Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.6 LAccepted-AOC INFRONT OF SHANI TEMPLE A B ROAD CROXING JIWAIJGANJ GWALIOR DIST GWALIOR 474001 | GWALIOR | GWALIOR | MADHYA PRADESH | 474001 | ₹4.6 L | 1 | Accepted-AOC Accepted |
| 2 | 2₹4.8 L+₹24,532.77 (5.39%)Rejected-Finance SHOP NO 01 GALI NO 09 250 PHASE 2 PURSHOTTAM NAGAR SEMRA KALAN BHOPAL 462010 | BHOPAL | BHOPAL | MADHYA PRADESH | 462010 | ₹4.8 L+₹24,532.77 (5.39%) | 2 | Rejected-Finance Rejected |
Tender Value
₹4.9 L
EMD Value
₹9,794
Closing Date
26 Mar 2026, 5:30 pmClosed
Executive Engineer
Executive Engineer PWD (E/M) Division No. 02 Bhopal
SUPPLY INSTALLTION TESTING AND COMMISSIONING OF SPLIT AC 2 TON, BATTERY PVC BODY DESERT COOLER/WINDOW COOLER AT REST HOUSE BUILDING ITARSI, SEONI MALWA AND AWALIGHAT DIST NARMADAPURAM
2026_PWDRB_488905_1
59/SAC/2025-26 PWD (E/M) Dn.02 Bhopal (3rd Call)
Open Tender
Electrical Works
Percentage
45 days
narmadapuram
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,000
₹9,794
20 May 2026
10 Mar 2026
30 Mar 2026
10 Mar 2026
26 Mar 2026
10 Mar 2026
SUPPLY INSTALLTION TESTING AND COMMISSIONING OF SPLIT AC 2 TON, BATTERY PVC BODY DESERT COOLER/WINDOW COOLER AT REST HOUSE BUILDING ITARSI, SEONI MALWA AND AWALIGHAT DIST NARMADAPURAM
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
Tenderdocument488905.pdf
Tender Documents • 12.67 MB
BOQ_576608.xls
BOQ • 0.27 MB
SCHEDULE489676.pdf
Other Document • 0.26 MB
MAKE.pdf
Other Document • 4.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .