Tender Value
₹1.3 Cr
EMD Value
₹1.1 L
Closing Date
5 Oct 2026, 2:00 pm
CE/TP-I/Guindy/Chennai-32
A10 Thiru vi ka Indl Estate Guindy Chennai 32
SSE works Supply, fabrication, erection of structure, erection of equipments, erection of earth mat, earth raisers, laying of control cable, etc., Upgradation of existing Naidumangalam 33kV SS into 110kV SS.
2026_EB_706467_1
TP1-14/2026-27
Open Tender
Electrical Works
Works
180 days
guindy
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.1 L
Yes
21 Sept 2026
21 Sept 2026
6 Oct 2026
21 Sept 2026
5 Oct 2026
21 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SSE works for for Upgradation of existing Naidumangalam 33/11kV SS into 110/33-11kV SS. | - | - | - | - |
| 2 | Supply, fabrication, sand blasting & Zinc painting of RS Joist 200x100 mm & 200x125 mm including the cost of all materials, transport, labour,lead, lift etc., complete as per IS Specification and as directed by the dept.engineer at site. | 26.25 | MT | - | - |
| 3 | Supply, fabrication, sand blasting & Zinc painting of (125 x 65 /100x50) and MS angle, MS Channels various size including the cost of all materials, transport, labour, lead, lift etc., complete as per IS Specification and as directed by the dept.engineer at site. | 11.65 | MT | - | - |
| 4 | Supply and fabrication of earth electrode 9.00mtr length with 40mm MS Round Rod (10m/6m length)including transport and other charges and erection of earth spikes, including cost of MS Rod 40mm, transport, labour, lead, lift etc., complete as per IS Specification and as directed by the dept.engineer at site. | 4.3 | MT | - | - |
| 5 | Supply of MS Flat (65x10mm) for earth mat MS Flat 50x8 mm thick) and earth raiser to site including the cost of all materials, transport, labour, lead, lift etc., complete as per IS Specification and as directed by the dept.engineer at site. | 12.99 | MT | - | - |
| 6 | Removing, cleaning painting (Aluminium) of first finishing coat of all sections including cost of paint, brush and consumables | 56 | M2 | - | - |
| 7 | Labour for painting (Aluminium) of second finishing coat of all sections including cost of paint, brush and consumables | 56 | M2 | - | - |
| 8 | Labour charges for erection of structure Heavy section structure. (Sectional weight 14kg/m and above) | 26.25 | MT | - | - |
| 9 | Labour charges for Dismantling of structure Heavy section structure. (Sectional weight 14kg/m and above) | 6.87 | MT | - | - |
| 10 | Labour charges for erection of structure Light section structure. (Sectional weight below 14kg/m) | 10.51 | MT | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_849070.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .