| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAccepted-AOC | ₹4.3 L Quoted ₹3.7 L | L1 | Accepted-AOC Technically and financially eligible L1 Bidder. |
| 2 | L2₹3.9 L+₹27,759.40 (7.59%)Rejected-Finance WARD NO 22 DADARKHURD DADAR NALA KORBA CG 495677 | KORBA | CHHATTISGARH | 495677 | ₹3.9 L+₹27,759.40 (7.59%) | L2 | Rejected-Finance Not L1 Bidder |
| 3 | L3₹4.7 L+₹1.0 L (28.3%)Rejected-Finance | ₹4.7 L+₹1.0 L (28.3%) | L3 | Rejected-Finance Not L1 Bidder |
Tender Value
₹8.3 L
EMD Value
₹10,400
Closing Date
17 Jul 2023, 5:00 pmClosed
STAFF OFFICER (CIVIL), KORBA AREA
Office of the General Manager, South Eastern Coalfields Limited, CIVIL DEPARTMENT, KORBA AREA KORBA- 495 677(CG), Mo-9425533108/ 7587390644
Shifting of Boundary wall of Excavation Workshop, Manikpur OCP of Korba Area.
2023_SECL_282927_1
SECL/GM/KA/C/e-Tender/23-24/17 Dt. 04.07.2023
Open Tender
Civil Works - Others
Item Rate
30 days
Office of the General Manager Korba Area
As per NIT
3 documents required · 3 mandatory
₹10,400
30 Oct 2023
5 Jul 2023
19 Jul 2023
6 Jul 2023
17 Jul 2023
6 Jul 2023
6 Jul 2023 - 10 Jul 2023
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand(zone-III) : 6 graded stone aggregate 40 mm nominal size).
1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Cold twisted bars
Brick work with clay flyash brick F.P.S. (non modular), class designation 7.5 in foundation and plinth in cement mortar 1:6 ( 1 cement : 6 coarse sand )
Brick work with clay flyash F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor five level in : - Cement mortar 1:6 (1 cement : 6 coarse sand)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 20 mm nominal size)
12 mm cement plaster of mix : 1:6 (1 cement: 6 coarse sand)
Finishing walls with water proofing cement paint of required shade : New work (Two or more coats applied @ 3.84 kg/10 sqm).
Total impact of GST for the purpose of CTC
MK Associates
PURAN MAL KARSH
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_292995.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .