Loading…
Loading…
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
31 Aug 2026, 12:30 pm3d left
Execuitve Engineer JS PHE Division Chadoora
Execuitve Engineer JS PHE Division Chadoora
Construction of Chamber Washout drain at Futlipora SR and RCC Jacketing of bridge pillar at Nagbal pipe Crossing
2026_PHE_321208_6
Detailed E NIT No 11/JS/PHED/CHADOORA of 2026-27
Open Tender
Civil Works
Percentage
30 days
Chararisharief Chadoora
Please refer Tender documents.
5 documents required · 5 mandatory
₹300
Yes
Execuitve Engineer JS PHE Division Chadoora
₹6,000
Yes
17 Aug 2026
17 Aug 2026
31 Aug 2026
18 Aug 2026
31 Aug 2026
18 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 1 meter from cutting edge: In all kinds of soils | 11.45 | Cum | 479.3 | ₹5,487.99 |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 32.76 | Cum | 187.3 | ₹6,135.95 |
| 3 | Dumping stone excluding cost of stones in Horizontal on level | 1.64 | Cum | 237.9 | ₹390.16 |
| 4 | Supply of stone boulders (Nallah) nominal size 225 mm including all types of carriages | 0.84 | Cum | 1,450 | ₹1,218 |
| 5 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 0.95 | Cum | 5,202.9 | ₹4,942.75 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 13.72 | Cum | 7,104.35 | ₹97,471.68 |
| 7 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 3.48 | Cum | 9,395.7 | ₹32,697.04 |
| 8 | 12mm Cement plaster finished with a floating coat of neat cement of mix: 1 : 4 ( 1 cement : 4 fine sand) | 29.1 | Sqm | 353.1 | ₹10,275.21 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for:
Foundations, footings, bases for columns | 14.76 | Sqm | 286.35 | ₹4,226.53 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for:
Retaining walls, return walls, walls (any thickness) including attached pilasters
buttresses, plinth and string course fillets, kerbs andsteps etc. | 15.6 | Sqm | 628.95 | ₹9,811.62 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
BOQ_1071925.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].