Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹43.9 LAccepted-Finance | 1 | Accepted-Finance L1 | |
| 2 | 2₹45.5 L+₹1.6 L (3.68%)Accepted-Finance | 2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | JP Infratech L2 | ARUN KUMAR L1 |
|---|---|---|---|---|---|
| 1.00SITC of following materials as per REC standards for creation of 25 KVA Sub-station at Village Tekra Chicha in Block Nagseni under UT capex Budget 2025-26 in respect of Electric JPDCL Sub-Division Kishtwar ED Kishtwar. | |||||
| 1.01 | 11/0.433kV, 25 KVA Transformer 3-phase Distribution Transformerwith Bimettalic connectors EEL2, Al Wound (EEL-2) | 1 | Nos | 1,00,000 ₹1,00,000 | 90,000 ₹90,000 Lowest |
| 1.02 | ST Pole 9Mtr long (410 Sp 33) HT | 40 | Nos | 16,500 ₹6,60,000 | 14,500 ₹5,80,000 Lowest |
| 1.03 | ST Pole 8 Mtr. long (410 SP 15) LT | 6 | Nos | 16,500 ₹99,000 | 14,500 ₹87,000 Lowest |
| 1.04 | ACSR Weasel conductor HT/LT 30mmsq | 9.5 | Km | 38,000 ₹3,61,000 | 35,000 ₹3,32,500 Lowest |
| 1.05 | 11KV Polymeric Composite Disc insulator 12kV, min falling load 45kN positive and 80kV Negative , creepage distance 320mm with Fitting | 36 | Nos | 300 ₹10,800 Lowest | 435 ₹15,660 |
| 1.06 | 11KV Polymeric Composite Pin insulator 12kV, 5kN, Lightening Impulse 75kV Positive and 80kV Negative , creepage distance 320mm | 105 | Nos | 250 ₹26,250 Lowest | 320 ₹33,600 |
| 1.07 | 11KV Link set (Heavy Duty) 50x6 mmm Polymer | 3 | Sets | 5,500 ₹16,500 Lowest | 7,500 ₹22,500 |
| 1.08 | 11KV Gapless surge Arrestor, 9kV,10kA,LA with polymer housing Station Type | 1 | Sets | 5,500 ₹5,500 Lowest | 6,500 ₹6,500 |
| 1.09 | 11KV D.O. Set Polymer type | 1 | Sets | 5,000 ₹5,000 Lowest | 7,500 ₹7,500 |
Tender Value
₹46 L
EMD Value
₹1.4 L
Closing Date
16 Sept 2025, 4:00 pmClosed
Office of Ex Engg ED kishtwar
Office of Ex Engg ED kishtwar
PL REFER SBD
2025_PDD_285537_1
ENIT NO.14 OF 2025
Open Tender
Electrical Works
Turn-key
60 days
KISHTWAR
PL REFER TENDER DOCS
3 documents required · 3 mandatory
₹1,000
Ex Engg ED kishtwar
₹1.4 L
1 Oct 2025
25 Aug 2025
17 Sept 2025
25 Aug 2025
16 Sept 2025
25 Aug 2025
25 Aug 2025 - 16 Sept 2025
Amount
SITC of following materials as per REC standards for creation of 25 KVA Sub-station at Village Tekra Chicha in Block Nagseni under UT capex Budget 2025-26 in respect of Electric JPDCL Sub-Division Kishtwar ED Kishtwar.
11/0.433kV, 25 KVA Transformer 3-phase Distribution Transformerwith Bimettalic connectors EEL2, Al Wound (EEL-2)
ST Pole 9Mtr long (410 Sp 33) HT
ST Pole 8 Mtr. long (410 SP 15) LT
ACSR Weasel conductor HT/LT 30mmsq
11KV Polymeric Composite Disc insulator 12kV, min falling load 45kN positive and 80kV Negative , creepage distance 320mm with Fitting
11KV Polymeric Composite Pin insulator 12kV, 5kN, Lightening Impulse 75kV Positive and 80kV Negative , creepage distance 320mm
11KV Link set (Heavy Duty) 50x6 mmm Polymer
11KV Gapless surge Arrestor, 9kV,10kA,LA with polymer housing Station Type
11KV D.O. Set Polymer type
C I X Arm 5ft Long GI (75x40x6)mm
C I X Arm 6ft Long GI (75x40x6)mm (2No. Each on DP)
C I X Arm 7ft Long GI (75x40x6)mm for Link Set Structure
C I X Arm 2.5 ft Long for bed GI (100x50x6)
Angle Iron Brace 7Ft long GI (40x40x6)mm
Angle Iron Brace 1Mtr long GI (40x40x6)mm
Shackle Insulators LT
Mucky Clamps complete set (50x6) GI
Back Clamps 50x6mm GI
120mmsq. PVC Single Core Cable 1.1kV Grade XLPE insulated (Unarmoured) Cable
Almunium Thimble 120 mmsq
Bus Bar Insulator
Almunium Bus Bar Strip
G I wire
U-Clamps
Nuts and Bolts of sorts (Galvanized)
Galvanized Stay set Complete with 50x8mm Stay Clamp,Guy Insulator,2 Nos, nut bolt, 2 no turn buckles, 1.8mtr long, 16mm Dia solid GS Stay Rod & 7/3.15mm Dia GI Standard Wire complete
Cement Bottoming 1:2:4 of ST Pole
Earthing of ST Poles complete by GI Pipe 40mm, 3mtr long through GI strip 25x3mm
Earthing of sub station by way of installation of Earthing Pipe 40mm & length 2.5Mtr. , GI strip size 25mm x 3mm for neutral earthing,DT body & LA.
Bobin Insulator with clamps for proper earthing of Las
Applying of Red oxide and Al. Paint coating on ST Poles
SITC of following materials as per REC standards for creation of 25 KVA Sub-station at Village Bella Chicha in Block Nagseni under UT capex Budget 2025-26 in respect of Electric JPDCL Sub-Division Kishtwar ED Kishtwar.
11/0.433kV, 25 KVA Transformer 3-phase Distribution Transformerwith Bimettalic connectors EEL2, Al Wound (EEL-2)
ST Pole 9Mtr long (410 Sp 33) HT
ST Pole 8 Mtr. long (410 SP 15) LT
ACSR Weasel conductor HT/LT 30mmsq
11KV Polymeric Composite Disc insulator 12kV, min falling load 45kN positive and 80kV Negative , creepage distance 320mm with Fitting
11KV Polymeric Composite Pin insulator 12kV, 5kN, Lightening Impulse 75kV Positive and 80kV Negative , creepage distance 320mm
11KV Link set (Heavy Duty) 50x6 mmm Polymer
11KV Gapless surge Arrestor, 9kV,10kA,LA with polymer housing Station Type
11KV D.O. Set Polymer type
C I X Arm 5ft Long GI (75x40x6)mm
C I X Arm 6ft Long GI (75x40x6)mm (2No. Each on DP)
C I X Arm 7ft Long GI (75x40x6)mm for Link Set Structure
C I X Arm 2.5 ft Long for bed GI (100x50x6)
Angle Iron Brace 7Ft long GI (40x40x6)mm
Angle Iron Brace 1Mtr long GI (40x40x6)mm
Shackle Insulators LT
Mucky Clamps complete set (50x6) GI
Back Clamps 50x6mm GI
120mmsq. PVC Single Core Cable 1.1kV Grade XLPE insulated (Unarmoured) Cable
Almunium Thimble 120 mmsq
Bus Bar Insulator
Almunium Bus Bar Strip
G I wire
U-Clamps
Nuts and Bolts of sorts (Galvanized)
Galvanized Stay set Complete with 50x8mm Stay Clamp,Guy Insulator,2 Nos, nut bolt, 2 no turn buckles, 1.8mtr long, 16mm Dia solid GS Stay Rod & 7/3.15mm Dia GI Standard Wire complete
Cement Bottoming 1:2:4 of ST Pole
Earthing of ST Poles complete by GI Pipe 40mm, 3mtr long through GI strip 25x3mm
Earthing of sub station by way of installation of Earthing Pipe 40mm & length 2.5Mtr. , GI strip size 25mm x 3mm for neutral earthing,DT body & LA.
Bobin Insulator with clamps
Applying of Red oxide and Al. Paint coating on ST Poles
SITC of following materials as per REC standards for creation of 25 KVA Sub-station at Village Hadwari Chicha in Block Nagseni under UT capex Budget 2025-26 in respect of Electric JPDCL Sub-Division Kishtwar ED Kishtwar.
11/0.433kV, 25 KVA Transformer 3-phase Distribution Transformerwith Bimettalic connectors EEL2, Al Wound (EEL-2)
ST Pole 9Mtr long (410 Sp 33) HT
ST Pole 8 Mtr. long (410 SP 15) LT
ACSR Weasel conductor HT/LT 30mmsq
11KV Polymeric Composite Disc insulator 12kV, min falling load 45kN positive and 80kV Negative , creepage distance 320mm with Fitting
11KV Polymeric Composite Pin insulator 12kV, 5kN, Lightening Impulse 75kV Positive and 80kV Negative , creepage distance 320mm
11KV Link set (Heavy Duty) 50x6 mmm Polymer
11KV Gapless surge Arrestor, 9kV,10kA,LA with polymer housing Station Type
11KV D.O. Set Polymer type
C I X Arm 5ft Long GI (75x40x6)mm
C I X Arm 6ft Long GI (75x40x6)mm (2No. Each on DP)
C I X Arm 7ft Long GI (75x40x6)mm for Link Set Structure
C I X Arm 2.5 ft Long for bed GI (100x50x6)
Angle Iron Brace 7Ft long GI (40x40x6)mm
Angle Iron Brace 1Mtr long GI (40x40x6)mm
Shackle Insulators LT
Mucky Clamps complete set (50x6) GI
Back Clamps 50x6mm GI
120mmsq. PVC Single Core Cable 1.1kV Grade XLPE insulated (Unarmoured) Cable
Almunium Thimble 120 mmsq
Bus Bar Insulator
Almunium Bus Bar Strip
G I wire
U-Clamps
Nuts and Bolts of sorts (Galvanized)
Galvanized Stay set Complete with 50x8mm Stay Clamp,Guy Insulator,2 Nos, nut bolt, 2 no turn buckles, 1.8mtr long, 16mm Dia solid GS Stay Rod & 7/3.15mm Dia GI Standard Wire complete
Cement Bottoming 1:2:4 of ST Pole
Earthing of ST Poles complete by GI Pipe 40mm, 3mtr long through GI strip 25x3mm
Earthing of sub station by way of installation of Earthing Pipe 40mm & length 2.5Mtr. , GI strip size 25mm x 3mm for neutral earthing,DT body & LA.
Bobin Insulator with clamps
Applying of Red oxide and Al. Paint coating on ST Poles
Right back of 3 no. DG sets from these areas back to the divisional stores after commisioning of grid connectivity works.
JP Infratech (BID ID -2490854)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .