Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.2 L
Closing Date
28 Apr 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EX ENGINEER KPDCL DIVISION KULGAM
EX ENGINEER KPDCL DIVISION KULGAM
Arrangement for Illumination and Providing of Un-interrupted Power Supply to Transit Base Camp at Walnut Factory Qazigund
2021_PDD_122359_2
NIT02EDK
Open Tender
Electrical Works
Turn-key
15 days
QAZIGUND
Please refer Tender documents.
6 documents required · 6 mandatory
₹450
EX ENGINEER KPDCL DIVISION KULGAM
Exempted
29 Apr 2021
13 Apr 2021
29 Apr 2021
13 Apr 2021
28 Apr 2021
13 Apr 2021
13 Apr 2021 - 20 Apr 2021
120 days
Amount
Daily Operation and Maintenance of existing 100KVA D.G Set including M Oil change/battery charging /replacement( if required) to make DG Set functional during the Proposed Yatra period of Sixty Days but excluding the cost of fuel charges within the Transit Base Camp Walnut factory Qazigund
Daily Hire and Maintenance charges of 60 Watt LED Flood Lights with complete Housing and allied wiring and switches including the Installation & Operation during the proposed Yatra period of Sixty Days within the Transit Base Camp Walnut factory Qazigund
Daily Hire and Maintenance charges of 120 Watt Flood Lights Outdoor type, Moisture Resistant having Ingress Protection IP65 with complete Housing and Allied Wiring and Switches including Installation & Operation during the proposed Yatra period of Sixty Days within the Transit Base Camp Walnut factory Qazigund.
Daily Hire and Maintenance charges of 09 Watt LED Lamps including Holders , Shades , Bed switches with Allied Wiring including Installation & Operation during the proposed Yatra period of Sixty Days within the Transit Base Camp Walnut factory Qazigund
Daily Hire and Maintenance charges of 20 Watt LED tube lights complete with Allied wiring including the Installation & Operation during the proposed Yatra period ofSixtyDays within the Transit Base Camp Walnut factory Qazigund
Daily Hire and Maintenance charges of 2 Pin Socket, 6 Amp complete with allied wiring and switches including the Installation & Operation during the proposed Yatra period of Sixty Days within the Transit Base Camp Walnut factory Qazigund
Daily Hire and Maintenance charges of 5 Pin Socket, 6 Amp complete with Allied wiring and switches including the Installation & Operation during the proposed Yatra period of Sixty Days within the Transit Base Camp Walnut factory Qazigund
Daily Hire and Maintenance charges of 32 Amp SS Combine with Allied wiring and switches including the Installation & Operation during the proposed Yatra period of Sixty Days within the Transit Base Camp Walnut factory Qazigund
Supply , installation ,testing & commissioning charges of LT 3 Phase Change-over 63A complete with Allied wiring including the Installation & Operation during the proposed Yatra period of Sixty Days within the Transit Base Camp Walnut factory Qazigund
Daily Hire and Maintenance charges of PVC 16SQMM twin core cable including laying and fixing of same as Service lines at various points within the Transit camp at Walnut factory Qazigund
Daily Hire and Maintenance charges of Standing fan 1200mm Sweep with Allied wiring and switches including the Installation and Operation for the proposed Yatra period of Sixty Days within the Transit Base Camp Walnut factory Qazigund
Daily Hire and Maintenance charges of Ceiling Fans 1200 Sweep complete with Allied wiring and switches including the Installation and Operation for the proposed Yatra period of Sixty Days within the Transit Base Camp Walnut factory Qazigund
Supply of HSD( fuel) for operation of 100 KVA D G Set for sixty days FOR yatra camp
M/S GANIE ELECTRICALS
M/S Soban Electrical
M/S Itoo Electrical
M/S ZAID CONTRACTORS
stage.html
html • 0.02 MB
finance_236520.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .