Loading…
Loading…
Tender Value
₹18.9 L
EMD Value
₹19,000
Closing Date
27 Aug 2026, 3:00 pm2d left
Zonal Officer IV
No.266, TH Road, Chennai - 21
Z.O.IV.C.No.B3/2864/2026 Additional Improvement work to Existing Kitchen Cluster at Sigirinthapalayam 5th Street in Division-47,Unit-11,Zone-04
2026_CoC_695469_1
Z.O.IV.C.No.B3/2864/2026
Open Tender
Civil Works
Works
Zonal Office IV
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹19,000
18 Aug 2026
18 Aug 2026
28 Aug 2026
18 Aug 2026
27 Aug 2026
18 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation by Mechanica...2.40m Footing Depth. (including Refilling charges) | 43 | CUM | 368.55 | ₹15,847.65 |
| 2 | Supplying and filling in foundation, basement, etc...tion and as directed by the departmental officers. | 8 | CUM | 391.95 | ₹3,135.6 |
| 3 | Cement Concrete 1:3:6 (One Cement, Three crushed s...artmental officers. - Mixing by mechanical means | 8 | CUM | 6,709.81 | ₹53,678.48 |
| 4 | Supplying and filling in foundation, basement,...tion and as directed by the departmental officers. | 17 | CUM | 252.32 | ₹4,289.44 |
| 5 | Plain Cement Concrete 1:2:4 (one cement, two crush...departmental officers.-Mixing by mechanical means | 6 | CUM | 7,255.21 | ₹43,531.26 |
| 6 | Supplying, fabricating and placing in position Rib...nt and binding wire) Upto plinth / Basement level | 947 | KGS | 96.53 | ₹91,413.91 |
| 7 | Supplying, fabricating and placing in position Rib...t and binding wire) Above plinth / Basement level | 172 | KGS | 98.7 | ₹16,976.4 |
| 8 | Supplying and erecting steel centering including n...l be given after the concrete is laid). FOUNDATION | 48 | SQM | 756.34 | ₹36,304.32 |
| 9 | Supplying and erecting steel centering including n...shall be given after the concrete is laid). COLUMN | 16 | SQM | 669.67 | ₹10,714.72 |
| 10 | Supplying and erecting centering for plane surface...ng shall be given after the concrete is laid).BEAM | 6 | SQM | 1,178.29 | ₹7,069.74 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
TenderDocuments.pdf
Tender Documents • 1.72 MB
BOQ_836246.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].