Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.8 LAccepted-AOC | L1 | Accepted-AOC Less Rate | |
| 2 | L2₹12.2 L+₹38,412.30 (3.25%)Rejected-AOC | L2 | Rejected-AOC High Rate |
Tender Value
₹12.0 L
EMD Value
₹12,000
Closing Date
30 Sept 2024, 3:00 pmClosed
The Block Development Officer Hosur
The Block Development Officer Hosur
REPAIRS AND RENOVATION OF PUMS II CLASS ROOM NO 1 EAST FACING BUILDING AT PUNUGAN DODDI VILLAGE KELAVARAPALLI_REPAIRS AND RENOVATION OF PUMS II CLASS ROOM NO 2 WEST FACING BUILDING AT PUNUGAN DODDI VILLAGE KELAVARAPALLI_REPAIRS AND RENOVATION OF GIRL
2024_RDTN_487892_1
2793_2024_R9_06_09_2024
Open Tender
Civil Works - Others
Item Rate
180 days
The Block Development Officer Hosur
please refer tender documents
3 documents required · 3 mandatory
₹0
₹12,000
The Block Development Officer Hosur
2 Jul 2025
25 Sept 2024
30 Sept 2024
25 Sept 2024
30 Sept 2024
25 Sept 2024
25 Sept 2024
Amount
1.REPAIRS AND RENOVATION OF PUMS II CLASS ROOM NO 1 EAST FACING BUILDING AT PUNUGAN DODDI VILLAGE KELAVARAPALLI Rs.6.21/- Lakhs
Chipping of concrete and roughening the surface .
Dismantling of pressed Tiles and weathering course
Clean removal of cement plaster from walls
Plastering the surface of walls with Cement Mortar 1:3 (One cement and Three M.Sand), 10mm thick in all floors including curing etc., complete complying with standard specification and as directed by the departmental officers.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Paving the floor with kota stone slab of size 600 x 600 of 18 / 20mm (un-polished) in all floors laid in of cement mortor 1:3 (one cement three M.Sand), 20mm thick and pointed with colour cement neatly including polishing with polishing stone and oxalic acid etc., so as to perfectly smooth and glossy and including hire charges for polishing machine and power consumption charges etc. The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
Weathering Course Concrete using best quality broken brick jellyof 20 mm uniform guage in pure slaked lime ( NO Sand to be used ( over the RCC roof slab in the proportion of brick jelly to lime being 32 : 121/2 by volume laid over in single layer and consolidated to the required slope and finished thickness and beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime, jaggery water etc. complete complying with standard specifications and as directed.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed.
Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete
Painting One coat with approved Black Oxide for Old Black board
Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer
Repais to Doors
Repais to Windows
Rainwater Haresting structure
Chappal Rack
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris
Providing cuddapah slab 38 to 40mm for shelfs etc., all complete
Providing cuddapah slab 38 to 40mm for shelfs etc., all complete
Light Point SD20
Plug Point SD36
Tube Light SD88
Ceiling Fan SD110
Towards drawing Bala painting including all cost and conveyance of men and materials etc.,(the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Longer wall
Verandah Wall painting with pictures of various modes of transports, traffic symbols and multiplication tables with names both Tamil and English
Ceiling with Solar system painting including scaffolding charges, glitter paints, brushesetc., including all cost and conveyance of men and materials etc., all complete
Towards drawing clock dial with movable longer and shorter arm fixed with central achor nail inlcuding all cost and conveyance of men and materials etc., complete.
Towards drawing ENNUM EZHUTHUM logo inlcuding all cost and conveyance of men and materials etc.,
Name Board charges
Photo charges
2.REPAIRS AND RENOVATION OF PUMS II CLASS ROOM NO 2 WEST FACING BUILDING AT PUNUGAN DODDI VILLAGE KELAVARAPALLI Rs.4.70/- Lakhs
Chipping of concrete and roughening the surface .
Weathering Course Concrete using best quality broken brick jellyof 20 mm uniform guage in pure slaked lime ( NO Sand to be used ( over the RCC roof slab in the proportion of brick jelly to lime being 32 : 121/2 by volume laid over in single layer and consolidated to the required slope and finished thickness and beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime, jaggery water etc. complete complying with standard specifications and as directed.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Paving the floor with kota stone slab of size 600 x 600 of 18 / 20mm (un-polished) in all floors laid in of cement mortor 1:3 (one cement three M.Sand), 20mm thick and pointed with colour cement neatly including polishing with polishing stone and oxalic acid etc., so as to perfectly smooth and glossy and including hire charges for polishing machine and power consumption charges etc.
Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed.
Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete
Painting One coat with approved Black Oxide for Old Black board
Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer
Repais to Doors
Repais to Windows
Rainwater Haresting structure
Chappal Rack
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris
Providing cuddapah slab 38 to 40mm for shelfs etc., all complete
Providing cuddapah slab 38 to 40mm for shelfs etc., all complete
Constuction of new Ramp
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete
Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
BALA PAINTING
Towards drawing Bala painting including all cost and conveyance of men and materials etc.,(the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Longer wall
Verandah pillars painting with MORAL VALUES(both English and Tamil)
Ceiling with Solar system painting including scaffolding charges, glitter paints, brushesetc., including all cost and conveyance of men and materials etc., all complete
Towards drawing clock dial with movable longer and shorter arm fixed with central achor nail inlcuding all cost and conveyance of men and materials etc., complete.
Towards drawing ENNUM EZHUTHUM logo inlcuding all cost and conveyance of men and materials etc.,
Name Board charges
Photo charges
3.REPAIRS AND RENOVATION OF GIRLS II TOILET IN PUMS AT PUNUGAN DODDI VILLAGE KELAVARAPALLI Rs.0.29/- Lakhs
Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete
Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer
Repais to Doors
chicken mess
Construction of leach pit
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
110mm pvc pipe 6ksc
RCC Ring & Slab
Inspection champer
Name Board charges
Photo charges
4.REPAIRS AND RENOVATION OF BOYS TOILET IN PUMS AT PUNUGAN DODDI VILLAGE KELAVARAPALLI Rs.0.29/- Lakhs
Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete
Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer
Repais to Doors
chicken mess
Construction of leach pit
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
110mm pvc pipe 6ksc
RCC Ring & Slab
Inspection champer
Name Board charges
Photo charges
5.REPAIRS AND RENOVATION OF GIRLS I NEAR KITCHEN SHED IN PUMS AT PUNUGAN DODDI VILLAGE KELAVARAPALLI Rs.0.49/- Lakhs
Pointing cm 1:3
Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete
Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer
Repais to Doors
chicken mess
Construction of leach pit
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
110mm pvc pipe 6ksc
RCC Ring & Slab
Inspection champer
Name Board charges
Photo charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Karpaga Vinayagar Engineer Construction (BID ID -1148481)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .