Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAccepted-AOC | ₹9.6 L | L1 | Accepted-AOC Accepted L1 |
| 2 | L2₹10.1 L+₹48,359.77 (5.04%)Rejected-Finance | ₹10.1 L+₹48,359.77 (5.04%) | L2 | Rejected-Finance L2 |
| 3 | L3₹11.5 L+₹1.9 L (19.5%)Rejected-Finance | ₹11.5 L+₹1.9 L (19.5%) | L3 | Rejected-Finance L3 |
| 4 | L4₹11.9 L+₹2.3 L (23.6%)Rejected-Finance | ₹11.9 L+₹2.3 L (23.6%) | L4 | Rejected-Finance L4 |
Tender Value
₹12 L
EMD Value
₹24,000
Closing Date
25 May 2026, 5:00 pmClosed
Executive Engineer PMGSY Division Jammu
Executive Engineer PMGSY Division Jammu
Permanent Restoration of L092-Sehar to Chamarkee road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK05-206, Block Kharah Balli, District Jammu
2026_JKRRD_147726_1
e-NIT No. EE/PMGSY/J/12 of 2026-27 Dated. 18.05.2026
Open Tender
Civil Works - Roads
Percentage
30 days
Jammu
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
₹24,000
Executive Engineer PMGSY Division Jammu
1 Jul 2026
19 May 2026
26 May 2026
19 May 2026
25 May 2026
19 May 2026
20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: 2.9.1 All kinds of soil : | 304.98 | Cum | 256.85 | ₹78,334.11 |
| 2 | Supply and packing of stone boulder in GI wire crates apron complete as per design and technical specifications and including cost of wire | 535.68 | Cum | 1,765.59 | ₹9,45,791.25 |
| 3Carriage of Material by Mechanical Transport including loading & unloading stacking at site complete. | |||||
| 3.01 | (iv) Stone at an average lead 10 KM by MT. | 535.68 | Cum | 328.31 | ₹1,75,869.1 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.58 MB
BOQ_230573.xls
BOQ • 0.23 MB
NIT12Corrigendum.pdf
PDF • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .