| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 LAccepted-AOC | ₹7.5 L | L1 | Accepted-AOC ACCEPTED |
| 2 | L2₹7.5 LRejected-Finance | ₹7.5 L | L2 | Rejected-Finance REJECTED |
| Sl No | Description | Qty | Unit | Balachandar L1 | M.Arumugam L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. | 19.32 | cum | 263 ₹5,081.16 | 263.1 ₹5,083.09 |
| 2.00 | Collection and supply of gritty gravel from appd quarry including cost and
conveyance of all materials to site including all labour charges for filling
etc.complete | 13.2 | cum | 521 ₹6,877.20 | 525 ₹6,930 |
| 3.00 | Supplying and filling in foundations and basement with filling M- sand in layers not exceeding 15 cm.thick,well watered,rammed and consolidated etc. complete complying with standard specifications. | 3.67 | cum | 2,206 ₹8,096.02 | 2,207 ₹8,099.69 |
| 4.00 | Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. | 6.52 | Sqm | 5,992 ₹39,067.84 | 5,993 ₹39,074.36 |
| 5.00 | Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications. | 21.5 | cum | 6,232 ₹1.3 L | 6,232.1 ₹1.3 L |
| 6.00 | Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers Lintels, Landing slabs, Landing beam, Portico beam etc.) | 93.89 | Sqm | 547 ₹51,357.83 | 550 ₹51,639.50 |
| 7.00 | Supplying and Fabricating and placing in position MS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and blinding wire all floors etc., complete complying with standard specification. | 1 | MT | 91,944 ₹91,944 | 91,945 ₹91,945 |
| 8.00 | Reinforcement Cement Concrete 1:1.5:3 using 20 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges, centering and shuttering but icluding curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls, sides and bottom of the slabs, beams, etc., shall be finished smooth with cement mortar 1:3, 12mm thick and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. | 10.67 | cum | 9,737 ₹1.0 L | 9,737.1 ₹1.0 L |
| 9.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 22.97 | Sqm | 308 ₹7,074.76 | 310 ₹7,120.70 |
| 10.00 | Plastering with CM 1:5, 12mm thick over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. | 186.49 | Sqm | 289 ₹53,895.61 | 300 ₹55,947 |
Tender Value
₹7.6 L
EMD Value
₹8,000
Closing Date
9 Feb 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER
Panchayat Union Keerapalayam
CONSTRUCTION OF KITCHEN SHED TYPE I at AD WELFARE PRIMARY SCHOOL IN KEELNATHAM PANCHAYAT
2026_RDTN_649666_1
A5/0115/2026-(NP-MDMS-2025-26)
Open Tender
Civil Works - Buildings
180 days
Panchayat Union Keerapalayam
as per Tender
3 documents required · 3 mandatory
₹0
₹8,000
Yes
Panchayat Union Keerapalayam
6 Apr 2026
31 Jan 2026
9 Feb 2026
31 Jan 2026
9 Feb 2026
31 Jan 2026
31 Jan 2026 - 31 Jan 2026
31 Jan 2026
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete
Supplying and filling in foundations and basement with filling M- sand in layers not exceeding 15 cm.thick,well watered,rammed and consolidated etc. complete complying with standard specifications.
Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement.
Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications.
Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers Lintels, Landing slabs, Landing beam, Portico beam etc.)
Supplying and Fabricating and placing in position MS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and blinding wire all floors etc., complete complying with standard specification.
Reinforcement Cement Concrete 1:1.5:3 using 20 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges, centering and shuttering but icluding curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls, sides and bottom of the slabs, beams, etc., shall be finished smooth with cement mortar 1:3, 12mm thick and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Plastering with CM 1:5, 12mm thick over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Plastering with Cement Mortar 1:3 (One Cement and Three Plastering M.Sand) 20mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers.
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 -50mm thick(One Cement, Two sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining,curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers).
Painting the wall two coats with approved weather proof Exterior Emulsion paint over one primer coat of over cement plastered wall surface ect., complete complying with standard specification.
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 -25mm thick(One Cement, Two sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining,curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers).
Supply of Door of size of 0.90 x 2.10 including all labour charges etc.,completed.
Supply of Window of size of 1.20 x 1.30 including all labour charges etc.,completed.
Distembering Two coats over the plastered surface including cost and all other charges etc.,
Painting Two coat approved Emulsion paint over the plastered surface including cost and all other charges etc.,
Painting with new iron work approved colour including all labour charges ertc.,completed.
Provision for Electrification arrangements.Light Point
Tube Light Fittings
Exhaust Fan Point
AC Exhaust Fan 300 mm 12" sweep
Plug Point
CFL 9w Bulb
DPI Switch 500 V
GI Pipe
Service Wire
Provision for Name Board Arrangements
Provision for Water supply Arrangements
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_778915.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_778915.xls
BOQ • 0.27 MB
TENDERDOC.pdf
Tender Documents • 0.51 MB
Download all tender documents and submit your bid