| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.7 LAccepted-Finance | L1 | Accepted-Finance Addmeted | |
| 2 | L2₹19.7 L+₹3,491.67 (0.18%)Accepted-Finance | L2 | Accepted-Finance Addmeted |
Tender Value
₹19.9 L
EMD Value
₹20,000
Closing Date
21 Feb 2023, 3:00 pmClosed
Block Development Office BP
Block Development Office BP
Krishnagiri Dt Bargur Block Mines and Minerals 2021_22 Package No_74 Construction of Culvert 2 mt Span 2 vent at Echankattu River crossing at Achamangalam Panchayat
2023_RDTN_288739_1
5203_2022_A3_Dt_01_02_2023
Open Tender
Civil Works - Others
Item Rate
90 days
Block Development Office BP
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹20,000
Block Development Office BP
6 Mar 2023
15 Feb 2023
21 Feb 2023
15 Feb 2023
21 Feb 2023
15 Feb 2023
15 Feb 2023
Amount
1.Construction of Culvert 2.0mt Span 2 vent @ Echankattu River crossing H/O Achamangalam. Estimate Amount :19.92 Lakhs
Hard rock measured in solid including blasting & stacking them,Levelling the aera all labour charges etc complete.
Drilling of holes in hard rock aera including cost and conveyance of all materials and all labour charges etc complete.
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
PCC 1:4:8 using 40mm HBGs jelly for foundation concrete
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Deck Slab bottom
Supplying and Filling foundation and basement with filling Garvel in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Providing for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K Sundaramoorthy
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .