| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.3 LAccepted-AOC | ₹14.3 L | L1 | Accepted-AOC 1st Lowest |
| 2 | L2₹14.3 LRejected-Finance | ₹14.3 L | L2 | Rejected-Finance disqualified in the Lottery Process |
| 3 | L2₹14.3 LRejected-Finance AT SARA P O BADIGAON PS KASHINGAGAR DIST GAJAPATI | GAJAPATI | ₹14.3 L | L2 | Rejected-Finance disqualified in the Lottery Process |
| 4 | L2₹14.3 LRejected-Finance AT PO KHARLINGI VILLAGE BONDHUGUDA PS GUNUPUR DIST RAYAGADA | GUNUPUR | RAYAGADA | ODISHA | ₹14.3 L | L2 | Rejected-Finance disqualified in the Lottery Process |
Tender Value
₹14.3 L
EMD Value
₹14,334
Closing Date
5 Feb 2026, 5:00 pmClosed
Block Development Officer, Gunupur
Block Development Officer, Gunupur
Construction of Additional Class Room Building at Jaltar (Elementary), Gunupur Block
2026_PZPGN_124878_1
BDO Gunupur/03/2025-26
Open Tender
Civil Works - Buildings
150 days
Jaltar
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹14,334
Yes
13 May 2026
22 Jan 2026
6 Feb 2026
22 Jan 2026
5 Feb 2026
22 Jan 2026
22 Jan 2026 - 30 Jan 2026
Earthwork in excavation of foundation in all kinds of soil within 50 mtrs initial lead and 1.5 mtrs initial lift including levelling and dressing the bed etc
Filling F&P with sand well watered and rammed including cost, cinveyance of all material and labour etc complete as per the direction of EIC
P.C.C. (1:3:6) to using 40 mm size hard granite metal including cost, conveyance of all material and labour etc complete as per the direction of EIC
P.C.C. (1:3:6) to using 40 mm size hard granite metal including cost, conveyance of all material and labour etc complete as per the direction of EIC
R.C.C M20 for column base & plinth bean using 12 mm size BHG chips including centering, shuttering etc. cost, conveyance of all material and labour etc complete as per the direction of EIC
R.C.C M20 for Lintel Band & Door window sill band using 12 mm size BHG chips including centering, shuttering etc. cost, conveyance of all material and labour etc complete as per the direction of EIC
Rigid smooth centering for RCC works inclding false work and dismanteling them after casting including cost of materials complete in ground floor RCC foundation, plinthband and footing base of coumn
RCC coumn from PL to RL
Lintel Beam Long Beam
Roof Beam & Middle Beam
Slab & Chajja
Brick work with Flyash Brick (23x11x8cm) masonary CM (1:6) in super structure with splay cutting circular moulding etc including cost, conveyance of all material and labour etc complete as per the direction of EIC
Cutting, bending, binding of MS rod and laying in position, including cost of binding wires, conveyance of all material and labour etc complete as per the direction of EIC
12 MM thick CP with CM (1:6) over brick, including cost, conveyance of all material and labour etc complete as per the direction of EIC
16 MM thick CP with CM (1:6) over brick, including cost, conveyance of all material and labour etc complete as per the direction of EIC
Mild steel door, and windows including cost conveyance of all material etc completed as per the direction of EIC
Supplying, fitting and fixing of two track UPVC sliding windows of approved make with 6 mm thick glass of aapproved quality complete with frame shutter & all fittings of fixtures including cost conveyance of all material etc complete as per the direction of EIC
Fitting, fixing of door & windows including fixture & fittings etc as per the instruction of EIC
Painting 2 coats over a coat of primer including cost of paints, labour & sundries etc complete
Fixing floor tiles
Finishing walls with plastic emulsion paint of approved shade on ew work 2 coats to gives asneven shade including cost of paint etc complete
Wall painting two coats with 100% acrylic emusion paint (1st quality) exterior grade of approved made and shade manufactured by reputed manufacture like nerolac/Asian/Berger/Dulax or equivalent to make an even finished surface over a coat of primer with water bond cement primer in all heights with all scaffolding and stagging charges including cost, conveyance taxes of all materials cost of all labour ZT&P sundries etc as required for the work
Finishing wall surface of walls with Acrylic wall putty (water based) of approved make
Provision for Electrification
Provision of handrails for disabled children
Display Board
Black Board 8'00" x 4'00" size
Moral Painting
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_576963.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.56 MB
BOQ_576963.xls
BOQ • 0.26 MB
DTCN.pdf
Tender Documents • 2.55 MB
Download all tender documents and submit your bid