Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.8 LAccepted-AOC DIC 138 INDUSTRIAL AREA BADDI DISTT SOLAN H P 173205 | BADDI | SOLAN | HIMACHAL PRADESH | 173205 | 1 | Accepted-AOC Rates are on lowest side | |
| 2 | 2₹11.3 L+₹44,550.90 (4.12%)Rejected-AOC 1286 3 SHASHRI NAGAR MEERUT | MEERUT | 2 | Rejected-AOC Rates on Higher side | |
| 3 | 3₹11.7 L+₹93,450.10 (8.64%)Rejected-AOC 103 HARIAKSH PLAZA HOSPITAL ROAD BHUJ KUTCH GUIARAT 370001 | BHUJ | KUTCH | GUJARAT | 370001 | 3 | Rejected-AOC Rates on Higher side | |
| 4 | 4₹12.7 L+₹1.9 L (17.8%)Rejected-AOC NIL | 4 | Rejected-AOC Rates on Higher side |
Tender Value
Refer Docs
EMD Value
₹32,100
Closing Date
31 Mar 2021, 12:00 pmClosed
Sr. Executive Engineer
ES Division HPSEBL Hamirpur
As per BOQ
2021_HPSEB_45823_1
ESDH-1/2020-21
Open Tender
Electrical Works
Item Rate
7 days
As Per Tender Document
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,770
Sr Eecutive Engineer HPSEBL Hamirpur
₹32,100
31 Mar 2021
22 Mar 2021
31 Mar 2021
22 Mar 2021
31 Mar 2021
22 Mar 2021
Amount
Augmentation of 132kV bus bar from Zebra conductor to Tarantula conductor (supplied departmently) by dismantling Zebra conductor, rolling of dismantled conductor, removing of hardware fittings, disc insulator strings, loading and unloading, transportation to HPSEBL store at Mattansidh, Hamirpur and mounting of insulator strings on bus bar for Tarantula conductor including laying, jointing, tensioning, stringing, sgging and clamping of conductor etc. complete in all respect.
Providing and fixing of following hardware fitting for augmentation of 132kV bus bar at Sr. No.1:
Suspension Clamp Assembly complete in all respect for Tarantula Conductor
Isolator Straight Clamp for Tarantula Conductor
CT Clamp for Tarantula Conductor
Post Clamp for Tarantula Conductor
PT Clamp for Tarantula Conductor
Dead End Clamp for Tarantula Conductor
T-Clamp for Tarantula Conductor
Circuit Breaker Clamp for Tarantula Conductor
PG Clamp for Tarantula Conductor
Lightening Arrestor Clamp for Tarantula Conductor
CVT Clamp for Tarantula Conductor
Wave trap Clamp for Tarantula Conductor
Replacement of 145kV isolators without earth blade (supplied departmantly) by dismantling existing 145kV isolators including loading and unloading, transportation to HPSEBL store at Mattansidh, Hamirpur complete in all respect.
Replacement of 132kV CT (supplied departmantly) by dismantling existing 132kV CT installed in 132kV Bassi-Anu transmission line bay including loading and unloading, transportation to HPSEBL store at Mattansidh, Hamirpur complete in all respect.
ARUN ELECTRICALS INDIA
Vijay Construction Company
mohd anwar
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .