| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAdmitted-Fee/PreQual/Technical/Finance | ₹3.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹4.9 L+₹1.2 L (31.1%)Admitted-Fee/PreQual/Technical/Finance | ₹4.9 L+₹1.2 L (31.1%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹5.0 L+₹1.2 L (32.3%)Admitted-Fee/PreQual/Technical/Finance 6 2 SIVAN NORTH CAR STREET PALAYAMKOTTAI TIRUNELVELI 2 | ₹5.0 L+₹1.2 L (32.3%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | MR.SHANKARLAL, CONTRACTOR L2 | Mrs. K. Saradha Contractor L1 | M/S VIJAY INFRATECH L3 |
|---|---|---|---|---|---|---|
| 1.00Improvement of Basket Ball floor in Existing Chief Ministers Mini Stadium Melapalayam in Tirunelveli District | ||||||
| 2.00 | Dismantling the existing PCC and cleaned away from the site including cost of all labour charges etc., complete.(Ref.:- PWD SOR 2025-26, Annex III- Rates of works - Unique Code- W-0034 (Page-30)) | 41.44 | Cum | 520 ₹21,548.8 Lowest | 520.23 ₹21,558.33 | 550 ₹22,792 |
| 3.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 62.16 | Cum | 5,328 ₹3,31,188.48 | 3,730.23 ₹2,31,871.1 Lowest | 5,350 ₹3,32,556 |
| 4.00 | Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) | 414.4 | Sqm | 157.1 ₹65,102.24 Lowest | 157.17 ₹65,131.25 | 160 ₹66,304 |
| 5.00 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. | 2.81 | Sqm | 262 ₹736.22 Lowest | 262.48 ₹737.57 | 300 ₹843 |
| 6.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 75,343.63 ₹75,343.63 | 57,473.69 ₹57,473.69 Lowest | 76,049.1 ₹76,049.1 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
17 Sept 2026, 3:00 pmClosed
Block Development Officer (B.Pt.)
Panchayat Union Office, Palayamkottai
Improvement of Basket Ball Floor in Existing Chief Ministers Mini Stadium Melapalayam in Tirunelveli District
2026_RDTN_699080_4
A3/783/2026
Open Tender
Civil Works
Item Rate
90 days
Palayamkottai Block
Pre Qualification Details
4 documents required · 4 mandatory
₹0
₹5,000
Panchayat Union Office, Palayamkottai
21 Sept 2026
28 Aug 2026
18 Sept 2026
28 Aug 2026
17 Sept 2026
4 Sept 2026
3 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Improvement of Basket Ball floor in Existing Chief Ministers Mini Stadium Melapalayam in Tirunelveli District | - | - | - | - |
| 0.0 | Dismantling the existing PCC and cleaned away from the site including cost of all labour charges etc., complete.(Ref.:- PWD SOR 2025-26, Annex III- Rates of works - Unique Code- W-0034 (Page-30)) | 41.44 | Cum | - | - |
| 0.0 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 62.16 | Cum | - | - |
| 0.0 | Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) | 414.4 | Sqm | - | - |
| 0.0 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. | 2.81 | Sqm | - | - |
| 0.0 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | - | GST Amount (in Rupees) | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
BOQ_840494.xls
BOQ • 0.34 MB
4SingleCoverBasketBallMelapalayam.pdf
Tender Documents • 0.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .