| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹24.5 LAdmitted-Finance | -0.05% | ₹24.5 L | L1 | Admitted-Finance |
| 2 | L2₹24.5 L+₹490.91 (0.02%)Admitted-Finance GRAM NANEHA ASHA TEHSIL DEVBAND DISTRICT SAHARANPUR MOBILE 9927733433 | -0.03% | ₹24.5 L+₹490.91 (0.02%) | L2 | Admitted-Finance |
| 3 | L3₹24.5 L+₹736.36 (0.03%)Admitted-Finance | -0.02% | ₹24.5 L+₹736.36 (0.03%) | L3 | Admitted-Finance |
Tender Value
₹24.6 L
EMD Value
₹1.3 L
Closing Date
17 Sept 2026, 2:00 pmClosed
PO DUDA BIJNOR
O/O PO DUDA BIJNOR
VILL DAYALWALA KE PRIMERY SCHOOL MAI MARDEN CLASS ROOM KA NIRMAN
2026_SUDA_1184491_7
509
Open Tender
Civil Works
Percentage
BIJNOR
PLEASE REFER TENDER DOCUMENT
2 documents required · 2 mandatory
₹854
PO DUDA BIJNOR
₹1.3 L
18 Sept 2026
11 Sept 2026
17 Sept 2026
11 Sept 2026
17 Sept 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W in cutting or in embankment in ordinary soil including ramming and dressing the surface to required levels and slopes.excavated earth carted from distance up to 5.0Km as per direction of Er. I/c S.I.No. 253(a)+ chapter 4 S.I.No. 261 | 480 | M3 | 281.5 | ₹1,35,120 |
| 2 | Concrete with 4cm gauge approved Stone ballast, coarse sand and cement in proportion of 8:4:1 including supply of all materials labour and completion of the work .S I no 281 | 14.03 | M3 | 6,850 | ₹96,105.5 |
| 3 | R.C.C. work with cement C-sand and stone grit in 1:1.5:3 in lintels etc excluding s/o rainforcement and its binding but including fixing binding centering and shuttering including supply of all materials labourand T&P etc required for proper completion of the work as per S.I.No.-288 | 2.52 | M3 | 8,025 | ₹20,223 |
| 4 | M 150 Class Brick Work 1:4 Cement and approved Coarse sand of 2.25 fm in foundation and plinth including supply of all materials, labour Taxes and T&P etc required for proper completion of work S.I. No. 305 | 37.26 | M3 | 5,110 | ₹1,90,398.6 |
| 5 | Concrete with 2cm gauge approved Stone ballast, coarse sand and cement in proportion of 4:2:1 including supply of all materials labour and completion of the work .S I no 279a | 12.29 | M3 | 7,600 | ₹93,404 |
| 6 | 12 MM thick Plaster with one part of cement and four part of approved Corse Sand Mortar including supply of all materials labour and completion of the work S.I.no 584. | 324 | M2 | 204 | ₹66,096 |
| 7 | M.S. or Iron work in plain work such as R.C.C. (1: 2 : 4 ) or R.B. work as per complete S.I.no.502(b) | 2.47 | Qtl | 7,050 | ₹17,432.89 |
| 8 | Mild Steel or Iron work in Febrication of gate S.I NO.502C. | 7.46 | qtl | 8,100 | ₹60,397.65 |
| 9 | Providing Wall Putty on new surface with approvel quality material of berjer/j.k./birla etc make 2 coatesi/c all etc complete chapter no.15 New Item -11 | 530.26 | M2 | 58 | ₹30,755.08 |
| 10 | Finished wall with water proof weather coat of Apex super paint of app.make and quality on new work with two coat to given on surface and shade over one coat priming surface with water proof putty including supply of all material i/c aall complete .Chapter No. 15 new item no 8+9 | 530.26 | M2 | 84 | ₹44,541.84 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.19 MB
BOQ_2228760.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .