| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹28.0 LAdmitted-Finance | -0.21% | ₹28.0 L | L1 | Admitted-Finance |
| 2 | L2₹28.1 L+₹5,837.61 (0.21%)Admitted-Finance | -0.00% | ₹28.1 L+₹5,837.61 (0.21%) | L2 | Admitted-Finance |
| 3 | L3₹28.1 L+₹5,865.68 (0.21%)Admitted-Finance | -0.00% | ₹28.1 L+₹5,865.68 (0.21%) | L3 | Admitted-Finance |
Tender Value
₹33.3 L
EMD Value
₹66,500
Closing Date
18 Aug 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
O/o EXECUTIVE ENGINEER
New construction work from Fakarpur road to Radheshyam Yadavs house
2026_REDUP_1171549_8
191/EERED/FBD/2026-27
Open Tender
Civil Works
Percentage
120 days
FARRUKHABAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹66,500
Yes
25 Aug 2026
12 Aug 2026
18 Aug 2026
12 Aug 2026
18 Aug 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. | 535 | Sqm | 7.12 | ₹3,809.2 |
| 2 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.Clause 300 11.1 | 2.26 | Cum | 376.86 | ₹851.7 |
| 3 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (301.5+302 ii) | 205.2 | Cum | 98.13 | ₹20,136.28 |
| 4 | Construction of Subgrade and Earthen Shoulder with approved soil with all lifts and leads, laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet at least 100 % procter density complete to specification requirements.Clause 301.5 (3.3+3.5) (301.5+302 ii) | 116.65 | Cum | 99.18 | ₹11,569.35 |
| 5 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 171.27 | Cum | 3,185.82 | ₹5,45,635.39 |
| 6 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. | 122.79 | Cum | 4,491.79 | ₹5,51,546.89 |
| 7 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. | 122.79 | Cum | 4,273.29 | ₹5,24,717.28 |
| 8 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85 kg/sqm using mechanical means as per Technical Specification Clause 502 | 1,637.1 | Sqm | 63.08 | ₹1,03,268.27 |
| 9 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.275 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 1,637.1 | Sqm | 20.61 | ₹33,740.63 |
| 10 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm (passing 100% on 22.4 mm sieve and fully retained on 11.2 mm seive ) and 11.2 mm (passing 100% on 13.2 mm sieve and fully retained on 5.6 mm seive) granite stone grits in the ratio 2:1 using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type C as per Technical Specification Clause 508. (using Bitumen 80/100 grade) By Mechanical Means | 1,637.1 | Sqm | 202.82 | ₹3,32,036.62 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_2210842.xls
BOQ • 0.27 MB
04.pdf
Tender Documents • 1.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .