Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.5 L+₹49.07 (0.02%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.5 L
EMD Value
₹7,365
Closing Date
21 Sept 2026, 6:00 pmClosed
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
DEV OF PLAY FIELD AT SUBHANPORA BLOCK BIJBEHARA
2026_RDPR_324543_4
ENIT108of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Office of the Executive Engineer REW Anantnag
₹7,365
24 Sept 2026
14 Sept 2026
22 Sept 2026
14 Sept 2026
21 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by manual means in trenches for foundation drains pipes etc not exceeding 1.5mtr in width and not exceeding 10 sqm on plan depth upto 1.5mtr including backfilling of soil & disposal of excavated soil to be leveled and neatly dressed within 25mts lead. | 12.43 | cum | 479 | ₹5,953.97 |
| 2 | P/L of stone soling hand packed,incl ramming with heavy rammer incl. all carriage upto site of work | 0.04 | cum | 1,000 | ₹37 |
| 3 | providing and laying in position cement concrete 1:3:6 of specified grade using 20mm nominal size aggregates. Excluding cost of centering and shuttering all work upto plinth level inc carriage | 0.38 | cum | 6,000 | ₹2,280 |
| 4 | Consolidation of Pitch base to required gradient and x-section using PRR of 8-10t to achieve the required density | 54.37 | sqm | 55 | ₹2,990.35 |
| 5 | S/L of coarse sand incl. sieving of sand properly to remove any foreign substance and laying in layers not exceeding 50mm in depth and surface to be flooded with water incl. carriage of sand from near source | 4.97 | cum | 3,150 | ₹15,655.5 |
| 6 | S/L of sandy loom (mixture of fine sand and fine clay) in ratio 1:10 to be laid in layers not exceeding 50mm in depth and consolidation with 1/2 tonne roller or plate vibrator | 5.47 | cum | 2,500 | ₹13,675 |
| 7 | S/L of top layer of earth having highest clay content available to be laid in layers not exceeding 50mm in depth and consolidation with 1/2 tonne roller or plate vibrator | 5.47 | cum | 1,500 | ₹8,205 |
| 8 | Providing and fixing coir mat for practice pitch of standard quality including fixing with the concrete floor with rawl plugs screws and washers as a complete job | 54.37 | sqm | 400 | ₹21,748 |
| 9 | Painting on steel work with synthetic enamel paint of approved brand and manufacture in all shades to give an even shade ( two or more coats) on new work incl. priming coat.cj | 26.76 | sqm | 136 | ₹3,639.36 |
| 10 | Supplying, transporting, spreading, and laying approved quality good earth free from stones, rubbish, weeds, roots, and other deleterious materials, obtained from approved source, in required thickness at site, including breaking clods, leveling, dressing, watering, and consolidating by rolling with powerful road roller to achieve proper compaction, complete with finishing to required line and level, and all carriage/labour involved, as directed by the Engineer-in-Charge. | 107.71 | cum | 720 | ₹77,551.2 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_1094885.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .