Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹9.6 L+₹69,224.78 (7.80%)Rejected-AOC KUDIYATHAM TALUK VELLORE DISTRICT | VELLORE | TAMIL NADU | 632001 | L2 | Rejected-AOC Rejected | |
| 3 | L3₹9.7 L+₹87,036.14 (9.81%)Rejected-AOC | L3 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | K.Rajini L2 | V.UDAYAKUMAR L3 | M/S SAI RAM ENTERPRISES L1 |
|---|---|---|---|---|---|---|
| 1.00VELLORE DISTRICT GUDIYATHAM BLOCK Construction of New 10000 litre OHT (7.5 Mtrs. Stage) with Pipe Line at V.Mottur, Theppallavaripalli Eri Kudi eruppu in Veerichettipalli Panchayat for Gudiyatham Block. Package No.6 | ||||||
| 2.00 | Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 32 | cum | 294 ₹9,408 | 212 ₹6,784 | 200 ₹6,400 Lowest |
| 3.00 | Supplying and filling foundation and basement with filling sand in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification | 1.6 | cum | 1,848 ₹2,956.8 | 1,650 ₹2,640 | 1,000 ₹1,600 Lowest |
| 4.00 | Cement conrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc ocmplete for bed blocks for 10 cum | 2.4 | cum | 5,460 ₹13,104 | 4,950 ₹11,880 | 4,000 ₹9,600 Lowest |
| 5.00RCC1:1.5:3 mix using 20mm HBGS and 10mm HBS excluding the cost of reinforcement, centering and shuttering but including the cost of mixing placing vibrating of concrete curing and finishing etc., complete as directed by the officers. | ||||||
| 6.00 | below GL 1.50m to 4.50m | 2.48 | Cum | 7,980 ₹19,790.4 | 8,000 ₹19,840 | 7,000 ₹17,360 Lowest |
| 7.00 | below GL 0m to 1.50m | 1.03 | Cum | 7,980 ₹8,187.48 | 8,000 ₹8,208 | 7,000 ₹7,182 Lowest |
| 8.00 | above GL 0m to 4.50m ht. | 2.02 | Cum | 7,980 ₹16,087.68 Lowest | 8,000 ₹16,128 | 8,000 ₹16,128 |
| 9.00 | above GL 4.51.to 7.32 ht. | 2.63 | Cum | 8,820 ₹23,223.06 | 8,000 ₹21,064 Lowest | 8,500 ₹22,380.5 |
| 10.00 | above GL 7.33.to 10.98 ht. | 4.72 | Cum | 9,660 ₹45,585.54 | 8,000 ₹37,752 Lowest | 9,000 ₹42,471 |
Tender Value
Refer Docs
EMD Value
₹23,000
Closing Date
13 Oct 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BLOCK DEVELOPEMETN OFFICER (BP)
PANCHAYAT UNION OFFICE, GUDIYATHAM BLOCK
Construction of New 10000 litre OHT (7.5 Mtrs. Stage) with Pipe Line at V.Mottur, Theppallavaripalli Eri Kudi eruppu in Veerichettipalli Panchayat for Gudiyatham Block
2026_RDTN_709270_1
A3 / 2582 / 2026
Open Tender
Civil Works
Item Rate
GUDIYATHAM
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹23,000
Yes
11 Nov 2026
30 Sept 2026
13 Oct 2026
30 Sept 2026
13 Oct 2026
30 Sept 2026
150 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | VELLORE DISTRICT GUDIYATHAM BLOCK Construction of New 10000 litre OHT (7.5 Mtrs. Stage) with Pipe Line at V.Mottur, Theppallavaripalli Eri Kudi eruppu in Veerichettipalli Panchayat for Gudiyatham Block. Package No.6 | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 32 | cum | - | - |
| 3 | Supplying and filling foundation and basement with filling sand in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification | 1.6 | cum | - | - |
| 4 | Cement conrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc ocmplete for bed blocks for 10 cum | 2.4 | cum | - | - |
| 5 | RCC1:1.5:3 mix using 20mm HBGS and 10mm HBS excluding the cost of reinforcement, centering and shuttering but including the cost of mixing placing vibrating of concrete curing and finishing etc., complete as directed by the officers. | - | - | - | - |
| 6 | below GL 1.50m to 4.50m | 2.48 | Cum | - | - |
| 7 | below GL 0m to 1.50m | 1.03 | Cum | - | - |
| 8 | above GL 0m to 4.50m ht. | 2.02 | Cum | - | - |
| 9 | above GL 4.51.to 7.32 ht. | 2.63 | Cum | - | - |
| 10 | above GL 7.33.to 10.98 ht. | 4.72 | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_852311.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Tendernotice_2.pdf
PDF • 0.81 MB
BOQ_852311.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .