Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
6 Oct 2026, 3:00 pm
ASSISTANT COMMISSIONER, WEST ZONE.
WESTZONE, COIMBATORE CORPORATION
Construction of store room and toilet at Gents night shelter, west Arokiasamy st ward no 71
2026_MAWS_705833_29
E4/WESTZONE/2026-27
Open Tender
Civil Works
Works
90 days
WESTZONE, COIMBATORE CORPORATION
As per tender document attached
4 documents required · 4 mandatory
₹0
₹10,000
19 Sept 2026
19 Sept 2026
7 Oct 2026
19 Sept 2026
6 Oct 2026
19 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth workexcavationforfoundationinHardstiffclay,stiffblackcotton,hardredearth,shalesmurram,gravel,stoneyearth and earth mixed withsmall size boulders SS.20B and Sand, silt or other loosesoil,wetsand,orsilt not under water, light black cotton soil, sandy loam ordinary soil andto full depth as may be directed except in hardrock requiring blastinginclusive of shoring shuttering and baling out water and cleaning andlevelling the site etc.,complete | 6.5 | m3 | - | - |
| 2 | Plain Cement Concrete 1:4:8 (one part of cement, four part of CrushedStone Sand (M- Sand) and Eight part of coarse aggregates) using 40mmsize ISS HBG metal including cost and conveyance of all materials to site
and including for the mixing, laying and labour charges and all incidentialcharges such as water providing etc., complete as per standardspecification | 7.72 | m3 | - | - |
| 3 | Supplying and erecting in the position of centering for sides and soffits including necessary supports and strutting with all cross bracings using mild steel sheet boarding etc., completed (CBE DATA 24-25 P-34) | 4.5 | m2 | - | - |
| 4 | Supply and Fabrication of RTS Rods in Various Dia. Including Cutting, Bending and Tying with all Labour Charges Etc., Complete.(CBE DATA 24-25 P-38) | 5 | Qtl | - | - |
| 5 | Reinforced Cement concrete 1:1.5 :3 (one cement, one and half M.sand& three course aggregate) using 20mm gauge hand broken/ and brokengranite stone for all RCC items of works excluding centering shuttering
and cost of reinforcement but including curing etc.,complete and alsoincluding fixing fan clamps and fixtures in rcc works wherevernecessary as directed by departmental officer etc., complete. | 3.5 | m3 | - | - |
| 6 | Brick work in cement mortar 1:5 mix using Fly Ash bricks of230x110x70mm (8 3/4" x 41/4" x 23/4") including cost of materials andlabour charges etc., as per standard specification | 30 | m3 | - | - |
| 7 | Plastering for brickwork and concrete surfaces using cement mortar 1:5 (One part of cement, five parts of sand by volume) thickness 12mm (average) for all internal/external surfaces like superstructure, rainwater ducts, elevation (CBE DATA 24-25 P-114) | 291 | m2 | - | - |
| 8 | Supply and Filling with Well gravel including cost and conveyance of alll materials and all labour charges (Road Data -2021-22 P-1) | 24 | m3 | - | - |
| 9 | Painting with plastic emulsion paint in two coats over a base coat of Primer in approved colour and quality etc., complete.(CBE DATA 24-25 P-120) | 291 | m2 | - | - |
| 10 | Paving the floor with design Antiskirt ceramic tiles (colour and shade asdirected) of size 305 mm x 305mm x 6 mm in all floors over a base layerof cement mortar 1:3 (One part of Cement and Three part of Plastering
Sand (P- Sand)), 20mm thick laid in-situ and pointed with same colouredcement | 2 | m2 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.89 MB
Building.pdf
Tender Documents • 0.88 MB
CONDITIONS.pdf
Additional Documents • 0.26 MB
BOQ_848612.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .