| 1 | 1₹4.0 LAccepted-AOC M 36 HOUSING UNIT MATHAIYANKUTTAI PO METTUR DAM 636452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | ₹4.0 L Quoted ₹3.5 L | 1 | Accepted-AOC L1 |
| 2 | 2₹3.6 LRejected-AOC H 6 HOUSING BOARD UNIT MATHAVANKUTTAI P O METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | ₹3.6 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MARSSAL ENTERPRISES L1 | R K ENGINEERING CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Providing & dismantling scaffolding arrangements above APH (Nearby style-07 expansion joints) and cover the opening above APH with 3.15 mm HR sheet to prevent falling of materials in to APH to ensure safety for the workmen in APH. | 1 | No. | 81,430 ₹81,430 Lowest | 82,800 ₹82,800 |
| 2.00 | Charges for cutting and removal of heavily eroded flue gas duct plates (Multilayer) from the parent plate, transporting & devoluting scrap to Central Stores/M.T.P.S.I. | 20 | M² | 1,135 ₹22,700 Lowest | 1,180 ₹23,600 |
| 3.00 | Charges for cutting and removal of eroded guard plates over the expansion joint of Style 07 and providing new guard plate of size 3.15 mm HR sheet over the expansion joint after completion of inspection and patch welding works on expansion joints. | 40 | M² | 1,510 ₹60,400 Lowest | 1,610 ₹64,400 |
| 4.00 | Charges for transporting of 6 mm M.S./ Chequered plates from Central Stores/MTPS to Boiler area, cutting into required size, leading, lifting, positioning on the eroded portions of the duct and welding the same. | 20 | M² | 1,612 ₹32,240 Lowest | 1,690 ₹33,800 |
| 5.00 | Charges for removing the existing eroded duct supports and transporting of new pipes / Angles from Central Stores / MTPS-I, cutting into required size leading lifting, positioning and welding. | 80 | Mtr. | 240 ₹19,200 Lowest | 270 ₹21,600 |
| 6.00 | Renewal of supporting structure of APH inlet and out let duct Hopper area. | 1 | No. | 80,500 ₹80,500 Lowest | 82,000 ₹82,000 |
| 7.00 | Cutting gas | 3 | Set | 3,654 ₹10,962 Lowest | 3,750 ₹11,250 |
| 8.00 | Welding Rod | 80 | kg | 446 ₹35,680 Lowest | 480 ₹38,400 |
| 9.00 | Consumables and T & Ps | 1 | LS | 3,680 ₹3,680 Lowest | 3,900 ₹3,900 |
Tender Value
Refer Docs
EMD Value
₹3,800
Closing Date
23 Feb 2026, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM Unit I AOH 2026 27 Cutting and Patch welding on the eroded portion of the FG duct from ECO outlet to APH inlet etc
2026_EB_652998_1
CE / MTPS-I / SE / M-I / BM /OT. 481 / 2025-26
Open Tender
Power/Energy Projects/Products
Works
20 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹3,800
Yes
1 Aug 2026
9 Feb 2026
24 Feb 2026
9 Feb 2026
23 Feb 2026
9 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing & dismantling scaffolding arrangements above APH (Nearby style-07 expansion joints) and cover the opening above APH with 3.15 mm HR sheet to prevent falling of materials in to APH to ensure safety for the workmen in APH. | 1 | No. | - | - |
| 2 | Charges for cutting and removal of heavily eroded flue gas duct plates (Multilayer) from the parent plate, transporting & devoluting scrap to Central Stores/M.T.P.S.I. | 20 | M² | - | - |
| 3 | Charges for cutting and removal of eroded guard plates over the expansion joint of Style 07 and providing new guard plate of size 3.15 mm HR sheet over the expansion joint after completion of inspection and patch welding works on expansion joints. | 40 | M² | - | - |
| 4 | Charges for transporting of 6 mm M.S./ Chequered plates from Central Stores/MTPS to Boiler area, cutting into required size, leading, lifting, positioning on the eroded portions of the duct and welding the same. | 20 | M² | - | - |
| 5 | Charges for removing the existing eroded duct supports and transporting of new pipes / Angles from Central Stores / MTPS-I, cutting into required size leading lifting, positioning and welding. | 80 | Mtr. | - | - |
| 6 | Renewal of supporting structure of APH inlet and out let duct Hopper area. | 1 | No. | - | - |
| 7 | Cutting gas | 3 | Set | - | - |
| 8 | Welding Rod | 80 | kg | - | - |
| 9 | Consumables and T & Ps | 1 | LS | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_782998.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].