| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.3 CrAdmitted-Finance | -40.39% | ₹3.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.8 Cr+₹51.3 L (15.6%)Admitted-Finance | -31.11% | ₹3.8 Cr+₹51.3 L (15.6%) | L2 | Admitted-Finance |
| 3 | L3₹4.6 Cr+₹1.3 Cr (40.9%)Admitted-Finance | -16.00% | ₹4.6 Cr+₹1.3 Cr (40.9%) | L3 | Admitted-Finance |
Tender Value
₹5.5 Cr
EMD Value
₹11.0 L
Closing Date
12 Sept 2026, 4:00 pmClosed
Executive Engineer RNb Dalgate DIvision Sgr
Executive Engineer RNb Dalgate DIvision Sgr
Construction of Transit Accommodation at Zewan Srinagar (Finishing work of remaining blocks, Road protection and allied works Phase 3rd )
2026_PWDJK_323445_1
Nit-50 of RNB/6716-19/2026-27 dtd.03-09-2026
Open Tender
Civil Works
Percentage
30 days
zewan Srinagar
as per Nit/SBD
8 documents required · 8 mandatory
₹8,500
Executive Engineer RNb Dalgate DIvision Sgr
₹11.0 L
Superintending Engineer RNB Circle Sgr South
15 Sept 2026
4 Sept 2026
14 Sept 2026
4 Sept 2026
12 Sept 2026
6 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | 271.06 | Cum | 158.73 | ₹43,025.35 |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. Ordinary Rock. | 90.35 | Cum | 332.88 | ₹30,075.71 |
| 4 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: 2.9.1 All kinds of soil : | 81.37 | Cum | 217.67 | ₹17,711.81 |
| 5 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: Ordinary Rock. | 27.12 | Cum | 418.22 | ₹11,342.13 |
| 6 | P/L stone soling (Hand packed) in trenches incl. ramming, dressing, watering etc. incl. all leads, lifts and carriage upto site of work complete. | 26.17 | Cum | 805.08 | ₹21,068.94 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 53.08 | Cum | 4,858.98 | ₹2,57,914.66 |
| 8 | Providing and laying in position machine batched and machine mixed design mix M-25grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in- charge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. All works upto plinth level. | 16.98 | Cum | 6,797.54 | ₹1,15,422.23 |
| 9 | Providing and laying in position machine batched and machine mixed design mix M-25grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in- charge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. All works above plinth level upto floor V level | 4.3 | Cum | 7,976.31 | ₹34,298.13 |
| 10 | Add or deduct using more or less cement in the items of design mix over and above the specified cement content therein. | 21.29 | Qtl | 797.46 | ₹16,977.92 |
| 11 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement: 1½ coarse sand: 3 graded stone aggregate 20 mm nominal size). | 85.46 | Cum | 6,600.34 | ₹5,64,065.06 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.63 MB
Tendernotice_2.pdf
PDF • 1.43 MB
BOQ_1088441.xls
BOQ • 0.45 MB
ExtensionNit50transit.pdf
PDF • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .