Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹69.4 LAccepted-AOC | ₹69.4 L Quoted ₹81.9 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹91.8 LRejected-Finance | ₹91.8 L | L2 | Rejected-Finance Not L1 Bidder |
| Sl No | Description | Qty | Unit | Chand Collection L2 | joy developments L1 |
|---|---|---|---|---|---|
| 10.00 | Schedule Items Civil works | 1 | Nos | 22.11 ₹68.7 L | 7.9 ₹60.7 L |
| 20.00 | Non Schedule items Civil Works | 1 | Nos | 22.11 ₹1.0 L | 9.6 ₹91,715.59 |
| 30.00 | Non schedule items Boring work | 1 | Nos | 22.11 ₹2.6 L | 10.6 ₹2.3 L |
| 40.00 | Non Schedule items High Mast work | 1 | Nos | 22.11 ₹8.3 L | 11.6 ₹7.6 L |
| 50.00 | Schedule items Electrical Works | 1 | Nos | 22.11 ₹5.5 L | 14.2 ₹5.2 L |
| 60.00 | Non-Schedule items Electrical Works | 1 | Nos | 22.11 ₹5.7 L | 11.4 ₹5.2 L |
Updated dates
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
16 Mar 2026, 11:00 amClosed
Tapas Ranjan MishraDGM(CnM)
USSC CPG-2 Naya Raipur
Construction/completion of balance works, provision of mast light and water issue at Socially and culturally important area (temple) at Kundi.
2026_NTPC_104659_1
NTPC/USSC-CPG2/9900318910
Limited
Miscellaneous Works
270 days
North Karanpura Super Thermal Power Project
2 documents required · 2 mandatory
₹0
₹1 L
5 May 2026
4 Feb 2026
17 Mar 2026
4 Feb 2026
16 Mar 2026
4 Feb 2026
4 Feb 2026 - 9 Feb 2026
Schedule Items Civil works
Non Schedule items Civil Works
Non schedule items Boring work
Non Schedule items High Mast work
Schedule items Electrical Works
Non-Schedule items Electrical Works
Scheduled Items List
BoQ_Ver3.0
Reference No: 9900318910
Bidder Name :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender.
NUMBER #
Schedule Items Civil works
DSR2023 item: 2.6.1
DSR2023 item: 2.25
DSR2023 item: 2.25A
DSR2023 item: 4.1.4
DSR2023 item: 4.1.8
DSR2023 item: 5.1.2
DSR2023 item: 5.2.2
DSR2023 item: 5.22.6
DSR2023 item: 5.22A.6
DSR2023 item: 5.9.1
DSR2023 item: 5.9.3
DSR2023 item: 5.9.5
DSR2023 item: 5.9.6
DSR2023 item: 5.9.19
DSR2023 item: 6.4.2
DSR2023 item: 6.13.2
DSR2023 item: 8.31
DSR2023 item: 9.1.3
DSR2023 item: 9.21.2
DSR2023 item: 9.48.2
DSR2023 item: 9.62.2
DSR2023 item: 9.63.1
DSR2023 item: 10.2
DSR2023 item: 10.17
DSR2023 item: 10.28
DSR2023 item: 11.37
DSR2023 item: 11.41.2
DSR2023 item: 11.55.1
DSR2023 item: 12.41.1
DSR2023 item: 12.41.2
DSR2023 item: 13.1.2
DSR2023 item: 13.2.2
DSR2023 item: 13.7.2
DSR2023 item: 13.16.1
DSR2023 item: 13.41.1
DSR2023 item: 13.44.1
DSR2023 item: 13.62.1
DSR2023 item: 13.80
DSR2023 item: 17.1.1
DSR2023 item: 17.2.1
DSR2023 item: 17.4.1
DSR2023 item: 17.7.2
DSR2023 item: 17.16A
DSR2023 item: 17.9.1
DSR2023 item: 17.32.2
DSR2023 item: 18.7.1
DSR2023 item: 18.7.2
DSR2023 item: 18.7.3
DSR2023 item: 18.48A
DSR2023 item: 18.54.1
DSR2023 item: 18.54.2
DSR2023 item: 18.55.1
DSR2023 item: 18.58.1.1
DSR2023 item: 18.9.5
DSR2023 item: 19.33
DSR2023 item: 21.1.1.1
DSR2023 item: 21.1.2.1
DSR2023 item: 21.3.1
DSR2023 item: 21.16.1
Non Schedule items Civil Works
NS -1 (75 mm dia Wall thick 3.2 to 3.8)
NS -2 (110 mm dia Wall thick 3.2 to 3.8)
NS -3 ( UPVC floor trap)
Non schedule items Boring work
NS -1 Boring/drilling bore well
NS -2 SUBMERSSIBLE CABLE COPPER CONDUCTO
NS -3 AC MOTOR STARTERS
NS -4 S&I of 2 HP submersible pump
Non Schedule items High Mast work
NS -1 Supply 30m Lighting High Mast
NS -2 Supply : Material for High Mast
NS-3 Construction of foundation for High
NS-4 E & C of 30m Lighting High Mast
NS-5 Erection of earthing station for LM
Schedule items Electrical Works
DSR-2022 Item:1.3.3
DSR-2022 Item:1.50.1
DSR-2022 Item:1.7.2
DSR-2022 Item:1.7.3
DSR-2022 Item:1.17.12
DSR-2022 Item:1.24.1
DSR-2022 Item:1.24.4
DSR-2022 Item:1.25
DSR-2022 Item:1.26
DSR-2022 Item:1.31
DSR-2022 Item:1.32
DSR-2022 Item:1.33
DSR-2022 Item:1.41
DSR-2022 Item:1.44
DSR-2022 Item:2.18
DSR-2022 Item:2.4.3
DSR-2022 Item:2.10.1
DSR-2022 Item:2.15.3
DSR-2022 Item:2.13.2
DSR-2022 Item:7.6.1
DSR-2022 Item:5.2
Non-Schedule items Electrical Works
Supply of 1200mm length,1x36 W,LED
Supply of 600mm length,1x10-12W,LED type
Supply of Ceiling fan with 1400mm sweep,
Supply of Bollard Light model: BGBOS 6
Supply of LED Bush and Spike Lights BG
Supply of Pendant Light along with la
Supply of 18W LED lamp along with ceil
Supply of 4CX16 sqmm Al conductor, P
Supply of 200mm Exaust Fan along with
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.35 MB
TD9900318910.rar
Tender Documents • 27.81 MB
BOQ_107890.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid