Loading…
Loading…
Tender Value
₹2.3 Cr
EMD Value
₹1.2 L
Closing Date
31 Aug 2026, 5:30 pm7d left
CMO DOLA
MUNICIPAL COUNCIL DOLA DISTT ANUPPUR MP
INTERCEPTION AND DIVERSION WORK FOR TAPPING NALLAH AND SETUP SEWAGE TREATMENT PLANTFORUSED WATER MANAGEMENT FOR DOLA TOWN
2026_UAD_525892_1
1193/E-TENDER /NAGAR PARISHAD DOLA,ANUPPUR
Open Tender
Civil Works - Others
Lump-sum
365 days
MUNICIPAL COUNCIL DOLA DISTT ANUPPUR MP
Please refer Tender documents.
10 documents required · 10 mandatory
₹15,000
₹1.2 L
NAGAR PARISHAD DOLA
31 Jul 2026
31 Jul 2026
3 Sept 2026
31 Jul 2026
31 Aug 2026
31 Jul 2026
17 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | 1. Design and build 1 Nos. sewage treatment plant of installed capacity 0.8 MLD of Constructed Wetland based, and all appurtenant structures and allied works;
2. Survey, review the designs, redesign where necessary, and diversion works of Nallahs with interception sewer of about 2.8 Km length which includes Pumping Main Comprising of DI-K7 class pipe of 100 mm to 150 mm diameter having length of 2700m & Gravity Main Comprising of RCC NP3 Pipe of 500 mm diameter having length of 100m,
3. Construction of 2 nos. I&D Structure at Nallah
4. Construction of 2 Nos of Screen Chamber
5. Construction of 01 no. Intermediate Pumping station 0.6 MLD.
6. Construction of 01 no. Main Pumping station 0.8 MLD.
7. Strengthening of drain having length 450 m including survey, design and all appurtenant structures and allied works; and
8. Providing and Laying of 1 Km of HT Line. | - | LumpSum | 2,33,87,000 | - |
| 1.02 | Operation and Maintenance Cost For 1st Years | - | LumpSum | 9,01,000 | - |
| 1.03 | Operation and Maintenance Cost For 2nd Years | - | LumpSum | - | - |
| 1.04 | Operation and Maintenance Cost For 3rd Years | - | LumpSum | - | - |
| 1.05 | Operation and Maintenance Cost For 4th Years | - | LumpSum | - | - |
| 1.06 | Operation and Maintenance Cost For 5th Years | - | LumpSum | - | - |
| 1.07 | Operation and Maintenance Cost For 6th Years | - | LumpSum | - | - |
| 1.08 | Operation and Maintenance Cost For 7th Years | - | LumpSum | - | - |
| 1.09 | Operation and Maintenance Cost For 8th Years | - | LumpSum | - | - |
| 1.1 | Operation and Maintenance Cost For 9th Years | - | LumpSum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.57 MB
NIT1193.pdf
Tender Documents • 1.98 MB
finalDpr1193.pdf
Other Document • 15.98 MB
BOQ_633011.xls
BOQ • 0.34 MB
Annexure_E1193.pdf
Additional Documents • 2.58 MB
corigendumdola.pdf
PDF • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].