Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.1 LAccepted-Finance | ₹35.1 L | L1 | Accepted-Finance Lowest Rate |
| 2 | L2₹35.1 LRejected-Finance | ₹35.1 L | L2 | Rejected-Finance Above to Lowest Rate |
| 3 | L3₹35.1 LRejected-Finance | ₹35.1 L | L3 | Rejected-Finance Above to Lowest Rate |
Tender Value
₹35.1 L
EMD Value
₹3.5 L
Closing Date
29 Apr 2026, 1:00 pmClosed
Executive Officer
NPP MAU
WARD NO 35 MUNSHI PURA PURVI ME GAZIPUR TIRAHA PAR KAMAL BABU KE FACTORY KE MEN GATE SE GUARD ROOM TAK INTERLOCKING PATRI KA KARYA
2026_DOLBU_1131389_1
68-307
Open Tender
Civil Works
120 days
Mau
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,080
Executive Officer
₹3.5 L
6 Jun 2026
30 Mar 2026
29 Apr 2026
30 Mar 2026
29 Apr 2026
30 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1"Site Clerance including labour and matrials and including grass cutting /Dressing and carrage of matrials by Head load" | |||||
| 2"E/W filling in embankment with cartage soil up to 8.00 km distances etc com." | |||||
| 3"E/W in Excavation in ordenery soil in foudation including labour and matrials and T/P with all com. Work SI No. 251" | |||||
| 4"C.C. Work in 1:6:12 in cement, fine sand and 40 mm Gauge Brick Ballast including labour and matrials , T/P with all com. Work SI No. 273" | |||||
| 5"M-150 B/W in 1:4 in cement and coar sand mortar including labour and matrials , T/P with all com. Work SI No.305 "DEDUCTED TO BRICKS AND BATS RS 15470.00 | |||||
| 6"12 mm thick plaster work in 1:3 with cement and fine sand etc all complete. S.I.No 584 " | |||||
| 7"R.C.C. Work in 1:1.5:3 in cement coarse sand and 20mm gauge including labour and matrials, T/P with all com. Work SI No.285" | |||||
| 8"MS work in R.C.C. work including labour and matrials , T/P with all com. Work SI No.504" | |||||
| 9"Construction of Granular sub base (GSB) by providing coarse graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per Clause 401 .." | |||||
| 10"P /L of 80 mm thick rubber moulded nterlocking cement concrete Paver blocks,Work SI No. 786(I)" | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.43 MB
tech68.pdf
Tender Documents • 4.90 MB
BOQ_2110947.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid