| Sl No | Description | Qty | Unit | K DHASHINAMOORTHY L2 | SRI BALAJI BUILDERS L1 |
|---|---|---|---|---|---|
| 1.00 | Picking the existing surface 3 to 5 cm deep removal of picked up staff to the side berms and using the useful metal to the road hand packing to camber sectioning levelling etc.,complete as per including labour charges for picking and other tools and plants etc., complete as per standard specifications. 404 of MORTH | 977 | M2 | 21,494 ₹21,494 | 21,299 ₹21,299 Lowest |
| 2.00 | Providing, Laying, Spreading and Compacting grading aggregates to WET MIX MECADAM Specification in 250mm thick in two layers each layer in 125mm thick including premixing the materials with water at OMC in mechanical mix plant. Cariage of mixed materials by tipper to work site laying in uniform layers with pavers in sub base/base course on well prepared surface and compacting with vibratory roller to acheive the desired density etc complete 111,112,406 &900 MORTH Specification | 294 | M3 | 7,93,212 ₹7,93,212 | 7,85,274 ₹7,85,274 Lowest |
| 3.00 | Providing and laying Tack Coat over existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for prparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | 3,474 | M2 | 97,272 ₹97,272 | 93,798 ₹93,798 Lowest |
| 4.00 | Providing and applying of Prime coat using emulsion bitumen at the rate of 7kg per 10m2 over the WET MIX MECADAM Surface preparatory to another bituminous construction over it etc. complete. MORTH 502 | 2,931 | M2 | 2,43,273 ₹2,43,273 | 2,40,635 ₹2,40,635 Lowest |
| 5.00 | Providing and applying of Tack coat over WMM Surface treated with prime coat using 2.50kg bitiminous emulsion per 10m2 As per 111,112,501,503,&900 MORTH Specification | 2,931 | M2 | 57,155 ₹57,155 | 55,689 ₹55,689 Lowest |
| 6.00 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm &below and with 53.20 Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMPsite,heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory/Pneumatic Roller to the required density etc.,including labou for attending to paver at site etc.,including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory/Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc.,complete a sper specification using CMP as per clause 505 MORTH Rev-5 | 321 | M3 | 35,47,050 ₹35,47,050 | 35,10,777 ₹35,10,777 Lowest |
| 7.00 | Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 46.28 kgs of 60/70 Grade Bulk bitumen and 4.024 kgs of shredded plastic for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5 | 193 | M3 | 22,49,415 ₹22,49,415 | 22,26,641 ₹22,26,641 Lowest |
| 8.00 | Providing and laying US Gravel to the specified thick including cost and conveyance of Well gravel from approved quarry and stocking the same at road side to Departmental guage for premeasurement as directed by the Departmental Officers including labour charges for spreading in layers not exceeding 75 mm thick (or) as specified by the departmental officers, levelling, sectioning etc., and all other charges for tools and plants employed for the work and all other incidental charges such as barricading and providing danger lights etc., complete as per standard specification. as per clause 301 & 305 of MORTH | 76 | M3 | 40,128 ₹40,128 | 39,596 ₹39,596 Lowest |
Tender Value
₹84 L
EMD Value
₹84,000
Closing Date
12 Aug 2025, 3:00 pmClosed
EXECUTIVE OFFICER AYYAMPETTAI TOWN PANCHAYAT
EXECUTIVE OFFICER TOWN PANCHAYAT AYYAMPETTAI
Improvement of BT Road at Ariyamangai Road Ariyamangai Road Cross Eruthukarar Street Pasupathi kovil RailadyStreet Pasupathi kovil Railady Street lane Pasupathi kovil Railady Street I Cross Pasupathi kovil Railady Street II Cross KTR Nagar I KTR Nag
2025_DTP_589676_1
RETender SF 25-26 Roc No 161-A/2025 A2
Open Tender
Civil Works
Works
90 days
Ayyampettai
Improvement of BT Road at Ariyamangai Road Ariyamangai Road Cross Eruthukarar Street Pasupathi kovil RailadyStreet Pasupathi kovil Railady Street lane Pasupathi kovil Railady Street I Cross Pasupathi kovil Railady Street II Cross KTR Nagar I KTR Nag
4 documents required · 4 mandatory
₹0
₹84,000
Yes
18 Sept 2025
6 Aug 2025
12 Aug 2025
6 Aug 2025
12 Aug 2025
6 Aug 2025
Picking the existing surface 3 to 5 cm deep removal of picked up staff to the side berms and using the useful metal to the road hand packing to camber sectioning levelling etc.,complete as per including labour charges for picking and other tools and plants etc., complete as per standard specifications. 404 of MORTH
Providing, Laying, Spreading and Compacting grading aggregates to WET MIX MECADAM Specification in 250mm thick in two layers each layer in 125mm thick including premixing the materials with water at OMC in mechanical mix plant. Cariage of mixed materials by tipper to work site laying in uniform layers with pavers in sub base/base course on well prepared surface and compacting with vibratory roller to acheive the desired density etc complete 111,112,406 &900 MORTH Specification
Providing and laying Tack Coat over existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for prparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and applying of Prime coat using emulsion bitumen at the rate of 7kg per 10m2 over the WET MIX MECADAM Surface preparatory to another bituminous construction over it etc. complete. MORTH 502
Providing and applying of Tack coat over WMM Surface treated with prime coat using 2.50kg bitiminous emulsion per 10m2 As per 111,112,501,503,&900 MORTH Specification
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm &below and with 53.20 Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMPsite,heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory/Pneumatic Roller to the required density etc.,including labou for attending to paver at site etc.,including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory/Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc.,complete a sper specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 46.28 kgs of 60/70 Grade Bulk bitumen and 4.024 kgs of shredded plastic for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
Providing and laying US Gravel to the specified thick including cost and conveyance of Well gravel from approved quarry and stocking the same at road side to Departmental guage for premeasurement as directed by the Departmental Officers including labour charges for spreading in layers not exceeding 75 mm thick (or) as specified by the departmental officers, levelling, sectioning etc., and all other charges for tools and plants employed for the work and all other incidental charges such as barricading and providing danger lights etc., complete as per standard specification. as per clause 301 & 305 of MORTH
K DHASHINAMOORTHY (BID ID -1426916)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .