| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.2 LAccepted-AOC ADAM KANAN JHARGRAM 721507 | JHARGRAM | WEST BENGAL | 721507 | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹18.2 L+₹1,493.33 (0.08%)Rejected-Finance 1 6 FAKIR CHAKRABORTY LANE | L2 | Rejected-Finance Rejected | |
| 3 | L3₹18.2 L+₹2,616.48 (0.14%)Rejected-Finance 7G CORNFIELD ROAD KOLKATA 700019 | KOLKATA | KOLKATA | WEST BENGAL | 700019 | L3 | Rejected-Finance Rejected | |
| 4 | L4₹18.2 L+₹3,573.26 (0.20%)Rejected-Finance 17 1 ABHOY HALDER LANE KOLKATA | KOLKATA | L4 | Rejected-Finance Rejected |
Tender Value
Refer Docs
EMD Value
₹42,000
Closing Date
27 Dec 2024, 6:00 pmClosed
Executive Engineer, BMD, PHE, Dte
Office of the Executive Engineer. Bankura Mechanical Division. P.H.E. Dte. Ailakundi, PO Kenduadihi, Bankura 722102.
Repairing and servicing of all H.T equipment in the Sub station at CWR site of Prakash w/s scheme in the Block-Bishnupur under Bankura Mechanical Division PHE Dte.
2024_PHED_779084_23
WBPHED/EE/BMD/NIeT-13 OF 2024-2025
Open Tender
MECHANICAL
Item Rate
60 days
Bankura
Please refer Tender documents.
5 documents required · 5 mandatory
₹42,000
Yes
3 Mar 2025
13 Dec 2024
30 Dec 2024
13 Dec 2024
27 Dec 2024
13 Dec 2024
Amount
Emergency fault finding of the 160 KVA Transformers, 4 &1 panel VCBS, 250KVA AVR with connecting HT, LT cables with hiring of all Testing kit / machine like Insulating Resistance ,VDB test dehydration filtration etc
SINGLE PANEL VCB :
Solid State Electronic Buzzer / Hooter supply Make: STS, Model: SBMV-96, Aux: 12 – 240 V AC/DC
Buzzer / Hooter replacement charges
240 sq. mm. X 3 core, 11 KV grade, Indoor type, heat shrinkable End Termination Kit supply
240 sq. mm., 11 KV grade indoor type heat shrinkable Kit Jointing charges
Cable supporting post insulator supply
3 nos. post insulator replacement charges
200-Watt Space Heater supply Make: RECO, 230 V
Supply delivery of Thermostat supply Range: 30⁰ C - 110⁰ C, 15 Amp., 230/250 V AC Make: ELCON GOLD, Model: MM-106,
Charges for 5 Nos. space heater along with 3 nos. thermostat wiring connection of SP VCB Panel
CT Terminal supply
CT Terminal replacement charges
Charges for 11 KV VCB Racked out from 11 KV Panel, 11 KV VCB Mechanism dismantling, 11 KV VI Housing Rubbing, Cleaning by applying CRC, WD-40, Varnishing by applying Red Insulation Varnish and Heating treatment done for IR Improvement, after IR improving 11 KV VCB Racked IN inside Panel and power charging by Expert Electrical Engineer.
Charges for 11 KV HT cable disconnection, 11 KV CT primary & secondary side disconnection, 11 KV CT dismantling, rubbing, cleaning done by applying CRC, WD-40. After that heating treatment done, then varnishing done by applying Red Insulation Varnish to improve the IR value, after improving the IR value finally re-fitting the 11 KV CT, reconnecting the primary and secondary connection and termination of 11 KV HT cable and power charging Done
Charges for 3 Nos PT Dismantling, Rubbing, Cleaning done by applying CRC, WD-40. After that heating treatment done, then varnishing done by applying Red Insulation Varnish to improve the IR value, after improving the IR value finally re-fitting 3 Nos PT and PT Kept in Line
Charges for CT Spouts & Bus-Bar Spouts Dismantling, Rubbing, Cleaning done by applying CRC, WD-40. After that heating treatment done, then varnishing done by applying Red Insulation Varnish to improve the IR value, after improving the IR value finally re-fitting
Charges for all bus-bar supporting post insulator Dismantling, Rubbing, Cleaning to be done by applying CRC, WD-40. After that heating treatment to be done, then varnishing to be done by applying Red Insulation Varnish to improve the IR value, after improving the IR value finally re?fitting all busbar supporting post insulators
Charges of replacement of spring charging indication circuit checking,Buzzer / Hooter,Aux. Contactor,8 Window Announciator by the skilled electrician as per direction of E.I.C
4 – PANEL VCB:
Supply and delivery of O/C & E/F Relay supply Make: Schneider, Model: Micom P111 / Easergy P1
Supply and delivery of O/C & E/F relay replacement & calibration charges
Supply and delivery of 240 sq. mm. X 3 core, 11 KV grade, Indoor type, Heat shrinkable End Termination Kit
240 sq. mm., 11 KV grade, indoor type, Heat shrinkable Kit Jointing charges
Supply and delivery of 95 sq. mm. X 3 core, 11 KV grade, Indoor type, Heat shrinkable End Termination Kit
95 sq. mm., 11 KV grade, indoor type, Heat shrinkable Kit Jointing charges
Supply and delivery of 200 Watt Space Heater supply 230 V Make: RECO,
Supply delivery of Thermostat supply Range: 30⁰ C - 110⁰ C, 15 Amp., 230/250 V AC Make: ELCON GOLD, Model: MM-106,
Supply delivery of 2.5 sq. mm. S/C, 1.1 KV grade Control cable supply for space heater and thermostat wiring of 4 panel VCB, single panel VCB and control wiring rectification of 4 panel VCB
Charges for 4 Nos. space heater along with 2 nos. thermostat wiring connection of SP VCB Panel
Charges for 11 KV VCB Racked out from 11 KV Panel, 11 KV VCB Mechanism dismantling, 11 KV VI Housing Rubbing, Cleaning by applying CRC, WD-40, Varnishing by applying Red Insulation Varnish and Heating treatment done for IR Improvement, after IR improving 11 KV VCB Racked IN inside Panel and power charging Done of Incomer, O/G-1, O/G-2 & Spare Panel.
Charges for 11 KV HT cable disconnection, 11 KV CT primary & secondary side disconnection, 11 KV CT dismantling, rubbing, cleaning done by applying CRC, WD-40. After that heating treatment done, then varnishing done by applying Red Insulation Varnish to improve the IR value, after improving the IR value finally re-fitting the 11 KV CT, reconnecting the primary and secondary connection and termination of 11 KV HT cable and power charging Done of O/G-1, O/G-2 & Spare Panel.
Charges for Bus-Bars Dismantling, Rubbing, Sulfating Cleaning, Heating by applying CRC, WD-40, for IR Improvement and finally Re-fitting
Supply and delivery of Current Transformer . Ratio: 60 - 30/5+5 A, Make- Reputed Core1: 15 VA, Class: 0.5 Core2: 15 VA, Class: 5P10, STC: 25 kA for 1 SEC
Charges for old burnt CTs dismantling from circuit and new CTs Installation, Fixing, Bus-Bar connection, CT secondary connection at Incomer of 4 panel VCB
Charges for CT Spouts & Bus-Bar Spouts Dismantling, Rubbing, Cleaning done by applying CRC, WD-40. After that heating treatment done, then varnishing done by applying Red Insulation Varnish to improve the IR value, after improving the IR value finally re-fitting of Incomer, O/G-1, O/G-2 & Spare Panel.
Supply and delivery of 11 KV 3 Phase Potential Transformer Ratio: 11 KV/ 110 V, Make: NPP/ Reputed Burden: 100 VA / Phase, Class 0.5 Insulation level: 12 / 28 / 75 kVp, HSV: 12 KV, Voltage Factor: 1.2 continuous 1.5 for 3 secs (Including PT Fuse Supply)
Charges for old defective PTs Secondary wire disconnection, dismantling the defective PTs from circuit and new PTs Installation, Fixing, Bus-Bar connection, PT secondary wire re- connection and after re-fitting the PTs at circuit testing & power re-storation
Power Pack supply Make: Shruti Electronics, I/P: 110 / 230 V AC, O/P: 110 V DC
Power Pack replacement charges
Paint supply for Incomer, Outgoing-1, Outgoing-2 & Spare VCB Chamber & CT Chamber Painting
Rusted portion De-rusting & Painting charges of Incomer, Outgoing-1, Outgoing-2 & Spare VCB Chamber & CT Chamber
250 KVA HT AVR (7 – 12 KV / 11 KV) :
Charges for Di-Electric Strength Test (BDV Test)
Supply delivery and filling of Transformer Oil (minaral cooling Oil) as per IS-335-1993.
Supply delivery of Elysian Blue Color Silica Gel dry and desiccant crystals type in the Breather of above transformer as per direction
Supply and delivery Control Transformer supply 50 VA, 240 V / 110 V
Supply and delivery Aux Contractor supply (4 NO – 4 NC) Make: Siemens / ABB, Coil Voltage: 110 V AC
Supply and delivery Aux Contractor supply (4 NO – 4 NC) Make: Siemens / ABB, Coil Voltage: 220 V AC
Supply and delivry PCB Relay Card for AVR
Supply and delivery Voltage Controller Potentiometer (1K) supply
Supply delivery of Power Pack supply O/P: 110 V DC Make: Shruti Electronics
AVR Inspection and Control Operation Rectification Charges by fixing all supplied spares in item no
Dehydration & Filtration of Transformer Oil by heat run process for improvement of IR Value (BDV minimum 60KV/mnt) by the hiring of Filtering Machine and Testing Machine & Kit etc as per I.E Rules.
All kinds of Gaskets & Oil Seal supply for HT & LT Bushings, Top Cover, Inspection Cover, Valve etc. of (A+C) Unit of 250 KVA AVR
Charges for gasket changes for (A+C) Unit of 250 KVA AVR by disconnecting of all HT and LT terminals, draining transformer oil, opening of top cover, arresting of any oil leakage by changing of gasket and oil seal respectively various gasket portion like top cover, inspection cover, tap switch, conservator tank, radiators, buchholz, drain valve (as where required) and HT-LT bushing portion
Painting of of the above AVR by the ready mixed primer of approved make, and brand incl. preparation of surface by sand paper, cleaning etc. for receiving two coat of superior quality synthetic anamal paint after applying one coat of red lead chromate primer as per direction of EIC Painting wil be done by the spray paiting machine
160 KVA Transformer (11 KV / 0.433 KV) :
Supply and delivery of Transparent Breather with 250 grm. Silica Gel
supply and filling New Transformer Oil as per IS-335
Charges for Di-Electric Strength Test (BDV Test) by the hiring of Testing Machine & Kit etc as per I.E Rules.
Supply and delivery All kinds of Gaskets & Oil Seal supply for HT & LT Bushings, Top Cover, Inspection Cover, Valve etc. of 160 KVA, 11 KV / 0.433 KV Transformer
Charges for gasket changes for 160 KVA Transformer by disconnecting of all HT and LT terminals, draining transformer oil, opening of top cover, arresting of any oil leakage by changing of gasket and oil seal respectively various gasket portion like top cover, inspection cover, tap switch, conservator tank, radiators, buchholz, drain valve (as where required) and HT-LT bushing portion
Dehydration & Filtration of Transformer Oil by heat run process for improvement of IR Value (BDV minimum 60KV/mnt) by the hiring of Filtering Machine and Testing Machine & Kit etc as per I.E Rules. (240ltr x2) nos transformar
Painting of of the above AVR by the ready mixed primer of approved make, and brand incl. preparation of surface by sand paper, cleaning etc. for receiving two coat of superior quality synthetic anamal paint after applying one coat of red lead chromate primer as per direction of EIC Painting wil be done by the spray paiting machine
LT PDB Panel :
Supply and delivery of Multi-Function Meter Make: Schneider, Model: Conzerv EM6400NG
Supply and delivery of Ring CT (0.66/3 KV) Ratio: 60/5 A, VA:5, Class:1.0
Supply and delivry of 3 PH Digital Ammeter (Make- Schneider)
Supply and delivery of 4 Way 63 Amp. Terminal Block
Checking fault part by part of LT PDB panel Replacement and calibration of supplied spares in item no E and cleaning servicing of all terminals, bus bar by applying CRC, WD-40, for IR Improvement .
Add: 18% GST
Add: 1% Cess
H.K.DAS & CO. (BID ID -5910227)
CONCORD ENGINEERING (BID ID -5908698)
ORIENTAL ENGINEERING CO. (BID ID -5910696)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .