Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
₹37.3 L
Closing Date
29 Dec 2021, 6:00 pmClosed
xen
C/O JAL SHAKTI PHE DIV UDHAMPUR
Laying of GI pipes Network in left out portion of Moud Kah Narsoo and Champari during the widening of National Highway from Udhampur to Chenani
2021_PHE_153857_1
e-NIT No. 112 of 2021-22
Open Tender
Civil Works - Others
Item Rate
45 days
UDHAMPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
XEN
Exempted
18 Feb 2022
18 Dec 2021
30 Dec 2021
18 Dec 2021
29 Dec 2021
18 Dec 2021
Amount
Earth work in excavation by manual means in trenches for foundation, drains, pipes, cables etc (not exceeding 1.5mtr in width) for shaft, well cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed (in all kind of soil at 1.00 mtr from cutting edge) At different locations
Spot No 1 Trench size of 32mm dia Light = 62.50 x 0.45 x 0.40 = 11.25 Trench size of 20mm dia Light = 750.00 x 0.40 x 0.30 = 90.00 Spot No 2 Trench size of 50mm dia Light = 500.00 x 0.50 x 0.45 = 112.50 Trench size of 40mm dia Light = 500.00 x 0.50 x 0.40 = 100.00 Trench size of 32mm dia Light = 200.00 x 0.45 x 0.40 = 36.00 Spot No 3 Trench size of 50mm dia Light = 500.00 x 0.50 x 0.40 = 100.00 Trench size of 40mm dia Light = 400.00 x 0.50 x 0.40 = 80.00 Trench size of 32mm dia Light = 200.00 x 0.45 x 0.40 = 36.00 Trench size of 25mm dia Light = 200.00 x 0.40 x 0.35 = 28.00 Trench size of 20mm dia Light = 200.00 x 0.40 x 0.30 = 24.00 Trench size of 15mm dia Light = 500.00 x 0.30 x 0.30 = 45.00 Total = 662.75 Taking Quantity of earth work @ 90% = 596.48
Moud Area Trench size of 15-25mm dia Light = 2300.00 x 0.40 x 0.40 = 368.00 Trench size of 32-40 mm dia Light = 900.00 x 0.45 x 0.45 = 182.25 Trench size of 50mm dia Light = 700.00 x 0.50 x 0.50 = 175.00 Kha Area Trench size of 15-25mm dia Light = 900.00 x 0.40 x 0.40 = 144.00 Trench size of 32-40 mm dia Light = 700.00 x 0.45 x 0.45 = 141.75 Total = 1011.00 Taking Quantity of earth work @ 85% = 859.35
Providing and laying of GI Pipes complete with cost of G.I pipes / fittings / all types of pipe specials as per site requirement including handling of all type of carriages of material to the sites of work, interconnection at tapping point and delivery point with the exisiting system, (complete rate to be quoted by the Contractor) excluding trenching and refilling etc.
GI pipe 50mm dia nominal bore (Light)
GI pipe 40mm dia nominal bore (Light)
GI pipe 32mm dia nominal bore (Light)
GI pipe 25mm dia nominal bore (Light)
GI pipe 20mm dia nominal bore (Light)
GI pipe 15mm dia nominal bore (Light)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layer not exceeding 20cm in depth consolidation
Note :- The bidders shall quoted their rates including carriage / head load of the material
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .