Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹3.7 L
EMD Value
₹3,730
Closing Date
8 Feb 2020, 4:00 pmClosed
Executive Engineer PWD R and B Division Kathua
Executive Engineer PWD R and B Division Kathua
BOQ
2020_PWDJK_91128_1
e-NIT No. 110 of 2019-20/11474-93/G DT.23.01.2020
Open Tender
Civil Works - Roads
Item Wise
30 days
Kathua
NIT
5 documents required · 5 mandatory
₹600
Yes
Executive Engineer PWD R and B Division Kathua
₹3,730
Yes
19 Feb 2020
24 Jan 2020
10 Feb 2020
24 Jan 2020
8 Feb 2020
24 Jan 2020
Amount
Earth work excavation in all kinds of soil by manual or mechanical means (Hydraulic excavator) in foundation trenches, drains, pipes and cables etc. ( not exceeding 1.5 m in width or 10 sqm on plan) incl. dressing of sides and ramming of bottoms, lift upto 1.5mtr. incl. disposal or filling of excavated earth as per the directions of Engineer-in-charge .
Providing & laying in position cement concrete 1:5:10 (cement : 5 coarse sand : 10 graded crushed stone aggregate 40 mm nominal size) of specified grade excl. the cost of centring & shuttering incl. all leads, lifts & carriage of material by MT/ H.L.- All work upto plinth level.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering including all leads, lifts and carriage of material by MT / H.L. - All work upto plinth level. 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded crushed stone aggregate 20 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement- All work upto plinth level. 1 : 1.5 : 3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20 mm nominal size) including all leads, lifts and carriage of material by MT / H.L.
Providing, hoisting and fixing upto floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like including the cost of required centring shuttering, finishing smooth with 6 mm thick cementplaster 1:3 (1 cement: 3 fine sand) on exposed surfaces complete but excluding cost of reinforcement with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate:20 mm nominal size).
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete Thermo Mechanically Treated bars incl. all leads, lifts and carriage of material by MT / H.L.
Centring and shuttering including strutting propping etc and removal of form work
Foundations, footings, bases of columns etc. for mass concrete
Suspended floors, roofs, landings, balconies & access platform.
M/S JAI KUL DEV CONSTRUCTIONS
M/S SHREE GANESH CONSTRUCTION WORK
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .