| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-Finance | ₹8.5 L | L1 | Accepted-Finance Rates of Bidder are below estimated rates and also 1st lowest among two. |
| 2 | L2₹9.0 LRejected-Finance | ₹9.0 L | L2 | Rejected-Finance Rates of Bidder are below estimated rates and also higher among two. |
| Sl No | Description | Qty | Unit | KAZIM KHAN L1 | M/S AZAM KHAN CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in cutting or in embankment in ordinary Soil, excavation to be in the form of regular pits and earth Work in embankment to be in 20 cm layers including ramming and dressing the surface to the required levels and slops and also including 1.50meter lift and 30 meter lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank within 30-meter distance as directed by Engineer-in-charges.
In Distributaries, Drains, Escape and minors by manual or by Hydraulic/ Mechanical excavator. | 99.78 | Cum | 65 ₹6,485.70 | 70 ₹6,984.60 |
| 2.00 | Earth work in filling in ordinary soil in 20 cm layers with manual compaction including ramming and dressing the surface to the required levels, slopes i/c all lead & Lifts, all material, labour and T&P etc. complete. the earth from cutting to be used in making embankment as directed by Engineer - in - charge. | 3,499.02 | Cum | 242 ₹8.5 L | 256 ₹9.0 L |
Tender Value
₹9.2 L
EMD Value
₹91,500
Closing Date
25 Apr 2026, 12:00 pmClosed
RAJEEV KUMAR EXECUTIVE ENGINER
O/O EXECUTIVE ENGINEER MADHYA GANGA CANAL CONSTRUCTION DIVISION-9 SAMBHAL
EARTH WORK FOR CONSTRUCTION OF THARESA MINOR FROM KM 3.856 TO KM 4.556.
2026_UPIDC_1128915_3
01/EE/2025-26
Open Tender
Civil Works - Canal
60 days
THARESA JAYSINGH SAMBHAL
PLEASE REFER TENDER DOCUMENT
3 documents required · 3 mandatory
₹766
Yes
₹91,500
SAMBHAL
5 May 2026
20 Apr 2026
25 Apr 2026
20 Apr 2026
25 Apr 2026
20 Apr 2026
21 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in cutting or in embankment in ordinary Soil, excavation to be in the form of regular pits and earth Work in embankment to be in 20 cm layers including ramming and dressing the surface to the required levels and slops and also including 1.50meter lift and 30 meter lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank within 30-meter distance as directed by Engineer-in-charges.
In Distributaries, Drains, Escape and minors by manual or by Hydraulic/ Mechanical excavator. | - | Cum | - | - |
| 2 | Earth work in filling in ordinary soil in 20 cm layers with manual compaction including ramming and dressing the surface to the required levels, slopes i/c all lead & Lifts, all material, labour and T&P etc. complete. the earth from cutting to be used in making embankment as directed by Engineer - in - charge. | - | Cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.69 MB
Tendernotice_2.pdf
PDF • 3.54 MB
BOQ_2126864.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid