| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.1 CrAdmitted-Finance | ₹11.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹18.5 Cr+₹7.4 Cr (67.1%)Admitted-Finance | ₹18.5 Cr+₹7.4 Cr (67.1%) | L2 | Admitted-Finance |
| 3 | L3₹18.6 Cr+₹7.5 Cr (67.9%)Admitted-Finance 8 1 BALAKKAGARI PALLI VEERABALLI VEERABALLI 516268 ANDHRA PRADESH INDIA | VEERABALLI | Y S R | ANDHRA PRADESH | 516268 | ₹18.6 Cr+₹7.5 Cr (67.9%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Bidder is techno commercially not acceptable |
| Sl No | Description | Qty | Unit | KSHETRA INFRATECH L3 | SJ CONSTRUCTION L1 | UPADHYAY CONSTRUCTION PVT LTD L2 |
|---|---|---|---|---|---|---|
| 1.00PART - I : CIVIL WORKS | ||||||
| 2.00SITE CLEARANCE | ||||||
| 3.00 | DEMOLITION OF R.C.C./BRICKS/STONE MASONARY
Site clearance by demolition of R.C.C./PCC/Brickwork/Stone Masonry/Stone Soling, Flexible pavements etc. along with removing the debris and disposal of unserviceable material to any lead and staking of serviceable materials, handing over serviceable material to concerned department if required as per technical specifications and direction of Engineer-in-charge. | 300 | CUM | 500 ₹1,77,000 Lowest | - | 1,200 ₹4,24,800 |
| 4.00Note: | ||||||
| 5.001. Rate includes cost of all labour, tools, tackles, hire charges, royalties, levies, leads, loading/unloading, transportation, water, electric power, illumination etc. complete in all respects as per scope of work, detailed construction drawings, technical specifications and direction of Engineer-in-charge. | ||||||
| 6.002. Demolition of RCC/PCC/Brick Masonry/Road will be paid in NET CUM after deductions for air voids as demolished. | ||||||
| 7.00 | CLEANING VEGETATION
Cleaning bushes including uprooting of rank vegetation, green bush wood, trees and saplings of girth upto 30cms (measured at a height of 1m above ground), stacking the serviceable materials and disposal of the same including rubbish etc. upto any lead and all lift as per specification and direction of the Engineer-n-charge. (payment will be made for actual site clearance area only). | 1,950 | SQM | 10 ₹23,010 Lowest | - | 300 ₹6,90,300 |
| 8.00 | TREE CUTTING
Tree cutting (only of girth more than 30 cm above 1m above ground) along with removal of roots and stumps and handing over the same to Owner / Owner's Representative including paying royalties, disposal, taking approval from competent authorities etc. all complete, as per technical specifications and direction of Engineer-in-charge. | 3 | Nos. | 532 ₹1,883.28 Lowest | - | 10,000 ₹35,400 |
| 9.00Note: | ||||||
| 10.001.Rate includes cost of all labour, tools, tackles, hire charges, royalties, levies,loading/unloading, transportation, electric power, illumination and cost of handingover to owner/or his representative etc. complete in all respects as per scope of workand direction of Engineer-in-charge. | ||||||
Tender Value
Refer Docs
EMD Value
₹20 L
Closing Date
20 Apr 2026, 2:00 pmClosed
SINDHU MURIKI
GAIL GAS LIMITED, NEW BEL ROAD, BENGALURU
TWO YEAR ARC FOR SUPPLY CONSTRUCTION ERECTION AND COMMISSIONING OF CIVIL STRUCTURAL ELECTRICAL AND FIRE FIGHTING WORKS FOR LNG STORAGE AND LNG DISPENSING FACILITIES CNG STATION AT BENGALURU AND DAKSHIN KANNADA GA
2026_GAILG_273132_1
GAILGAS/BLR/CnP/25-26/77
Open Tender
Civil Works
Works
730 days
BENGALURU AND DAKSHIN KANNADA
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹20 L
Yes
ONLINE THROUGH MS TEAMS
14 Aug 2026
27 Mar 2026
21 Apr 2026
27 Mar 2026
20 Apr 2026
8 Apr 2026
2 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART - I : CIVIL WORKS | |||||
| 2SITE CLEARANCE | |||||
| 3DEMOLITION OF R.C.C./BRICKS/STONE MASONARY Site clearance by demolition of R.C.C./PCC/Brickwork/Stone Masonry/Stone Soling, Flexible pavements etc. along with removing the debris and disposal of unserviceable material to any lead and staking of serviceable materials, handing over serviceable material to concerned department if required as per technical specifications and direction of Engineer-in-charge. | |||||
| 51. Rate includes cost of all labour, tools, tackles, hire charges, royalties, levies, leads, loading/unloading, transportation, water, electric power, illumination etc. complete in all respects as per scope of work, detailed construction drawings, technical specifications and direction of Engineer-in-charge. | |||||
| 62. Demolition of RCC/PCC/Brick Masonry/Road will be paid in NET CUM after deductions for air voids as demolished. | |||||
| 7CLEANING VEGETATION Cleaning bushes including uprooting of rank vegetation, green bush wood, trees and saplings of girth upto 30cms (measured at a height of 1m above ground), stacking the serviceable materials and disposal of the same including rubbish etc. upto any lead and all lift as per specification and direction of the Engineer-n-charge. (payment will be made for actual site clearance area only). | |||||
| 8TREE CUTTING Tree cutting (only of girth more than 30 cm above 1m above ground) along with removal of roots and stumps and handing over the same to Owner / Owner's Representative including paying royalties, disposal, taking approval from competent authorities etc. all complete, as per technical specifications and direction of Engineer-in-charge. | |||||
| 101.Rate includes cost of all labour, tools, tackles, hire charges, royalties, levies,loading/unloading, transportation, electric power, illumination and cost of handingover to owner/or his representative etc. complete in all respects as per scope of workand direction of Engineer-in-charge. | |||||
| 11EARTH WORK IN EXCAVATION AND BACKFILLING Earthwork in excavation for foundations in ordinary soils including soft rock / disintegrated rock in both dry and wet conditions including pumping and bailing out surface and subsoil water, shoring, strutting, slush removal including backfilling in all positions in layers of 300mm at all heights and depths as per drawings and specifications wherever required, in Foundation pits and other places with excavated suitable surplus earth including reclaiming from spoil heaps kept within the plot including dressing and levelling, watering and mechanical compaction etc.,transporting surplus unserviceable soil upto any lead and spreading in layers and as per specifications and direction of Engineer in charge. The Measurement for payment shall be for the theoretical volume only and it shall be the volume of the block of the excavation having maximum bottom dimension of the levelling course/PCC as per drawing and to actual depth. | |||||
| 12For depth upto 2.0 m. | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.23 MB
VOL2P4.pdf
Tender Documents • 9.18 MB
VOL2P3.pdf
Tender Documents • 5.16 MB
VOL2P2.pdf
Tender Documents • 6.29 MB
VOL2P1.pdf
Tender Documents • 4.78 MB
VOL1.pdf
Tender Documents • 5.13 MB
BOQ_318902.xls
BOQ • 0.84 MB
Corrigendum1.pdf
PDF • 0.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .