6) by extraction of broken copper strips from rotor than P/F of new copper strips (01 No.)& welding of the rotor, turning & finishing. Also repair to rotor end by rebuilding, turning & finishing.
Repair to submersible Motor (V-8) by extraction of broken copper strips from rotor than P/F of new copper strips (01 No.)& welding of the rotor, turning & finishing. Also repair to rotor end by rebuilding, turning & finishing.
Repairs to V-6 submersible motor by rotor shaft turning & polishing, Fabrication & fitting of bushes in bush housing-2set.Fitting of motor &coupled with pump & testing in the test pit.
Repairs to V-8 submersible motor by rotor shaft turning & polishing, Fabrication & fitting of bushes in bush housing-2set.Fitting of motor &coupled with pump & testing in the test pit.
Repairs to V-6 submersible motor by way of P/F of thrust pad 01 set. P/F of Stud with nuts in place of damaged studs as per requirement, Circlip lock-2nos, Fitting of motor &coupled with pump & testing in the test pit.
Repairs to V-8 submersible motor by way of P/F of thrust pad 01 set. P/F of Stud with nuts in place of damaged studs as per requirement, Circlip lock-2nos, Fitting of motor &coupled with pump & testing in the test pit.
Repair 25 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor.
Repair 25 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor.
Repair 25 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor.
Repair 40 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor.
Repair 40 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor.
Repair 40 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor.
Repair 50 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor.
Repair 50 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor.
Repair 50 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor.
Repair 60 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor.
Repair 60 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor.
Repair 60 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor.
Repair 100 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor.
Repair 70 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor.
Repair 100 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor.
Repair 100 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor.
Repair to 25 HP motor by way of replacement of bearing at one end and assembling of motor.
Repair to 40 HP motor by way of replacement of bearing at one end and assembling of motor.
Repair to 50 HP motor by way of replacement of bearing at one end and assembling of motor.
Repair to 60 HP motor by way of replacement of bearing at one end and assembling of motor.
Repair to 100 HP motor by way of replacement of bearing at one end and assembling of motor.
Repair to 25 HP motor by way of replacement of bearing at DE & NDE and assembling of motor.
Repair to 40 HP motor by way of replacement of bearing at DE & NDE and assembling of motor.
Repair to 50 HP motor by way of replacement of bearing at DE & NDE and assembling of motor.
Repair to 60 HP motor by way of replacement of bearing at DE & NDE and assembling of motor.
Repair to 100 HP motor by way of replacement of bearing at DE & NDE and assembling of motor.
Repair 75 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor.
Repair 75 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor.
Repair 75 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor.
Repair to 75 HP motor by way of replacement of bearing at DE & NDE and assembling of motor.
Repair to 75 HP motor by way of replacement of bearing at one end and assembling of motor.
Submersible
Providing of Adaptor for V-6 Submersible motor
Providing of Adaptor for V-8 Submersible motor
Fabrication & providing of MS Clamp 3"
Fabrication & providing of MS Clamp 4"
Fabrication & providing of MS Shling for Gantry Post
Fabrication & providing of 80 mm dia. flanged adaptor with threading at other side
Fabrication & providing of 65 mm dia. flanged adaptor with threading at other side
Fabrication & providing of 125 mm dia. flanged adaptor with threading at other side
Fabrication & providing of 150 mm dia. flanged adaptor with threading at other side
Fabrication & providing of 100 mm dia. flanged adaptor with threading at other side
Fabrication & providing of 50 mm dia. flanged adaptor with threading at other side
Submersible Pump (V-4)
Fabrication/Providing of Coupling pulley with cotter for V-4 Submersible motor
Repairing of pump shaft by welding, turning, polishing and making key ways.
Fabrication of pump shaft as per specification.
Fabrication/Providing of New Impeller
Fabrication/Providing of New PVC A-Grade Impeller with body set
Repair to impeller
Fabrication/Providing of Neck Ring
Fabrication/Providing of Body Bushes
Fabrication/Providing of Guide Bush
Fabrication/Providing of Spacer Bush
Fabrication/Providing of Cotter
Providing and fitting of body cover as per specification
Fabrication/Providing of Pump Body
Fabrication/Providing of Suction Body
Labour Charges for dismantling and fitting of pump
Submersible Pump (V-8)
Providing of Coupling pulley with cotter for V-8 Submersible motor
Repairing of pump shaft by welding, turning, polishing and making key ways.
Fabrication of pump shaft
Fabrication of Neck Ring
Fabrication/Providing of New Impeller
Repair to impeller
Fabrication of Body Bushes
Fabrication of Guide Bush
Fabrication of Spacer Bush
Providing of Cotter
Fabrication of Pump Body
Providing of Suction Body
Providing of NRV with adaptor
Labour Charges for dismantling and fitting of pump
Submersible Pump (V-6)
Providing of Coupling pulley with cotter for V-6 Submersible motor
Repairing of pump shaft by welding, turning, polishing and making key ways.
Fabrication of pump shaft as per specification (upto 5 stage)
Fabrication of pump shaft as per specification (6 stage to 10 stage)
Fabrication of pump shaft as per specification (11 stage to 15 stage)
Fabrication of pump shaft as per specification (16 stage to 20 stage)
Fabrication of pump shaft as per specification (beyond 20 stage)
Fabrication/Providing of New Impeller
Fabrication/Providing of New PVC A-Grade Impeller
Repair to impeller
Fabrication/Providing of Neck Ring
Fabrication/Providing of Body Bushes
Fabrication/Providing of Guide Bush
Fabrication/Providing of Spacer Bush
Fabrication/Providing of Cotter
Fabrication/Providing of Pump Body
Fabrication/Providing of Suction Body
Dismantling & fitting of Pump (upto 5 stage)
Dismantling & fitting of Pump (6 stage to 10 stage)
Dismantling & fitting of Pump (11 stage to 15 stage)
Dismantling & fitting of Pump (Beyond 15 stage)
M/S V.N ENGG WORKS
M/S UTTAM ENGINEERS
TRIKUTA ELECTRICAL AND MECHANICAL WORKS
M/S PERFECT ENGINEERING WORKS
HITECH MECHNICALS
VK Mechanical Works
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .